Loading...
HomeMy WebLinkAboutInspirato_ID-103_PARTITION PLAN.pdfDN B 2 B 2 C 4 D 5 A 6 15 36 32 39 37 14 16 30 38 10 9 13 9 20 21 21 19 24 25 26 29 28 33 1 22 35 35 31 36 39 22 12 18 27 30 36 37 6 N.I.C. N.I.C. N.I.C. 39 39 LOUNGE 3 104 BAR 103 CLOSET 101 LOUNGE 6 107 THEATRE 108 SALES 109 MEN'S W.C 111 VANITY 110 WOMEN'S W.C. 112 WORK 114 EMPLOYEE BREAK 116 LOUNGE 4 105 LOUNGE 5 106 2 1 3 27 LOUNGE 100 LOUNGE 2 102 HALL 113 24 B 7 5 30 5 5 5 23 5 5 5 5 5 5 41 41 41 41 41 41 41 42 42 42 42 42 40 40 25 EGRESS FIXED 34 20 35 35 B 1 43 6 4 11 7 7 8 3 17 3 PARTITION PLAN GENERAL NOTES Purpose: The purpose of this plan is to generally describe the proposed use, layout and tenant improvements required for tenant occupancy. Unless noted otherwise, all new work identified in this plan shall be tenant / building standard materials and methods of construction. The Contractor shall be responsible for coordinating with the Building Owner to familiarize himself with the approved tenant/building/suite standards and the limits of base building improvements and the scope of work required for tenant improvements, if any, beyond those provided for by this Partition Plan. Provide and install Building Standard fire extinguishers, emergency lights, and exit signage. Assure all compliance pertaining to fire suppression system, electrical and mechanical systems as required by the Building Department. All materials are assumed to be new unless otherwise noted. Contractor is to inspect and correct all areas where floor is in more than 1/4" variance of level or as approved by Tenant and Landlord. Qualified contractors shall possess the means to order specified products in time to meet the schedule. Architect will not accept substitutes for products not ordered in a timely manner. Contractor to confirm lead times at time of bid. Tenant Improvement Exclusions: Except as otherwise noted or specifically approved by the Building Owner, the following work is to be provided separately by the Tenant and is NOT included in this Partition Plan or to be included in the Contractor's tenant improvement construction budget: Telephone equipment, installation and cabling. Computer equipment, installation and cabling. Moveable furniture, fixtures, accessories and equipment. Architectural and engineering consulting fees and expenses. PARTITION PLAN KEYNOTES The following Keynotes are intended to generally describe special conditions, improvements as a supplement to the plan drawing, legends, schedules and Space Plan General Notes, only. The Contractor shall be responsible for pricing any materials and work required and related to the various Keynotes. Architectural Keynotes: 1 New commercial grade bar equipment. RE: Sheet ID-108 and Plumbing Drawings. 2 New bar die wall: 40" +/- high with concealed steel tube for lateral support. Front façade to be paint-grade wood with 2" paint-grade molding around wood veneer panels. New 6” recessed wood toe kick with recess to conceal LED strip light at toe kick. Install free standing powder coated foot bar (finish TBD) attached to floor. RE: Elevations & Finish Notes. 3 New bar top: 30” wide solid wood bar top with 3/4" deep by 4" wide drink rail on server side of bar. Bar top to be 42" AFF. Provide lowered portions at 34" AFF where indicated on plan. Waterproof and chemical resistant top coat finish. Wood species and edge profile TBD. 4 New bottle display: (1) 7" high raised shelf with cobalt mirror finish and concealed LED lighting. 5 Skim coat existing wall to provide level 5 finish for wallcovering 6 New continuous quartz countertop at 36" AFF over bar equipment (below). Provide 12" high quartz backsplash between prep sink and bottle display. Provide finished removable painted wood veneer end panel below (from floor to underside of countertop) with coved base. 7 50” – 55” flat panel TV recessed in niche (above), on tilt-mount. Mirrored surround with polished chrome metal corner bead. Mirror to be flush with face of TV, with mirrored glass extending inside niche. 8 New stainless steel base cabinet with interior adjustable shelf on locking casters for Tenant's soda fountain equipment, RE: Sheet ID-108. 9 New Break Room appliances, RE: Sheet ID-108 and Plumbing Drawings. 