Review Coordinator Shelley Bellm ( sbellm@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Mike Cuthbertson ( mcuthbertson@ranelson.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A5.4.pdf mhaeberle B001 Clarify code compliance for continuos insulation and
R values as required by iECC
Yes | No No 1 Building A5.4.pdf mhaeberle B002 Extend for continuos insulation
Yes | No No 1 Building A5.4.pdf mhaeberle B003 Roof drainage sizing and overflow. Show
compliance with section 1503.4 IBC
Yes | No No 1 Building A5.3.pdf mhaeberle B001 How is veneer to be atached?
Yes | No No 1 Building A5.3.pdf mhaeberle B002 Is drainage provided at base of veneer?
Yes | No No 1 Building A3.2.pdf mhaeberle B001 Clarfiy clearances to grade as required by the IBC
Yes | No No 1 Building A1.3.pdf mhaeberle B001 Show overflow and or scupper to include sizing
Yes | No No 1 Building
4. BFAG
COMcheck
envelope.pdf
mhaeberle B001 Revise to an assembly occupancy per plans
Yes | No No 1 Building A5.7.pdf mhaeberle B001 include u values as identified with comcheck
Yes | No No 1 Building C120.pdf mhaeberle B001 lower than upstream manhole Plumbing plans to
show back water valve
Yes | No No 1 Building T1.pdf mhaeberle B001 Plan to be sealed by registrant per state law
Yes | No No 1 Building Division 26
Electrical.pdf mhaeberle B001 Clarify wiring methods to be used for the assembly
occupancy per the NEC
Yes | No No 1 Building
3. 140919
Specification
Index Issue
H.pdf
mhaeberle B001 Provide accessible signage package anf occupant
load signage to include locations
Yes | No No 1 Building A1.4.pdf mhaeberle B001 Provide cross sectional details showing compliance
with A117.1 ANSI
Yes | No No 1 Building A1.4.pdf mhaeberle B002 Vertical grab bar? Please show on plans
Yes | No No 1 Building E3.0.pdf mhaeberle B001 Clarify exit lighting illumination and batttery backup
for assembly occupancies
Yes | No No 1 Building E3.0.pdf mhaeberle B002 Provide lighting power calculation for interior and
exterior lighting
Yes | No No 1 Building E3.0.pdf mhaeberle B001 All exterior exit landings to have emergency power
illumnation per 1006.3 IBC
Yes | No No 1 Building M1.0.pdf mhaeberle B001 Provide the rest of the comcheck computer model
Yes | No No 1 Building A0.2.pdf mhaeberle B001
Identify on plans items to be deferred submittal and
when they are to be submitted. Reference section
107.3.4.1 IBC.
Yes | No No 1 Building A0.2.pdf mhaeberle B002 Also obligated to comply with the state electrical
code
Yes | No No 1 Building A0.2.pdf mhaeberle B003 Annotate on pkans the required blower door test per
section C402.4.1.2.3 IECC
Yes | No No 1 Building P2.0.pdf mhaeberle B001
Clar5fiy upstream manhole elevation. Appears a
backwater valve shall be required. Revise plans
Section 715 IPC
Yes | No No 1 Building P2.0.pdf mhaeberle B002
Clarify food preperation area by showing compliance
with section 1003 IPC. Note; include approval and
provide documentation from the health department
of food preperation area uses. Revise plans to
reflect code compliance
Yes | No No 1 Building P2.0.pdf mhaeberle B003
Clarfiy floor drains allowed to be used in this area
due to possible chemical drainage. Refernce
section 803 IPC. Please provide written approval
from sewer purveyor
Yes | No No 1 Building S1.00.pdf mhaeberle B001 Please utlize current wind gust factor per 1609 IBC
and ASCE 7
Yes | No No 1 Building S1.00.pdf mhaeberle B002 Soil nailing to be reviewd and accepted by the
engineer of record for the building
Yes | No No 1 Planning A0.0.pdf p001 Changemarks
note #01
The applicant shall provide a performance bond
(financial surety) with the Town of Vail as the
beneficiary in the amount of 125% of the cost of the
completion of the project prior to the issuance of the
permit. Total cost shall include all hard and soft
costs incurred to ensure completion.
Yes | No No 1 Planning A0.0.pdf p001 Changemarks
note #02
A proposed lease area boundary map depicting the
land area to be leased to the applicant for the use
and operation of an education center pursuant to
the Town???s approvals already granted shall be
provided by the applicant for review and approval by
the Town Council.
Yes | No No 1 Planning A0.0.pdf p002 Changemarks
note #01
A DRB Changes to Approved Plans is required to
be reviewed and approved prior to building permit
issuance for any plan deviations from those
presented and approved by the PEC
Please see changemarks for needed materials including
surety, modified lease and DRB application for changes to
approved plans.
Added EHU mitigation fee in Permits Plus
Approved pending Lease with TOV being Signed.
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 FIRE
MIKE VAUGHAN
MVAUGHAN@VAILGOV.COM
APPROVED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PLANNING
JONATHAN SPENCE
JSPENCE@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PUBLIC WORKS TOM KASSMEL
TKASSMEL@VAILGOV.COM
APPROVED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
Task Instructions
Complete Save And Close
Building Process V1
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.