HomeMy WebLinkAboutInspirato_ID-101_CEILING DEMOLITION PLAN.pdfD2
D1
D1
D4
D5
D1
D4
D2
N.I.C.
N.I.C.
N.I.C.
TYP.
D2
TYP.
TYP.
CEILING DEMOLITION PLAN KEYNOTES
D1
Existing gypsum board ceiling, lights and HVAC
diffusers throughout to be removed. Salvage
diffusers and wall-washer light fixtures for
possible re-use.
D2
Existing access panel covers. Reuse existing in
new gypsum board ceiling, repair or replace as
required for like-new appearance.
D3 (UNASSIGNED)
D4
Remove existing exit signs and salvage for reuse.
D5
Existing ceiling grid and acoustical tile to be
removed.
DEMOLITION PLAN GENERAL NOTES
All accessible abandoned conduit and cable
shall be removed from the project area.
Contractor to remove existing carpet and 4" base
and patch floor as required to install new flooring
in areas of new construction. Contractor is to
salvage all demolished doors, frames, hardware,
glazing, lights, etc. as required by Building Owner.
Contractor is responsible for protecting all finishes
to remain from damage due to construction and
improvements.
DEMOLITION CEILING SCHEDULE
Existing walls to be removed.
Base building shell and core
construction / existing partition
to remain.
Access panels to be removed,
salvaged for reuse.
Gallery lights to be removed.
Linear lights to be removed.
Wall washers to be removed.
6 lens direction spotlights to be
removed.
Chadelier to be removed.
Existing sprinkler head to remain
(re-work per sprinkler drawing by
subcontractor).
3 lens direction spotlights to be
removed.
Elsy Studios
1745 Wazee Street, Suite 2D
Denver, Colorado 80202
303.479.4952
ISSUE DATE ISSUE
SHEET NUMBER
DESCRIPTION
PROJECT
BUILDING
PROJECT MANAGER
GENERAL INFORMATION
ARCHITECT
ENGINEER
FILE NAME:
TOWN APPROVAL
C:\Users\nathan.ELSYSTUDIOS\Documents\Inspirato_nathan.rvt
INSPIRATO - MEMBER LOUNGE
141 EAST MEADOW DRIVE,
STE 204
VAIL, CO 81657
SARAH ZALES
OCTOBER 27, 2014 PERMIT DRAWINGS
141 EAST MEADOW DRIVE,
STE 204
VAIL, CO 81657
ID-101
CEILING DEMOLITION PLAN
1410.01
INSPIRATO - MEMBER LOUNGE
NOVEMBER 12, 2014 BAR EQUIPMENT AND GENERAL
DESIGN UPDATES
NOVEMBER 12, 2014 BUILDING DEPARTMENT
RESPONSE
NORTH
CEILING DEMOLITION PLAN
1/4" = 1'-0"
11.12.2014
12/17/14