10 New kitchen island: 30" W x 60" L quartz countertop on mobile stainless steel cart with open adjustable shelving on locking casters. PARTITION PLAN KEYNOTES (CONTINUED) 11 New countertop and base cabinets: plastic laminate countertop with 4” backsplash over 34” H x 24” D plastic laminate cabinets. Cabinets to have full overlay flush doors, concealed hinges and Mockett DP3C-26 polished chrome tab pulls. Cabinet interior to be melamine with (2) adjustable shelves. 12 New trash/recycling cabinet: Full overlay doors with attached plastic laminate toe kick and flooring to extend inside cabinet base. 4”deep x 8” diameter polished chrome Mockett trash grommet in countertop. Trash bins provided by contractor. 13 New open cabinet: 12” W x 30” D x full height pull out shelving system with plastic laminate surround. Align top of cabinet with top of adjacent refrigerator. 14 New upper cabinets: 15” D x 48” H (to ceiling) plastic laminate with full overlay flush doors, concealed hinges and Mockett DP3C-26 polsihed chrome tab pulls. Cabinet front to have 2” front apron to conceal LED strip lighting. Cabinet interior to be melamine with (4) adjustable shelves. 15 New plastic laminate work surface: 24” D x 30” H with pencil drawer below, scribed to wall, supported by tube steel supports concealed in wall. 16 New upper cabinets: 12” D x 30” H x full length plastic laminate with full overlay flush doors, concealed hinges and Mockett DP3C-26 polsihed chrome tab pulls. Cabinet front to have 2” front apron to conceal LED strip lighting. Cabinet interior to be melamine with (2) adjustable shelves. 17 New wall-mounted mop rack. 18 New 12” deep adjustable melamine shelving on heavy duty wall standards and brackets (Qty. 7). 19 New vanity countertop: 24” D x 34” H quartz countertop scribed to end walls (no backsplash). Provide 2” gap between wall and back-side of countertop for continuation of wall finish and mirrors to floor . Provide 6” deep x 6” diameter polished chrome Mockett trash grommet in countertop. Provide quartz 5" thick front apron and angled bottom apron to conceal plumbing and trash receptacle below. Provide concealed metal supports as required to achieve "floating" look. RE: Elevations 20 New mirror: 24”W x 90”H (Qty 2) frameless mirror with polished edges. Provide concealed furring/mounting to conceal LED lighting behind all edges of mirror. 21 New full-length mirror with painted wood trim and (1) polished chrome door hook adhered to back side of door. 22 New water closet accessories to include the following: •Surface-mount toilet tissue dispenser: TOTO ‘Soiree’ paper holder •Surface-mount robe hook: TOTO ‘Soiree’ robe hook •ADA-compliant grab bars: TOTO ‘Soiree’ straight grab bar. •RE: Elevations for ADA compliance 23 New occupant load sign, 1/4" thick glass with polished edges on bronze metal stand-offs. Lettering to be cut-out vinyl film applied to backside of glass. "Occupant Load = 142" 24 LINE ITEM OPTION New (Qty 5) decorative sliding screens: 30” W x full height with required clips and hardware. Divider System “Alveare” by Soelberg Industries with thermofoil finish by manufacturer. New (Qty 2) fixed screens where indicated. Alternate option for pricing to be provided by millworker. 25 LINE ITEM OPTION: New raised floor platform: 6-3/4” high step-up platform, Fire-retardant treated wood stud construction with fire-retardant treated 1/4" thick plywood decking. Provide firestopping in concealed floor space to comply with IBC. 26 New projection screen surround: ¼” thick back- painted glass (full height) adhered to furred wall construction, with aluminum Schluter trim. Coordinate dimensions and mounting with Tenant's AV vendor. RE: Finish Plan 27 New countertop: 30” D x 38” AFF wood veneer countertop with 2” thick matching front apron, scribed to wall. End condition to have continuous wood veneer solid leg support. 28 New base cabinet and built-in shelving: 34" H x 24” D paint grade wood base cabinet with quartz countertop and open shelving above (Qty. 5) and decorative molding trim. RE: Elevations 29 New printer cabinet: 34" H x 15” D paint grade wood base cabinet with quartz countertop. Provide power/data in base cabinet with pull-out drawer for printer and polished chrome gromment by Mockett in countertop for Tenant provided charging station. 