Loading...
HomeMy WebLinkAboutDivision 33 - Utilities.pdfTHE EDUCATION CENTER Project No. 122175.00 AT BETTY FORD ALPINE GARDENS Vail, Colorado WATER UTILITY DISTRIBUTION PIPING 33 1100-1 SECTION 33 1100 –WATER UTILITY DISTRIBUTION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section. B. Additional information concerning water distribution systems may be found on the Civil Drawings. In case of conflict between the drawings and the information specified herein, the more stringent requirements shall govern. 1.2 SUMMARY A. Work Included: Excavation, trenching, exploratory excavation (pothole), backfill, bedding, soil stabilization, ground water removal, connection to existing mains, and installation of pipe, fire hydrants, taps, valves, fittings, valve boxes, and all necessary appurtenances. Also includes removal and replacement of existing paving or concrete where required, haul and import of adequate backfill material to meet compaction requirements and removal of existing thrust blocks where necessary. B. Related Sections: 1. Division 31 Section "Site Clearing" for site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities. 2. Division 31 Section “Earth Moving” for soil materials, site excavating, filling and grading. 3. Division 31 Section “Temporary Erosion and Sedimentation Control” for erosion and sediment mitigation. 4. Division 31 Section “Trenching and Backfilling” for excavating and backfilling of utilities. 5. Division 32 Section “Asphalt Paving” for asphalt pavement removal, replacement, materials and testing. 6. Division 32 Section “Concrete Paving” for concrete pavement removal, replacement, materials and testing. C. Permits and Fees: Contractor to obtain and pay for all permits required for work in this Section. Pay all fees for inspections by local authorities and utility agency for work specified in this Section. 1.3 SUBMITTALS A. Product Data: For the following: 1. Piping specialties. 2. Fittings. 3. Valves, valve boxes and accessories. 4. Protective enclosures. B. Shop Drawings: For the following: THE EDUCATION CENTER Project No. 122175.00 AT BETTY FORD ALPINE GARDENS Vail, Colorado WATER UTILITY DISTRIBUTION PIPING 33 1100-2 1. Precast concrete vaults, including frames and covers, ladders, and drains. C. Field Quality-Control Test Reports: From Contractor. D. Test Reports: Submit two (2) copies of laboratory gradation tests for bedding and trench stabilization materials, concrete mix design, asphalt mix designs, and compression test. E. Permits: Submit copies of all permits issued for project. Contractor is responsible for obtaining all applicable utility agency, City, County, and State Permits for the project. F. Certificates: Submit two (2) copies of acceptance from Health Department prior to placing water system in service. G. Locates: Contractor must submit two (2) copies of utility locate drawings/receipts prior to beginning construction. H. As-Builts: Provide Engineer with copies of redlined, as-built plans upon completion of construction. Horizontal and vertical information is to be certified by a Professional Land Surveyor. 1.4 REFERENCE TO EAGLE RIVER WATER AND SANITATION DISTRICT STANDARDS AND SPECIFICATIONS All work of this section shall be performed in conformance to the current published Eagle River Water and Sanitation District Standards and Specifications, current edition and as subsequently revised, which are incorporated into these specifications by reference. Supplementary requirements may be developed by the Engineer to address project-specific conditions, which may supersede the above-referenced specification. END OF SECTION 33 1100 THE EDUCATION CENTER Project No. 122175.00 AT BETTY FORD ALPINE GARDENS Vail, Colorado SANITARY UTILITY SEWERAGE PIPING 33 3100-1 SECTION 33 3100 –SANITARY UTILITY SEWERAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provision of the contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Additional information concerning the sanitary sewer distribution systems may be found on the Civil Drawings. In case of conflict between the drawings and the information specified herein, the more stringent requirements shall govern. 