Loading...
HomeMy WebLinkAboutBegin_Workflow-10-14-2014_15-55-36.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A3.2.pdf mhaeberle B001 Vent cap? please show Yes | No No 1 Building A3.2.pdf mhaeberle B002 Roofing material? Class A Yes | No No 1 Building A2.1.pdf mhaeberle B001 1. Provide gas piping plans per submittal requirements 2. Proivde electricla load clalculations showing compliance iwth the building code for additional loads. Yes | No No 1 Building A2.1.pdf mhaeberle B002 Provide u value of proposed door Yes | No No 1 Building S1­ SPEC.pdf mhaeberle B001 Show location of drain termination on site plan Yes | No No 1 Building S1­ SPEC.pdf mhaeberle B002 Please clarify compliance with section 1705.9 IBC 2012 edition Yes | No No 1 Building S1­ SPEC.pdf mhaeberle B003 Provide engineered design for proposed boulder retaining walls Yes | No No 1 Building S1­ SPEC.pdf mhaeberle B004 Where on plans? No architectural details provided Yes | No No 1 Building S1­ SPEC.pdf mhaeberle B005 Is not detailed on architectural. How is it attached? Complete Review  Request Additional Group  Save & Close   Building Process V1 Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 PLANNING WARREN CAMPBELL  WCAMPBELL@VAILGOV.COM ­select status­ VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Chief of Planning Chief of Building Fire Marshal Wildland Fire