Loading...
HomeMy WebLinkAboutInspirato_ID-101_CEILING DEMOLITION PLAN.pdfD2 D1 D1 D4 D5 D1 D4 D2 N.I.C. N.I.C. N.I.C. TYP. D2 TYP. TYP. CEILING DEMOLITION PLAN KEYNOTES D1 Existing gypsum board ceiling, lights and HVAC diffusers throughout to be removed. Salvage diffusers and wall-washer light fixtures for possible re-use. D2 Existing access panel covers. Reuse existing in new gypsum board ceiling, repair or replace as required for like-new appearance. D3 (UNASSIGNED) D4 Remove existing exit signs and salvage for reuse. D5 Existing ceiling grid and acoustical tile to be removed. DEMOLITION PLAN GENERAL NOTES All accessible abandoned conduit and cable shall be removed from the project area. Contractor to remove existing carpet and 4" base and patch floor as required to install new flooring in areas of new construction. Contractor is to salvage all demolished doors, frames, hardware, glazing, lights, etc. as required by Building Owner. Contractor is responsible for protecting all finishes to remain from damage due to construction and improvements. DEMOLITION CEILING SCHEDULE Existing walls to be removed. Base building shell and core construction / existing partition to remain. Access panels to be removed, salvaged for reuse. Gallery lights to be removed. Linear lights to be removed. Wall washers to be removed. 6 lens direction spotlights to be removed. Chadelier to be removed. Existing sprinkler head to remain (re-work per sprinkler drawing by subcontractor). 3 lens direction spotlights to be removed. Elsy Studios 1745 Wazee Street, Suite 2D Denver, Colorado 80202 303.479.4952 ISSUE DATE ISSUE SHEET NUMBER DESCRIPTION PROJECT BUILDING PROJECT MANAGER GENERAL INFORMATION ARCHITECT ENGINEER FILE NAME: TOWN APPROVAL C:\Users\nathan.ELSYSTUDIOS\Documents\Inspirato_nathan.rvt INSPIRATO - MEMBER LOUNGE 141 EAST MEADOW DRIVE, STE 204 VAIL, CO 81657 SARAH ZALES OCTOBER 27, 2014 PERMIT DRAWINGS 141 EAST MEADOW DRIVE, STE 204 VAIL, CO 81657 ID-101 CEILING DEMOLITION PLAN 1410.01 INSPIRATO - MEMBER LOUNGE NOVEMBER 12, 2014 BAR EQUIPMENT AND GENERAL DESIGN UPDATES NOVEMBER 12, 2014 BUILDING DEPARTMENT RESPONSE NORTH CEILING DEMOLITION PLAN 1/4" = 1'-0" 11.12.2014 12/17/14