1.2 SUMMARY A. Work Included: Excavation, trenching, removal of existing manholes and piping, backfill, compaction, bedding, soil stabilization, groundwater removal, connection to existing manholes, and installation of pipe, manholes, aggregate base course and gravel where required, service wyes, service lines, asphalt removal and replacement, and all necessary appurtenances and safety precautions. Also includes removal and replacement of existing paving, concrete, topsoil and landscaping where required. B. Related Sections: 1. Division 31 Section "Site Clearing" for site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities. 2. Division 31 Section “Earth Moving” for soil materials, site excavating, filling and grading. 3. Division 31 Section “Temporary Erosion and Sedimentation Control” for erosion and sediment mitigation. 4. Division 31 Section “Trenching and Backfilling” for excavating and backfilling of utilities. 5. Division 32 Section “Asphalt Paving” for asphalt pavement removal, replacement, materials and testing. 6. Division 32 Section “Concrete Paving” for concrete pavement removal, replacement, materials and testing. C. Permits and Fees: Contractor to obtain and pay for all permits required for work in this Section. Pay all fees for inspections by local authorities and utility agency for work specified in this Section. 1.3 SUBMITTALS A. Submit shop drawings or product data showing specific dimensions and construction materials for pipe, fittings, and manholes or certifications that products conform with specifications. B. Test Reports: Submit all field quality control test reports. THE EDUCATION CENTER Project No. 122175.00 AT BETTY FORD ALPINE GARDENS Vail, Colorado SANITARY UTILITY SEWERAGE PIPING 33 3100-2 C. Permits: Contractor is responsible for obtaining all applicable utility agency, City, County and State permits for the project. Submit copies of all permits issued for project. 1.4 REFERENCE TO EAGLE RIVER WATER AND SANITATION DISTRICT STANDARDS AND SPECIFICATIONS All work of this section shall be performed in conformance to the current published Eagle River Water and Sanitation District Standards and Specifications, current edition and as subsequently revised, which are incorporated into these specifications by reference. Supplementary requirements may be developed by the Engineer to address project-specific conditions, which may supersede the above- referenced specifications. END OF SECTION 33 3100 THE EDU AT BETT STORM U SECTION PART 1 - 1.1 A. B. 1.2 A. B. C. 1.3 A. B. C. D. UCATION CE TY FORD AL UTILITY DR N 33 4100 - S GENERAL RELATED D Drawings an Conditions an Additional in case of confl requirements REFERENC State of Col Standard Con Town of Vai Reference St except wher Contract Doc SUMMARY This Section following com Cleano1. Drains2. Precas3. Related Secti Divisio1. utilitie Divisio2. Divisio3. Divisio4. sedime Permits and F Obtain1. Pay al2. this se Existing Util ENTER LPINE GARD RAINAGE PI TORM UTIL DOCUMENT nd general p nd Division 1 nformation co lict between t s shall govern ES lorado, Depar nstruction Spe l Developmen tandards: Co re more strin cuments. Y includes gra mponents: outs. s and inlets. st concrete ma ions include t on 31 Sectio es. on 32 Section on 31 Section on 31 Sectio entation contr Fees: n and pay for ll fees for ins ction. ities DENS PING LITY DRAIN TS provisions of 1 Specificatio oncerning stor the drawings n. rtment of Tr ecifications fo nt Standards, omply with th ngent require avity-flow sto anholes. the following on “Trenchin n “Miscellane n “Earth Mov on “Temporar rol measures. all permits re spections by