Loading...
HomeMy WebLinkAboutB14-0477 REV1 Project Summary.pdf Pres : VVMVMC- us Bank—Water Heater Upgrade y ' Date; 2/2/203.5 ,t ��ts4 erect,rr CP a i_yie Project Solutions 7..11 e. [[D��avidLyle {y:''. 770,3/T .535() {,4IY0 #9a}Jf; david.;yle r lvfeos.co €t tri ri Piet trrtma {_ The existing US Bank building has an existing,gas fired water heater installed in the 1'080's that provided domestic hot water to the core bathroom groups and miscellaneous plumbing fixtures throughout the facility. Additional, electric, water heaters in the building provide domestic hot water to various other locations. VV_MC is in progress of remodeling several tenant spaces in the building and would like to take the .opportunity to consolidate domestic hot water generation back to the buildings main mechanical room, and upgrade the existing gas fired water heater to indirect water heaters served by the building heating water system. Schedulet Project to be Complete as soon as possible to support tenant remodels in progress that will be completed err phases over the next 5 months. Tentative completion target 2/27/2015 5coPe Summary Remove the existing gas fire water heater in the buildings main mechanical room. Cut and cap the existing domestic water end gas connections to the water heater. Remove the water heater floe, controls, and other appurtenances. Provide and install two (2) new indirect water heaters in the mechanical room utilizing the exsting heating water system. Connect new domestic hot water line to existing main. Provide new domestic hot water recirculation line from the new water heaters up through the building and connect to existing tenant recirculation line in the ceiling of the second Floor. insulate all new domestic water piping, existing piping where readilyaccessfhle, Provide new floor drain in mechanical room for boiler condensate, pressure relief, and domestic drain dc�v�rt. Remove power to existing water heater system. Provide Dower to new water heaters and building recirculation pump" Provide service outlet near equipmerir as required. Provide control power where needed. See attached drawings, diagrams, and cut sheets for more information.