Loading...
HomeMy WebLinkAboutSOILS REPORT.pdf North Office South Office 9197 W.6th Ave, Suite 1100 210 5th St.Suite 200 *Na Design6tr ) J Lakewood, CO 80215 Castle Rock,CO 80104 z �j E Engineering 2 Phone: 303-688-5151 o1, Inc. www.credesigneng.com April 2, 2015 Jon Gunson Custom Mountain Architects 111 Lincoln Avenue, Suite B Breckenridge, CO 80424 Open Hole Observation Job Address: 4394 Streamside Circle Vail, Colorado Job Number: 14-6165 We understand a soils evaluation was not performed prior to construction of the footings for the referenced project. Based on our background review the site is mapped by Kellog' and others as Pinedale Till. Pinedale Till is of late Pleistocene age and consists primarily of cobbles and boulders with a matrix of poorly sorted sand containing minor amounts of clay and silt. CRE Design Engineering visited the subject site on April 1, 2015 in order to perform the following observation. Open Excavation: The purpose of the open excavation observation was to verify that the exposed soils in the excavation were suitable for the foundation type constructed. During my site visit I observed the "Bigfoot"footings that were constructed for the addition to the existing residence. The footings are constructed approximately 4 feet below grade and are bearing on the Pinedale Till consisting of brown, moist, medium dense, sand with gravel and cobbles. Based on our observations and our experience with similar materials, the bearing soils are adequate for an allowable bearing capacity of 2,500 pound per square foot. If you have any questions regarding this letter please feel free to call. CRE Design Engineering Inc. Observation by: �-�����;•��� % MARS ,4 +i• l )1'04(.1"'(�•� o:o ►► r ./:j 47538 mi pi co: af 4.1 +t! •46) = Shu/ANAL \..vt�, Jeffrey M. Jones, P.E. Chief Geotechnical Engineer 'Kellog,Karl S.,Bryant,Bruce,Redsteer,Margaret H.,2003,Geologic Map of the Vail East Quadrangle