l NAGE PIPING f the Contra n Sections, ap rm sewer syst and the info ransportation for Road and B Latest Editio he requireme ements are li orm utility dra : ng and Back eous Concrete ving” for Site ry Erosion an equired for the local authorit G act, including pply to this S tems may be rmation spec (CDOT): S Bridge Const on. nts of the ref isted herein ainage piping kfilling” for e Paving” for Grading. nd Sedimenta e work of this ties and utilit Proj g General an Section. found on the cified herein, State Departm truction, curre ference stand or otherwise g outside the excavating a concrete mat ation Contro s section. ty agency for ject No. 1221 Vail, Col 33 4 nd Suppleme civil drawing the more stri ment of High ent edition. dards noted h e required b building, wi and backfillin terials. l” for erosion r work specif 75.00 lorado 100-1 entary gs. In ingent hways herein, by the th the ng of n and fied in THE EDU AT BETT STORM U E. 1.4 A. B. C. 1.5 A. 1.6 A. B. C. 1.7 A. B. C. UCATION CE TY FORD AL UTILITY DR It shal1. horizo propos enough and to propos makin for co structu All standard construction DEFINITION HDPE: High PVC: Polyvi RCP: Reinfo PERFORMA Gravity-Flow Pipe joints sh SUBMITTA Product Data Cleano1. Pipe m2. Manho3. Shop Drawin Precas1. Storm 2. grates. Field Quality performance DELIVERY, Do not store Protect pipe, Handle manh ENTER LPINE GARD RAINAGE PI ll be the Con ontal alignme sed storm util h in advance o verify exist sed storm uti g exploratory nstruction of ures. d details and permit and a NS h Density Pol inyl Chloride orced Concret ANCE REQU w, Nonpressur hall be watert LS a: For each ty outs, inlets an materials. oles. ngs: Include p st concrete ma Water Inlets . y-Control Te requirements , STORAGE plastic inlets, pipe fittings, holes accordin DENS PING ntractor’s res nt, etc.) of a lity drainage to permit an ting vertical ility drainage y excavations f each section d specificatio as required by yethylene Pip Plastic Pipe. te Pipe. UIREMENTS re, Drainage- ight with gask ype of produc nd area drains plans, elevatio anholes and o s. Include pl est Reports: s. AND HAND , pipe, and fit and seals fro ng to manufac sponsibility t all existing u piping line. ny necessary and horizont e piping line s shall be con n of storm ut ons of the ut y the agency. pe. -Piping Pressu keted joint. ct indicated. s. ons, sections, other structure lans elevation Indicate and DLING tings in direc om dirt and da cturer’s writte to excavate a utilities that m All explorat relocation to tal location t e. All costs nsidered to be tility drainag utility agency ure Rating: 1 , details, and es, including ns, sections, d interpret te ct sunlight. amage. en rigging ins Proj and verify th may affect c tory excavatio o be made wi to determine incurred by e included in ge piping line y shall apply 10-foot head attachments f frames, cover details and f est results for structions. ject No. 1221 Vail, Col 33 4 he location (d construction o ons shall occ th minimum alignment fo the Contract n the unit pric e or the assoc y as noted o of water (30 for the follow rs and grates. frames, cover r compliance 75.00 lorado 100-2 depth, of the cur far delay or the tor in ce bid ciated on the kPa). wing: rs and e with THE EDU AT BETT STORM U D. E. F. PART 2 - 2.1 A. 2.2 A. B. C. 2.5 A. 2.6 A. UCATION CE TY FORD AL UTILITY DR Handle storm Deliver pipi blocking as r Exercise care not drop pipe PRODUCTS MANUFACT In other Part product selec Availa1. offerin manuf Manuf2. manuf PVC PIPE A PVC Pressur elastomeric s Fitting1. AWW Fitting2. AWW PVC Sewer with bell-and PVC Sewer thickness, wi HDPE PIPE ASTM D33 maximum b ASTM F477 CONCRETE RCP Sewer P ENTER LPINE GARD RAINAGE PI m water inlets ng in manu required. Lab e to prevent d e or fittings. S TURERS t 2 articles wh ction: able Manufac ng products th facturers spec facturers: Sub facturers spec AND FITTING re Pipe: