Loading...
HomeMy WebLinkAboutBegin_Workflow-12-23-2014_12-39-02.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Rich Shaw ( shawcontracting@gmail.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No Yes 1 Building (10)M­ 1.pdf jmondragon building 001 fireplace must be EPA phase II . no other wood burning fireplace allowed Yes | No No 1 Building (12)E­ 1.pdf jmondragon building 002 a minimum of 75 % of new lighting shall be high efficacy type Yes | No No 1 Building (4)A­4­ 5.pdf jmondragon building 003 snow retentation required in areas where snow sheds onto patio,decks,driveways, sidewalks etc Yes | No No 1 Building (2)A­ 2.pdf jmondragon building 004 new windows shall have a U value of .32 or better 2012 IECC (local) Yes | No No 1 Building (10)M­ 1.pdf jmondr building 005 show smoke and carbon monoxide detector locations on plans Complies with DRB approval. DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Complete  Save And Close   Building Process V1 1 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM APPROVED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions