Loading...
HomeMy WebLinkAboutBegin_Workflow-10-23-2014_13-32-44.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Mike Cuthbertson ( mcuthbertson@ranelson.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A5.4.pdf mhaeberle B001 Clarify code compliance for continuos insulation and R­ values as required by iECC Yes | No No 1 Building A5.4.pdf mhaeberle B002 Extend for continuos insulation Yes | No No 1 Building A5.4.pdf mhaeberle B003 Roof drainage sizing and overflow. Show compliance with section 1503.4 IBC Yes | No No 1 Building A5.3.pdf mhaeberle B001 How is veneer to be atached? Yes | No No 1 Building A5.3.pdf mhaeberle B002 Is drainage provided at base of veneer? Yes | No No 1 Building A3.2.pdf mhaeberle B001 Clarfiy clearances to grade as required by the IBC Yes | No No 1 Building A1.3.pdf mhaeberle B001 Show overflow and or scupper to include sizing Yes | No No 1 Building 4. BFAG ­ COMcheck envelope.pdf mhaeberle B001 Revise to an assembly occupancy per plans Yes | No No 1 Building A5.7.pdf mhaeberle B001 include u values as identified with comcheck Yes | No No 1 Building C­120.pdf mhaeberle B001 lower than upstream manhole Plumbing plans to show back water valve Yes | No No 1 Building T1.pdf mhaeberle B001 Plan to be sealed by registrant per state law Yes | No No 1 Building Division 26 ­ Electrical.pdf mhaeberle B001 Clarify wiring methods to be used for the assembly occupancy per the NEC Yes | No No 1 Building 3. 140919 Specification Index ­ Issue H.pdf mhaeberle B001 Provide accessible signage package anf occupant load signage to include locations Yes | No No 1 Building A1.4.pdf mhaeberle B001 Provide cross sectional details showing compliance with A117.1 ANSI Yes | No No 1 Building A1.4.pdf mhaeberle B002 Vertical grab bar? Please show on plans Yes | No No 1 Building E3.0.pdf mhaeberle B001 Clarify exit lighting illumination and batttery backup for assembly occupancies Yes | No No 1 Building E3.0.pdf mhaeberle B002 Provide lighting power calculation for interior and exterior lighting Yes | No No 1 Building E3.0.pdf mhaeberle B001 All exterior exit landings to have emergency power illumnation per 1006.3 IBC Yes | No No 1 Building M1.0.pdf mhaeberle B001 Provide the rest of the comcheck computer model Yes | No No 1 Building A0.2.pdf mhaeberle B001 Identify on plans items to be deferred submittal and when they are to be submitted. Reference section 107.3.4.1 IBC. Yes | No No 1 Building A0.2.pdf mhaeberle B002 Also obligated to comply with the state electrical code Yes | No No 1 Building A0.2.pdf mhaeberle B003 Annotate on pkans the required blower door test per section C402.4.1.2.3 IECC Yes | No No 1 Building P2.0.pdf mhaeberle B001 Clar5fiy upstream manhole elevation. Appears a backwater valve shall be required. Revise plans Section 715 IPC Yes | No No 1 Building P2.0.pdf mhaeberle B002 Clarify food preperation area by showing compliance with section 1003 IPC. Note; include approval and provide documentation from the health department of food preperation area uses. Revise plans to reflect code compliance Yes | No No 1 Building P2.0.pdf mhaeberle B003 Clarfiy floor drains allowed to be used in this area due to possible chemical drainage. Refernce section 803 IPC. Please provide written approval from sewer purveyor Yes | No No 1 Building S1.00.pdf mhaeberle B001 Please utlize current wind gust factor per 1609 IBC and ASCE 7 Yes | No No 1 Building S1.00.pdf mhaeberle B002 Soil nailing to be reviewd and accepted by the engineer of record for the building Yes | No No 1 Planning A0.0.pdf p001 Changemarks note #01 The applicant shall provide a performance bond (financial surety) with the Town of Vail as the beneficiary in the amount of 125% of the cost of the completion of the project prior to the issuance of the permit. Total cost shall include all hard and soft costs incurred to ensure completion. Yes | No No 1 Planning A0.0.pdf p001 Changemarks note #02 A proposed lease area boundary map depicting the land area to be leased to the applicant for the use and operation of an education center pursuant to the Town???s approvals already granted shall be provided by the applicant for review and approval by the Town Council. Yes | No No 1 Planning A0.0.pdf p002 Changemarks note #01 A DRB Changes to Approved Plans is required to be reviewed and approved prior to building permit issuance for any plan deviations from those presented and approved by the PEC Please see changemarks for needed materials including  surety, modified lease and DRB application for changes to  approved plans. Added EHU mitigation fee in Permits Plus Approved pending Lease with TOV being Signed. DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM APPROVED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PUBLIC WORKS TOM KASSMEL  TKASSMEL@VAILGOV.COM APPROVED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup Task Instructions Complete  Save And Close   Building Process V1 window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task.