AW seals. gs NPS 4 to N WA C907, for g gs NPS 10 (D WA C153, for p Pipe and Fitt d-spigot ends Pipe and Fit ith bell-and sp AND FITTIN 50, AASHT burial depth, 7. E PIPE AND F Pipe and Fitti DENS PING according to facture’s ori bel or tag each damage to ma here titles be cturers: Sub hat may be in ified. bject to comp ified. GS WWA C900, NPS 8 (DN 1 gasketed join DN 250) and push-on joint tings, NPS 1 for gasketed j ttings, NPS 1 pigot ends for NGS O M294. P bell and spi FITTINGS ings: Accord manufacture ginal bundle h bundle with aterials during elow introduc bject to com ncorporated in pliance with r Class 200, fo 100 to DN 20 nts and using A Larger: Du ts and using A 5 (DN 375) joints with A 18 (DN 450) r gasketed joi Profile wall got joint wit ding to the foll er’s written rig es, securely h type, size an g loading, tra ce lists, the fo mpliance with nto the Work requirements, or gasketed j 00): PVC pr ASTM F 477 uctile-iron, co AWWA C111 15” and Sma ASTM F 477, ) 18” and La ints with AST – Type S 2 th water-tigh lowing: Proj gging instruct strapped, an nd quantity of ansportation a ollowing requ h requiremen k include, but , provide prod joints and us ressure fitting 7, elastomeric ompact fitting 1, rubber gask aller: ASTM elastomeric s arger: ASTM TM F 477, ela 2’ minimum ht, non-cleatin ject No. 1221 Vail, Col 33 4 tions. nd with prote f material. and unloading uirements app nts, manufac are not limit ducts by one ing ASTM F gs complying seals. gs complying kets. M D 3034, SD seals. M F 679, T-1 astomeric seal burial depth ng, O-ring g 75.00 lorado 100-3 ective g. Do ply to cturers ted to, of the F 477, g with g with DR 35 1 wall ls. h, 10’ gasket, THE EDU AT BETT STORM U 2.7 A. B. 2.8 A. B. 2.9 MAN A. UCATION CE TY FORD AL UTILITY DR ASTM1. horizo noted. Joints:2. circula Flared3. Provid NONPRESS Comply wit joining unde corrosion-res Sleeve Mate For Co1. For Pl2. For D3. materi CLEANOUT Gray-Iron C round, secur connection a 1. Availa a. J a. b. c. d. e. f. Top-L2. Sewer 3. and fit PVC Cleanou to cleanout o NHOLES Precast Conc with provisio ENTER LPINE GARD RAINAGE PI M C 76 and A ontal elliptical : Water tigh ar concrete se d End Section de manufactur SURE-TYPE th ASTM C 1 erground nonp sistant-metal rials: oncrete Pipes astic Pipes: A Dissimilar Pip ials being join TS leanouts: AS red, scoriated, and countersu able Manufact Josam Compa MIFAB Man Smith, Jay R Wade Div.; T Watts Industr Watts Industr Zurn Industri Loading Class Pipe Fitting ttings. uts: PVC bo f same mater crete Manhol on for sealant DENS PING ASTM C 506 l pipe, respec ht joints mee ewer and culv ns: No stand res specificati PIPE COUPL 1173, elastom pressure pipin tension band : ASTM C 44 ASTM F 477, pes: ASTM ned. SME A112.36 , gray-iron co unk, tapered-th turers: any. nufacturing In R. Mfg. Co. Tyler Pipe. ries, Inc. ries, Inc.; Enp ies, Inc.; Zurn ification(s): H and Riser to dy with PVC ial as sewer p les: ASTM joints. 6 and ASTM ctively. Pipe eting ASTM vert pipe, usin dard specifica ions with sho LINGS meric, sleeve ng. Include e and tightenin 43 (ASTM C , elastomeric D 5926, PV 6.2M, round, over. Include hread, brass c nc. poco, Inc. Div n Specificatio Heavy duty. Cleanout: A C threaded plu piping. C 478, preca M C 507 for c shall be Clas C443 Stand ng rubber gask ations apply t op drawings to e-type, reduci ends of same ng mechanism C 443m), rubb seal or ASTM VC or other m gray-iron hou e gray-iron fe closure plug. v. on Drainage O ASTM A 74, S ug. Include P ast, reinforced Proj circular, arch ss III, Wall B dard Specifica kets. to concrete fl o Owner’s Re ing or transi sizes as pipin m on each end ber. M D 5926, PV material com using with cla errule with in Operation. Service class, PVC sewer pi d concrete, o ject No. 1221 Vail, Col 33 4 h, and vertica B, unless othe ation for join lared end sec epresentative. ition coupling ng to be joine d. VC. mpatible with amping devic nside calk or s cast-iron soi ipe fitting and of depth indi 75.00 lorado 100-4 al and erwise nts in ctions. . g, for ed and h pipe ce and spigot il pipe d riser cated, THE EDU AT BETT STORM U B. C. D. UCATION CE TY FORD AL UTILITY DR Diame1. indicat Ballast2. as requ Base S3. thickn Riser 4. length Top S5. size th Resilie6. walls, Manhole Join the joint betw preformed, fl The fl1. 