HomeMy WebLinkAboutBegin_Workflow-10-14-2014_15-55-36.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Shelley Bellm ( sbellm@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A3.2.pdf mhaeberle B001 Vent cap? please show
Yes | No No 1 Building A3.2.pdf mhaeberle B002 Roofing material? Class A
Yes | No No 1 Building A2.1.pdf mhaeberle B001
1. Provide gas piping plans per submittal
requirements 2. Proivde electricla load clalculations
showing compliance iwth the building code for
additional loads.
Yes | No No 1 Building A2.1.pdf mhaeberle B002 Provide u value of proposed door
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B001 Show location of drain termination on site plan
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B002 Please clarify compliance with section 1705.9 IBC
2012 edition
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B003 Provide engineered design for proposed boulder
retaining walls
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B004 Where on plans? No architectural details provided
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B005 Is not detailed on architectural. How is it attached?
Complete Review Request Additional Group Save & Close
Building Process V1
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 PLANNING WARREN CAMPBELL
WCAMPBELL@VAILGOV.COM
select status
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
Corrections Required
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Requested Groups
0 Groups Selected Remove all Add all
Chief of Planning
Chief of Building
Fire Marshal
Wildland Fire