HomeMy WebLinkAboutBegin_Workflow-10-21-2014_15-15-10.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Sarah Wyscarver ( sarah@srebuilds.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A1.1.pdf mhaeberle B001 Not allowed per Table R302.1 of the IRC unless all
dwellings have automatic sprinkler systems
Yes | No No 1 Building A1.1.pdf mhaeberle B002 Must be 1 hour per Table R302.1 Provide referenced
detail showing compliance
Yes | No No 1 Building A1.1.pdf mhaeberle B003 How is roof drainage being maintained on property?
Yes | No No 1 Building AC2.pdf mhaeberle B001 Show terminaton of foundation drain per structural
drawings
Yes | No No 1 Building A1.0.pdf mhaeberle B001
Provide crossectional details showing how code
complliance is achieved for fire resistive
assemblies, weather protection and flashing,
insulation, roof covering, and glazing
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Complete Save And Close
Building Process V1
1 FIRE MIKE VAUGHAN
MVAUGHAN@VAILGOV.COM
APPROVED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PLANNING
WARREN CAMPBELL
WCAMPBELL@VAILGOV.COM
APPROVED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.
Task Instructions