00210 The pl2. proper protec remov wrapp shall b concre alkalie All sur3. approv applica strict c quanti All lift4. Manhole Step be installed i time the barr grouted in th with a nomin Alumi1. surface manho Polypr2. a. b. c. Manhole Gr thickness, to ENTER LPINE GARD RAINAGE PI eter: As sho ted). t: Increase th uired to preve Section: 6-in ess as noted o Sections: 4- s to provide d ection: Ecce hat matches gr ent Pipe Con for each pipe nt Sealant: A ween the cast- lexible plastic lexible plasti , “Sealing Co lastic sealing r size to com ted by a sui ved as the co er, which rem be impermea ete surface, an es. rfaces of the ved priming ation of the p conformance ty of material fting holes sha ps: All manh in a straight l rel section is he wall after nal spacing of inum, Federal e of step and ole. ropylene Rein ASTM C-478 ASTM A-61 ASTM 2146 ade Rings: match diame DENS PING wn on drawi hickness of p ent flotation. nch (150-mm on plans for w inch (100-mm depth indicate entric-cone ty rade rings. nnectors: AS e connection. All joints in th -in-place base c gasket confo ic gasket sha ompound, Pre compound sh mpletely fill th itable, remov ompound is a mains attached able to water nd shall main tongue and g compound p priming comp with the man l, the grade of all be sealed w hole steps sha line vertically cast. Excep the wall has f 15 inches (3 l specification capable of ca nforced Plasti 8. 5 Grade 60 (s 69, Type II G Reinforced-c eter of manhol ings (48 inch precast concre m) minimum walls and base m) minimum ed. ype unless flat TM C 923 (A he manhole b e slab and the orming to the all be in con eformed Plasti hall be packag he joint whe vable, two-pi applied to the d to the comp , have high ntain permane roove joint o prior to the i pound and the nufacturer’s i f the material with the plasti all be similar y. Manhole s pt for unusual been cast wi 75-mm) and 6 n QQ-A-200/ arrying load o ic: ASTM Sp steel rod). Grade 16906 ( concrete ring le frame and hes (1200 mm ete sections o thickness fo e riser section m thickness or at-slab-top typ ASTM C 923M barrel, cone an e bottom barr e following re nformance wi ic, for Expan ged in extrude en fully comp ece wrapper e joint surfac pound for pro immediate b ent plasticity, f the manhole installation o e sealing com instructions, a ls, and the app ic sealing com and equal to steps shall be l circumstanc ill not be acc 6 inches (150 /8, or ALMA of 1000 lbs. 6 pecifications. (polypropylen gs, 3-inch to cover. Proj m) minimum or add concre or floor slab n. r as noted on pe is indicate M), cast or f nd/or flat top rel section sha equirements: ith Federal S sion Joints an ed preformed pressed. The so that one ce without di otection. The bonding stren , resistance to e barrel shall f the sealing mpound shall b as to the meth plication temp mpound. those specifi e cast into th ces, steps wh cepted. Steps 0-mm) from f AG35. Two n 6 inches (150 ne). 9-inch (75 ject No. 1221 Vail, Col 33 4 m, unless othe ete to base se and the min n the plans an d. Top of co fitted into ma sections incl all be sealed w Specification nd Pipe Joints d rope-like sha e material sh e wrapper ma isturbing the sealing comp ngth to the p o water, acids be primed w g compound. be accomplish hod of applic peratures. ed below and he wall at the hich are insert s shall be ins face of manho non-skid groov 0 mm) from fa to 225-mm) 75.00 lorado 100-5 erwise ection, nimum nd the one of anhole luding with a SS-S s.” ape of all be ay be other pound rimed s, and with an The hed in cation, d shall same ted or stalled ole. ves in ace of ) total THE EDU AT BETT STORM U F. 2.11 A. PART 3 - 3.1 A. B. 3.2 A. 3.3 A. B. UCATION CE TY FORD AL UTILITY DR Manhole Fra lbs shall be m Include inden SEWER." Materi1. Protec2. hot dip otherw STORM WA Area Inlets: EXECUTIO EARTHWOR Site excavati Excavation a Backfilling.” PREPARAT Piping: Prior mud, oil, sha PIPING INST General Loc arrangement practical. W instructions. General: Use on1. Lay pi2. lines a smooth Begin 3. contac Plug e4. to man Trench5. Divisio ENTER LPINE GARD RAINAGE PI ames and Cov machined to f nted top desig ial: ASTM A ctive Coating: pped asphalt; wise indicated ATER INLET Type and ma ON RK on and filling and backfillin ” ION r to installatio avings from cu TALLATION cations and of undergrou Where specifi nly undamage ipe on firm b and uniform h and clean. all pipe insta ct with specifi ends temporar nholes or inlet h excavation a on 31 Section DENS PING vers: Ring an fit securely w gn with letteri A 48, Class 35 Foundry-ap 10-mil (0.26 d. TS anufacture as g are specified ng for utilitie on, verify tha utting, or othe N Arrangement und storm util ic installation ed material. bedding with grades betw allation at dow ied bedding. rily during ins t structures. and placemen n “Trenching nd cover shal ith non-rocki ing cast into c 5 gray iron, un pplied, SSPC- 6-mm) minim indicated on d in Division es are specifi at insides of p er deleterious ts: Drawing lity drainage n is not indic full length o ween invert e wnstream end Place bell or stallation, unt nt and compac and Backfilli ll have a com ing cover, and cover, using w nless otherwi -Paint 16, coa mum thicknes plans. 31 Section “E ied in Divisi pipe and pipe j s materials. g plans and piping. Insta cated, follow of barrel fully elevations sho d of pipe run, groove ends til connection ction of bedd ing.” Proj mbined weigh d shall be hot wording equiv se indicated. al-tar, epoxy-p s applied to a Earth Moving ion 31 Sectio joints are cle details indi all piping as i w piping man y supported. own. Inside , with lower facing upstre ns are made to ding and back ject No. 1221 Vail, Col 33 4 ht greater tha t-dipped in as valent to "ST polyamide pa all surfaces, u g.” on “Trenching ean and free o icate location indicated, to e nufacturer's w Maintain st e of pipe sha segment of p eam. o adjoining p kfill are specif 75.00 lorado 100-6 an 400 sphalt. TORM aint or unless g and of dirt, n and extent written traight all be pipe in ipe or fied in THE EDU AT BETT STORM U C. D. E. F. G. 3.4 A. B. C. 3.5 A. B. C. UCATION CE TY FORD AL UTILITY DR Install piping continuity of and coupling and other ins grout. Install manho connections u Install proper and fittings a Tunneling: I jacking, or a Install gravity Install 1. Install 2. Install 3. “Conc Install 4. CLEANOUT Install cleano iron soil pipe extensions to Set cleanout by 6 inches d grade. Set cleanout MANHOLE General: Ins Install precas Manholes: Constr1. jurisdi concre Slope 2. at face lower ENTER LPINE GARD RAINAGE PI g beginning f invert. Plac gs according stallation requ oles for chan unless direct t r size increase are connected Install pipe un combination y-flow, nonpr piping pitche PVC sewer p reinforced-c crete Pipe inst HDPE piping T INSTALLA outs and riser e fittings in se o cleanouts. I frames and c deep (450 by frames and co INSTALLAT tall manholes st concrete ma ruct manhole iction standar ete manhole b floor of manh e of manhole half of pipe. DENS PING at low point, ce bell ends o to manufactu uirements. Pl nges in directi tap into existi ers, reducers, . Reducing s nder streets or of both. ressure draina ed down in di pipe accordin concrete sew tallation Manu g per manufa ATION r extensions fr ewer pipes at nstall piping covers in earth y 450 by 150 overs in pave TION s, complete w anhole section es in accord rds. Carry pip base