Loading...
HomeMy WebLinkAbout14077.00-Solaris Clubhouse for Inspirato_Part6.pdfGENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3. P.C. TO INSTALL ALL WASTE LINES THROUGH THE FLOOR ON THIS LEVEL TO AVOID DISRUPTION OF LOWER LEVEL TENANTS. VERIFY SUCH INSTALLATION PRIOR TO WORK. 4. IF INDIRECT WASTE IS LONGER THAN 5' TO TERMINATION POINT, PROVIDE P-TRAP. DN +44 +48 LCD LCD N.I.C. N.I.C. N.I.C. LOUNGE 3 104 BAR 103 CLOSET 101 LOUNGE 6 107 THEATRE 108 SALES 109 MEN'S W.C 111 VANITY 110 WOMEN'S W.C. 112 WORK 114 STOR. 115 EMPLOYEE BREAK 116 LOUNGE 4 105 LOUNGE 5 106 +84 +84 +84 +84 +84 +84 +48 +48 +44 +44 +60 +44 REF. +48 +84 +84 +84 +84 +48 +48 +48 EL T/E EL +48 +48 EL JAN. 117 LCD LCD +84 +44 +84 +44 D/W +44 M/W (2) ICE MAKER BOTTLE COOLER ICE WELL DRYING RACK GLASS CHILLER PREP SODA COFFEE KEG +20 +20 +20 +20 +20 +20 +20 +20 +20 +20 +20 +44 +44 +44 LV-1 1 FD-17 PS-1 6 5 8 7 9 6 DW-1 3 CONNECT 1-1/2" W & V TO LV-1. CONNECT 3" W & 2" V TO WC-2. CONNECT 1-1/2" I.W. TO HS-1 VIA AIR GAP TO FS-1b. CONNECT 2" I.W. TO KS-2 VIA AIR GAP TO FS-1b. INSTALL SP-1, FS-1a & b UNDER THE CABINET'S COUNTER TOP IN THE PROPOSED LOCATIONS. COORDINATE EXACT LOCATION IN FIELD WITH OTHER BAR EQUIPMENT AND SPACE AVAILABLE. CONNECT 2" I.W. TO PS-1 VIA AIR GAP TO FS-1a. CONNECT 2" W & 1-1/2" V TO FD-1. CONNECT TO EXISTING WASTE LINE IN THIS LOCATION. VERIFY EXISTING WASTE LOCATION IN FIELD PRIOR TO WORK. THIS FS-1a CAN BE OMITTED IF INDIRECT WASTE LINE CAN MAINTAIN CODE REQUIRED SLOPE TO SP-1. VERIFY IN FIELD PRIOR TO PURCHASING FS-1a. (E) 4" W TO ADJACENT SPACE TO REMAIN. ROUTE 1-1/2" W SP-1 DISCHARGE TO THE COLUMN FURR-OUT AND UP TO THE CEILING. COORDINATE EXACT LOCATION IN FIELD AND AVOID OTHER PLUMBING PIPING CONFLICT. CONNECT 2" W & 1-1/2" V TO MS-1. MAINTAIN 2% SLOPE OF THE 2" W LINE IN THE CEILING. COORDINATE WITH EXISTING MECHANICAL EQUIPMENT INSTALLED IN THE CEILING CAVITY. IF THE GRAVITY DRAINAGE CANNOT BE PROVIDED, CONTACT MECHANICAL ENGINEER FOR ASSISTANCE TO UPSIZE THE SP-1. CONNECT TO (E) 2" OR LARGER VENT LINE, VERIFY (E) VENT LINE SIZE AND LOCATION IN FIELD. ROUTE 2" W DOWN IN THIS LOCATION AND CONNECT TO EXISTING 4" W LINE. VERIFY IN FIELD. CONNECT DRAIN AND CONDENSATE DRAIN TO KS-1 VIA AIR GAP OR VACUUM BREAKER. SHEET DETAIL NOTES: 1 2 3 4 10 8 1-1/2" W 3" W (E) 4" W 10 11 KS-1 MS-1 12 2" W 1-1/2" V 2" V 12 13 14 14 IM-1 1-1/2" V 2" W 2" W 2" W 3" W 2" V LV-1 1 WC-1 2 WC-1 2 3" W 2" V 3" W 2" V 1-1/2" W 3" W 2" V 1-1/2" V 2" V 2" V SP 1 HS-1 3 KS-2 4 2" W 2" W 2" W 2" W 2" W 2" W 1-1/2" W 1-1/2" W 2" W ACCESS TO SP-1 5 5 5 9 11 POINT OF GRAVITY DRAIN 13 13 13 15 15 2" V 2" V 2" V 2" V 16 16 2 2 2 2 2 2 2 2 2 2 FS-1a FS-1b of Drawn By: Checked By: DATE: ISSUE: 10-27-14 PERMIT AEC PROJECT #: INSPIRATO 141 E MEADOW DR SUITE 204 VAIL, COLORADO 81657 14077.00 www.aec-vail.com CMechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 Fax: 970-748-8521 EG$Q2IILFHZLWK/(('Œ $FFUHGLWHG 3URIHVVLRQDOV 11-06-14 EM LIGHT CLARIF. 1 11-12-14 BLDG DEPT COMM #2 2 %92 61% 0&.'8'. 2.7/$+0) ߙ9#56' 2.#0 5%#.'žÄ 2Ä   NORTH 2ND LEVEL PLUMBING PLAN SCALE: 1/4" = 1'0" 12/17/14