Loading...
HomeMy WebLinkAboutBegin_Workflow-12-01-2014_13-53-46.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 3 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Mike Cuthbertson ( mcuthbertson@ranelson.com)  CHANGEMARKS ­ Review Cycle:3 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 3 Public Works C­ 110.pdf tkassmel PW001 Tress are not to be removed. These are not part of the Town project Yes | No No 3 Public Works C­ 120.pdf tkassmel PW001 Currently the Town is not planning on designing an accessible walk in this area. Remove note #9 and show replacement of existing walk as a part of this project. Yes | No No 3 Public Works C­ 130.pdf tkassmel PW001 See comment on Sheet C120 Yes | No No 3 Public Works C­ 140.pdf tkassmel PW001 These improvements are not approved to occur, please remove them from the plans Yes | No No 3 Public Works C­ 150.pdf tkassmel PW001 When will these be determined? I was told these may have already been installed in a location not yet approved, and using a TOV spare conduit not approved for this use. Please confirm. Yes | No No 3 Public Works C­ 160.pdf tkassmel PW001 These ramp improvement are not planned. Please remove from plans. Yes | No No 3 Public Works C­ 180.pdf tkassmel PW001 Please see comment on C120 Yes | No No 3 Public Works C­ 310.pdf tkassmel Pw001 Provide Executed lease agreement for extended soil nails Yes | No No 3 Public Works L1.1.pdf tkassmel PW001 Revise landscape plan to reflect this note. Planting cannot be planted on reconstructed walk. Complete  Save And Close   Building Process V1 Yes | No No 3 Public Works L1.1.pdf tkassmel PW002 Show utilities on Landscape plan. Trees cannot be planted in conflict with utilities and not planted on top of Storm sewer, or within 5' of storm sewer, for future maintenance. submit fire alarm and fire sprinkler plans. DEPARTMENT REVIEW ­ Review Cycle:3   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 3 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 3 FIRE MICHAEL MCGEE  MMCGEE@VAILGOV.COM CORRECTIONS REQUIRED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 3 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM APPROVED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 3 PUBLIC WORKS TOM KASSMEL  TKASSMEL@VAILGOV.COM CORRECTIONS REQUIRED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions