DEMOLITION PLAN GENERAL NOTES
All accessible abandoned conduit and cable
shall be removed from the project area.
Contractor to remove existing carpet and 4" base
and patch floor as required to install new flooring
in areas of new construction. Contractor is to
salvage all demolished doors, frames, hardware,
glazing, lights, etc. as required by Building Owner.
Contractor is responsible for protecting all finishes
to remain from damage due to construction and
improvements.
PARTITION SCHEDULE
Existing walls to be removed.
Base building shell and core
construction / existing partition
to remain.
DEMOLITION PLAN KEYNOTES
D1
Remove all existing interior walls, doors and
frames.
D2
Remove all power/data outlets. Patch wall to
remain (no blank plates).
D3
Remove existing framed platforms at entry.
D4
Remove existing electrical panel and cable TV.
Relocate panels as indicated on construction
documents.
D5
Remove existing tile floor and 4" base
throughout. Prepare for new wood flooring, RE:
construction documents.
Elsy Studios
1745 Wazee Street, Suite 2D
Denver, Colorado 80202
303.479.4952
ISSUE DATE ISSUE
SHEET NUMBER
DESCRIPTION
PROJECT
BUILDING
PROJECT MANAGER
GENERAL INFORMATION
ARCHITECT
ENGINEER
FILE NAME:
TOWN APPROVAL
C:\Users\nathan.ELSYSTUDIOS\Documents\Inspirato_nathan.rvt
INSPIRATO - MEMBER LOUNGE
141 EAST MEADOW DRIVE,
STE 204
VAIL, CO 81657
SARAH ZALES
OCTOBER 27, 2014 PERMIT DRAWINGS
141 EAST MEADOW DRIVE,
STE 204
VAIL, CO 81657
ID-100
DEMOLITION PLAN
1410.01
INSPIRATO - MEMBER LOUNGE
NOVEMBER 12, 2014 BAR EQUIPMENT AND GENERAL
DESIGN UPDATES
NOVEMBER 12, 2014 BUILDING DEPARTMENT
RESPONSE
NORTH
DEMOLITION PLAN
1/4" = 1'-0"
11.12.2014
12/17/14