at least 8 hole from cen e. Shape inv , true to grad of piping faci urer’s written lug all lifting ion unless fit ing sewer is i , and coupling ize of piping r other obstru age piping ac irection of flo ng to ASTM D wer piping ac ual.” acturer’s recom from sewer pi branches for so cleanouts h in cast-in-p mm). Set w ement with top with appurtena ns with sealan dance with pe through m inches below nterline of pip ert when man des and align ing upstream. n instructions g holes in pip ttings are ind indicated. gs where diff in direction o uctions that ca cording to the ow, at slopes i D 2321 and A ccording to mmendation. ipes to cleano cleanouts an open in direc place-concrete with tops 1 in ps 1/8 inch be ances and acc nts according drawings an manhole with s w pipe barrel. pe to maximu nhole base is Proj nment indicat . Install gask for use of lu pe with approv dicated. Use ferent sizes or of flow is pro annot be distu e following: indicated on p ASTM F1668. ASTM C 1 outs at grade. d cast-iron va ction of flow i e block, 18 in nch (25 mm) elow paveme cessories indic g to ASTM C nd applicabl split pipe. Ex um of 2 inches s poured to c ject No. 1221 Vail, Col 33 4 ted with unb kets, seals, sle ubricants, cem ved rubber pl fittings for b r materials of hibited. urbed by tunn plan. 479 and AC Use PVC or alve boxes for in sewer pipe nches by 18 i above surrou nt surface. cated. 891. le agency h xtend cast-in- s above top o conform exac 75.00 lorado 100-7 broken eeves, ments, lug or branch f pipes neling, CPA’s r cast- r riser . inches unding having -place f pipe ctly to THE EDU AT BETT STORM U D. 3.6 A. B. C. UCATION CE TY FORD AL UTILITY DR Form 3. expand connec Extend4. Place 5. extend practic Do no6. placem placing Place a7. in suff Join ea side of Trim a8. Manhole Rin Set top1. pavem indicat Where2. where final g concre INLETS INS Set frames an Cast-in1. having Sectio Constr2. of pipe Embed3. frames Frames, Gra drawings. A Connection t Cut an1. require Core d2. thickn Seal a3. space b ENTER LPINE GARD RAINAGE PI or shape inv dable plug in ct to main inv d concrete bas future extens ded to outside cal to manhol ot place preca ment of concr g manhole ba a complete an ficient quanti ach succeedin f tongue and g away all exce ngs and Cover ps of frames ments. Set top ted. e finished sur a maximum grade. Final ete rings with STALLATION nd grates to e n-place or pr g jurisdiction n “Miscellane ruct inverts o e. Form perim d steel angles s, grates, or co ates, Covers nchor casting to Existing Str nd patch or re ed to receive drill opening ess for morta round new p between pipe DENS PING verts smooth n pipe. Con vert. se ring minim sion of pipe f e face of man e base. ast manhole rete base. Th arrel sections. nd continuous ty that when ng precast ma groove joints ss material an rs: and covers 1 ps 1 inch (25 rface will be of two cours l elevations a minimum o N levations indi recast concre n standards. eous Cast-in- f pipe or con meter bench a s or other acc overs. and Steps: gs in place and ructures: ebuild existin new drain lin gs to receive r bed to form ipe penetratio e and cut open and clean, w nstruct side b mum 3 inches from manhole nhole base an sections on m horoughly cle s roll of sealan precast manh anhole barrel . nd repair all li /8 inch below mm) above f completed a ses of brick w of lid will b of 6 inches an icated. ete in accorda Comply wit Place Concre crete smooth as indicated. cessories as i Install accur d set in adjust ng manhole, c nes. new pipe. m new invert. on with expa ning to provid with no obstru branches with above top of es in manhole and terminate manhole base an top of form nt in groove o hole barrel is in similar ma ifting holes. w finished sur finished surfa after manhole will be requi be adjusted w nd a maximum ance with dr th applicable ete.” hed inverts sam indicated or r urately to pla tment mortar catch