HomeMy WebLinkAboutBegin_Workflow-01-08-2015_10-45-24.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Shelley Bellm ( sbellm@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Shelley Bellm ( sbellm@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A601.2.pdf mhaeberle B001 Show compliance for accessible parking per section
1106.4 IBC 2012 edition
Yes | No No 1 Building A602.2.pdf mhaeberle B001 Safety Glass??
Yes | No No 1 Building A101.2.pdf mhaeberle B001 Show compliance with section 603 and section 803
of A117.1 ANSI 2009
Yes | No No 1 Building A101.2.pdf mhaeberle B002 Clarify direction of travel and occupant load
Yes | No No 1 Building G002.pdf mhaeberle B001 Proivde accessible parking clalacvuation for the new
use Rehab area. Reflect on plans
Yes | No No 1 Building E203.pdf mhaeberle B001 Clarify location in relation to egress
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Complete Save And Close
Building Process V1
1 FIRE
MIKE VAUGHAN
MVAUGHAN@VAILGOV.COM
APPROVED
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.
Task Instructions