30 New TV surround: ¼” thick back-painted glass (full height) adhered to furred wall construction, with polished chrome Schluter trim. RE: Finish Plan 31 New millwork wood veneer and decorative tile clad unit. Provide 20" high polished chrome metal niche with 1/2" tempered back-painted glass in standard U-channels. Provide bottom panel of metal niche to be removable to access gas line and venting for future fireplace (submitted under separate permit). RE: Elevations PARTITION PLAN KEYNOTES (CONTINUED) 32 New closet: heavy-duty metal coat rod with solid stained wood hat shelf above and solid stained wood boot shelving below. Provide 24" wide section of coat rod at A.D.A accessible height. 33 New boot shelving: 48” W x 14”D x full height solid stained wood open face cabinet with (2) sets of adjustable shelves. 34 New millwork unit: Provide 24" high dark bronze metal cladded casing with 1/2" tempered glass in standard U-channels. Provide bottom panel of metal niche to be removable to access gas line and venting for future fireplace (submitted under separate permit). RE: Elevations 35 New 5/8” thick gypsum board over metal stud column furring. Provide furring tight to column for minimal overall dimension. 36 New fire-retardant treated wood blocking concealed in wall and ceiling for support of Tenant’s A/V equipment. Coordinate final size and location with A/V vendor. 37 New custom banquette: tufted back cushion and upholstery to extend to ceiling, with stained wood trim. Provide $33/YD. fabric allowance. RE: Elevations and Sections 38 LINE ITEM OPTION Provide new recessed aluminum top and bottom track for sliding screens. Dorma Systems or equal. 39 New custom banquette: cushions and upholstery to 44” AFF, with stained wood trim. Provide $33/YD. fabric allowance. RE: Elevations and Sections 40 New paint-grade wood wainscoting to 44" AFF with 6" base, 2" decorative molding framing wood veneer panels, and 4" top chair rail. RE: Elevations PARTITION PLAN KEYNOTES (CONTINUED) 41 New wood veneer pilasters: Width to align with ceiling above, thickness to be determined by profile of crown molding above. Mount on 2" painted black fire-retardant treated blocking. Concealed LED light strip to illuminate sides of pilaster above wainscotting. RE: Elevations 42 New wood veneer pilasters/table unit: 28" wide table with quartz top, align wood veneer pilaster up wall, onto ceiling soffit above and additional front panel to floor for continuos look. RE: Elevations 43 New cased opening with paint-grade 4" crown molding on sides and 6" crown molding on top. 3 PARTITION SCHEDULE Base building shell and core construction / existing partition to remain. Building standard interior tenant partition. •3-5/8" metal stud framing at 24" O.C. with 5/8" gyp. bd. both sides. •Re: Detail 1/ID-100 Building standard tenant partition. •3-5/8" metal stud framing at 24" O.C. with 5/8" gyp. bd. both sides. •Partial height •Re: Detail 2/ID-100 OR DOOR AND FRAMING SCHEDULE X A New 30”w x 8’-0”h raised panel wood door with new wood door frame with 4” trim molding. Paint door and frame with Sherwin Williams Pro Industrial Zero VOC Gloss coating. B New 36”w x 8’-0”h raised panel wood door with new wood door frame with 4” trim molding. Paint door and frame with Sherwin Williams Pro Industrial Zero VOC Gloss coating. C (2) Existing 36"w x 9'-2"h automatic tempered glass doors. Service and confirm function. D Existing 36"w x 6'-8" h exit door to remain. Paint for like-new appearance. 3 HARDWARE SCHEDULE All hardware is to be A.D.A. compliant. 1 Forms + Surfaces # HDREC1021 24” long, satin brass. Passage function. Concealed overhead closer. 2 Forms + Surfaces # HDREC1021 24” long, satin brass. Privacy function deadbolt lockset. 3 UNASSIGNED 4 Existing break-away emergency exit hardware to remain. Service as required. 5 Remove existing leverset, replace with new panic hardware. 6 Utility/Storage: New satin brass leverset with passage set. 7 Forms + Surfaces # HDREC1021 24” long, satin brass. Storeroom function lockset X 3 NORTH PARTITION PLAN 1/4" = 1'-0" Elsy Studios 1745 Wazee Street, Suite 2D Denver, Colorado 80202 303.479.4952 ISSUE DATE ISSUE SHEET NUMBER DESCRIPTION PROJECT BUILDING PROJECT MANAGER GENERAL INFORMATION ARCHITECT ENGINEER FILE NAME: TOWN APPROVAL C:\Users\nathan.ELSYSTUDIOS\Documents\Inspirato_nathan.rvt INSPIRATO - MEMBER LOUNGE 141 EAST MEADOW DRIVE, STE 204 VAIL, CO 81657 SARAH ZALES OCTOBER 27, 2014 PERMIT DRAWINGS 141 EAST MEADOW DRIVE, STE 204 VAIL, CO 81657 ID-103 PARTITION PLAN 1410.01 INSPIRATO - MEMBER LOUNGE NOVEMBER 12, 2014 BAR EQUIPMENT AND GENERAL DESIGN UPDATES NOVEMBER 12, 2014 BUILDING DEPARTMENT RESPONSE NOVEMBER 20, 2014 CONSTRUCTABILITY COORDINATION 1 2 3 12.1.2014 12/17/14