basins, Chip existin andable water de a watertigh Proj uctions. Allo h radii as lar f pipe. e base. Shap d with bell o e for two da med concrete or keyway of s placed there anner. Instal rface of manh ace elsewhere e constructio ired to adjust with bricks, m of 18 inche rawings and e requiremen me size as pip required to a acement dime r to assure a fi or other drai ng bench to rstop sealant, ht repair. ject No. 1221 Vail, Col 33 4 ow insertion rge as possib pe invert with of pipe as clo ays minimum e base ring pr f concrete bas e will be no v ll sealant in g holes that oc e, unless othe n, set top of t ring and cov mortar or p es of adjustme applicable ag nts of Divisio pe up to cent anchor and su ensions show irm foundatio inage structu provide suff completely f 75.00 lorado 100-8 of an ble to h pipe ose as m after rior to se ring voids. groove cur in erwise f cone ver to recast ent. gency on 03 terline upport wn on on. ures as ficient filling THE EDU AT BETT STORM U 3.7 A. 3.8 A. 3.9 A. B. C. UCATION CE TY FORD AL UTILITY DR CONCRETE Place cast-in- IDENTIFICA Materials and for installatio structures. Use d1. structu FIELD QUA Inspect interi Inspect after of Project. Submi1. Defect2. a. b. c. d. e. Replac3. within Reinsp4. Test new pip repaired, for Do not1. Test c2. jurisdi Schedu3. advanc Submi4. Gravit5. author a. b. Leaks and lo ENTER LPINE GARD RAINAGE PI E PLACEMEN -place concre ATION d their install on of green w detectable wa ures. ALITY CONT ior of piping t approximatel it separate rep ts requiring co Alignment: L Deflection: cylinder of si Crushed, bro Infiltration: Exfiltration: ce defective p n allowances s pect and repea ping systems leaks and def t enclose, cov completed p iction. ule tests and ce notice. it separate rep ty-Flow Stor rities having j Option: Test Option: Test ss in test pres DENS PING NT ete according lation are spe warning tape arning tape o TROL to determine ly 24 inches ( port for each s orrection incl Less than full Flexible pip ize not less th oken, cracked, Water leakag Water leakag piping using specified. at procedure u , and parts o fects. ver, or put int piping system inspections b port for each t rm Utility D urisdiction, U t plastic pipin t concrete pip ssure constitu to ACI 318/3 ecified in Div directly over over nonferro whether line (610 mm) of system inspec lude the follow l diameter of ping with de han 92.5 perce , or otherwise ge into piping ge from or aro new materia until results a of existing sy o service befo ms according by authoritie test. Drainage Pipi UNI-B-6, and ng according t ping according ute defects tha 318R. vision 31 Sec r piping and a ous piping an displacement f backfill is in ction. wing: inside of pipe eflection that ent of piping e damaged pip . ound piping. als, and repea are satisfactor ystems that h fore inspection g to require es having juri ing: Test the following to ASTM F 1 g to ASTM C at must be rep Proj ction “Earth M at outside ed nd over edge nt or other dam n place, and a e is visible be at prevents p diameter. ping. at inspection ry. have been alt n and approva ements of a isdiction with according to g: 417. C924 (ASTM paired. ject No. 1221 Vail, Col 33 4 Moving.” Ar ge of underg es of underg mage has occu again at comp etween structu passage of ba ns until defec tered, extende al. authorities h h at least 24 o requiremen C 924M). 75.00 lorado 100-9 rrange ground ground urred. pletion ures. all or cts are ed, or having hours nts of THE EDU AT BETT STORM U D. 3.10 A. END OF UCATION CE TY FORD AL UTILITY DR Replace leak allowances sp CLEANING Clean interio potable water SECTION 33 ENTER LPINE GARD RAINAGE PI king piping pecified. or of piping, r. 3 4100 DENS PING using new inlets and m materials, an manholes of nd repeat te dirt and sup Proj esting until perfluous mat ject No. 1221 Vail, Col 33 41 leakage is w terials. Flush 75.00 lorado 00-10 within h with