HomeMy WebLinkAboutBegin_Workflow-10-28-2014_15-57-17.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Shelley Bellm ( sbellm@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Shelley Bellm ( sbellm@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No Yes 1 Building A3.2.pdf mhaeberle B001 Vent cap? please show
vent cap shown on roof plan
and elevations
Yes | No No 1 Building A3.2.pdf mhaeberle B002 Roofing material? Class A
Yes | No No 1 Building A2.1.pdf mhaeberle B001
1. Provide gas piping plans per submittal
requirements 2. Proivde electricla load clalculations
showing compliance iwth the building code for
additional loads.
Yes | No No 1 Building A2.1.pdf mhaeberle B002 Provide u value of proposed door
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B001 Show location of drain termination on site plan
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B002 Please clarify compliance with section 1705.9 IBC
2012 edition
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B003 Provide engineered design for proposed boulder
retaining walls
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B004 Where on plans? No architectural details provided
Yes | No No 1 Building S1
SPEC.pdf mhaeberle B005 Is not detailed on architectural. How is it attached?
Complete Save And Close
Building Process V1
Yes | No No 1 Public
Works A1.1.pdf tkassmel PW001 Show top and bottom of wall elevations. No
retaining wall can exceed 6'
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
1 PLANNING
WARREN CAMPBELL
WCAMPBELL@VAILGOV.COM
APPROVED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.
Task Instructions