HomeMy WebLinkAbout14077.00 - Solaris Clubhouse for Inspirato_Part1.pdfMECHANICAL SPECIFICATIONS:
1. GENERAL:
a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH,
FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED
HEREIN.
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM
WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS,
BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE
PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING
DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO
AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM
ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY
FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK.
b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND
FUNCTIONAL SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION
WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION.
5. CODES AND PERMITS:
a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012 INTERNATIONAL
MECHANICAL CODE (IMC), 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND ORDINANCES AS
INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.
c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT.
6. AS-BUILTS:
a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED
THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
7. GUARANTEE:
a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST
DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION.
8. SUBMITTALS:
a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES (WITH ALL OPTIONS CLEARLY MARKED)
SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH). ELECTRONIC SUBMITTALS
PREFERRED.
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT
OF ALL DUCTS, PIPES, CONDUIT, ETC.
10. CUTTING AND PATCHING:
a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED
UNDER OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X-RAY SLABS PRIOR TO CORING.
11. CLEANUP:
a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS
MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND
ORDERLY.
12. MECHANICAL IDENTIFICATION
a. EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR PERMANENT ATTACHMENT ON
EQUIPMENT.
b. PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE, AND SHOWING
DIRECTION OF FLOW.
c. VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEM ABBREVIATION AND 1/2"
NUMBERS, WITH NUMBERING SCHEME. PROVIDE 5/32" HOLE FOR FASTENER.
d. VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THE MAINTENANCE
ENGINEER FOR RECORD.
13. DUCTWORK:
a. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2012 IMC AND SMACNA
STANDARDS.
b. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS. DUCTWORK SIZES
INDICATED ARE FREE CLEAR DIMENSIONS.
c. ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE WITH VERSA GRIP OR
MESH.
d. ALL FINAL CONNECTIONS TO SUPPLY GRILLES SHALL BE COMPLETED WITH ACOUSTICAL FLEXIBLE DUCT
UNLESS OTHERWISE NOTED ON THE PLANS.
e. FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE UL APPROVED, VINYL COATED, WIRE REINFORCED
FIBERGLASS, WITH MAXIMUM THERMAL CONDUCTIVITY OF 0.30 BTU-IN/HR-FT2-F AND A MAXIMUM LENGTH
OF FIVE FEET.
f. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSURE DROP PER 100 FEET.
g. EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BE EQUIPPED WITH A MEANS
OF SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON
FAN SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND/OR DISCHARGES.
h. CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE INSTALLATION
i. '28%/(7+,&.1(667851,1*9$1(66+$//%(86('21$//'8&7785162)
14. DUCTWORK INSULATION:
n. ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 604 OF THE
2012 IMC.
o. INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND
SMOKE DEVELOPED INDEX NOT MORE THAN 50, PER THE 2012 IMC. INSTALLATION SHALL BE IN
ACCORDANCE WITH IMC REQUIREMENTS.
p. RECTANGULAR SUPPLY, RETURN & TRANSFER DUCTWORK SHALL BE INTERNALLY LINED WITH A VAPOR
RESISTANT DUCT LINER OF THICKNESSES SPECIFIED BELOW.
q. CONCEALED ROUND, CONCEALED OVAL & OUTDOOR AIR DUCTS SHALL BE EXTERNALLY WRAPPED WITH
FIBERGLASS INSULATION WITH AN EXTERNAL VAPOR BARRIER. REQUIRED R-VALUES ARE SPECIFIED
BELOW.
r. ALL SUPPLY, RETURN & TRANSFER DUCTWORK LOCATED WITHIN THE BUILDING ENVELOPE SHALL BE
,168/$7('72$0,1,0802)5ߛ´/,1(5ߜ81/(6663(&,),('27+(5:,6(217+(3/$16
s. $//6833/<ߙ5(7851'8&7:25.6+$//%(,168/$7('72$0,1,0802)5ߛ´/,1(5ߜ:+(1
/2&$7(',181&21',7,21('63$&(6$1'6+$//%(,168/$7('72$0,1,0802)5ߛ´/,1(5ߜ$1'
WEATHERPROOFED WHEN LOCATED OUTSIDE THE BUILDING.
t. ALL OUTDOOR AIR DUCTS SHALL BE INSULATED TO A MINIMUM OF R-6 WITH A VAPOR BARRIER.
15. TEMPERATURE CONTROL DEVICES:
a. RE-USE EXISTING DEVICES.
16. GAS APPLIANCE VENTING:
a. ACCEPTABLE VENT MATERIALS, ROUTING, DISTANCE AND TERMINATION LOCATIONS SHALL COMPLY WITH
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND ALL REQUIREMENTS IN CHAPTER 8 OF THE 2012 IMC.
17. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A
COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC,
ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF
CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID
CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE.
CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR.
18. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND
PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY
BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS
WITH APPROPRIATE EQUIPMENT REQUIREMENTS.
19. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE
IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF THE
EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR.
20. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED
VIBRATION ISOLATORS.
21. EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO INSURE PROPER
FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND CAPACITIES,
ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION.
22. TEST & BALANCING:
a. THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED TEST
AND BALANCE COMPANY.
b. 5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND
APPROVAL. ELECTRONIC DISTRIBUTION PREFERRED.
c. ALL REQUIRED RE-SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE
CONTRACTOR.
d. ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS.
24. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS,
ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT).
25. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE
DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER
MANDATED SERVICE REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET
FROM AN ACCESS PANEL.
26. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION, OPERATION &
MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES.
27. FILTERS:
a. SHALL BE UL RATED AND APPROVED.
b. PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE.
28. ELECTRICAL CONNECTIONS:
a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, LOW VOLTAGE
THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLENOID VALVES SHALL BY
FURNISHED BY THE MECHANICAL CONTRACTOR.
b. PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS INDICATED ON THE
DRAWINGS.
c. IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE CONTRACT DOCUMENTS.
d. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITH OTHER
TRADES, SO THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL.
e. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION.
f. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICAL
CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR.
RADIANT FLOOR SUPPLY
RADIANT FLOOR RETURN
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
MECHANICAL LEGEND
MEDIUM PRESSURE NATURAL GAS
SNOWMELT RETURN
SNOWMELT SUPPLY
GAS
HWS
T
A
B
HWR
CWS
CWR
SMS
SMR
RFS
RFR
G
MPG
PIPE RISER
PIPE DROP
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PIPE TAKEOFF (FROM TOP OF MAIN)
PIPE END CAP
PIPE CONTINUATION
PIPE EXPANSION GUIDE
PIPE UNION
PIPE ANCHOR
FLEXIBLE PIPE CONNECTION
PIPE EXPANSION JOINT
POINT OF NEW CONNECTION
AIR VENT
PLUG VALVE
CHECK VALVE
BALL VALVE
BALANCING VALVE
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
STRAINER
PRESSURE - TEMP. TAP
PRESSURE GAUGE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
SUPPLY GRILLE
RETURN GRILLE
EXHAUST AIR
SUPPLY AIR
RETURN AIR
OUTDOOR AIR
SUPPLY AIR DAMPER
RETURN AIR DAMPER
SUPPLY DIFFUSER
OA
RA
SA
EA
RAD
SAD
SG
RG
SD
RETURN DIFFUSER
RD
TRANSFER GRILLE
TG
TRANSFER DIFFUSER
TD
THERMOSTAT
FIRE/SMOKE DAMPER
FIRE DAMPER
MOTOR OPERATED DAMPER (MOD)
MANUAL BALANCING DAMPER
7851,1*9$1(6,1(/%2:
??x??
DUCT SIZES ARE NET FREE AREA
1ST NO. IS DUCT WIDTH.
2ND NO. IS DUCT DEPTH.
SECTION THRU SUPPLY AIR DUCT
SECTION THRU RETURN/EXHAUST AIR DUCT
SUPPLY DUCT TURN DOWN
RETURN/EXHAUST DUCT TURN DOWN
CHANGE OF ELEVATION
FLEXIBLE DUCT CONNECTION
R/D
(D) DROP (R) RISE
SENSOR (CALL OUT ON DRAWINGS)
SUPPLY REGISTER/DIFFUSER/LOUVER
NECK SIZE
CFM-S
RETURN REGISTER/DIFFUSER/LOUVER
NECK SIZE
CFM-R
OUTSIDE AIR REGISTER/DIFFUSER/LOUVER
NECK SIZE
CFM-O.A.
EXHAUST REGISTER/DIFFUSER/LOUVER
NECK SIZE
CFM-E
U
DOOR UNDERCUT
CFM
(A) SECTION CUT LINE
(B) SHEET SHOWN ON
S
SECTION THRU ROUND DUCT
ROUND DUCT TURN DOWN
4-WAY CONTROL VALVE
FLOW REGULATOR VALVE
DIFFERENTIAL BYPASS VALVE
NATURAL GAS PRESSURE REGULATOR
THERMOMETER
AUTHORITY HAVING JURISDICTION
ELECTRICAL CONTRACTOR
MECHANICAL CONTRACTOR
PLUMBING CONTRACTOR
P.C.
M.C.
E.C.
A.H.J.
of
Drawn By: Checked By:
DATE: ISSUE:
10-27-14 PERMIT
AEC PROJECT #: INSPIRATO
141 E MEADOW DR
SUITE 204
VAIL, COLORADO 81657
14077.00
www.aec-vail.com
CMechanical,
Electrical
& Lighting
Design Services
Architectural Engineering
Consultants
Telephone: 970-748-8520 Fax: 970-748-8521
EG$Q2IILFHZLWK/(('
$FFUHGLWHG
3URIHVVLRQDOV
11-06-14
EM LIGHT CLARIF.
1
11-12-14 BLDG DEPT COMM #2
2
11-24-14 REVISION #3
3
%92 61%
/'%*#0+%#.
52'%5
.')'0&
ߙ5%*'&7.'5
5%#.'Ä
/Ä
12/17/14