Loading...
HomeMy WebLinkAboutBegin_Workflow-01-08-2015_10-45-24.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Shelley Bellm ( sbellm@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A601.2.pdf mhaeberle B001 Show compliance for accessible parking per section 1106.4 IBC 2012 edition Yes | No No 1 Building A602.2.pdf mhaeberle B001 Safety Glass?? Yes | No No 1 Building A101.2.pdf mhaeberle B001 Show compliance with section 603 and section 803 of A117.1 ANSI 2009 Yes | No No 1 Building A101.2.pdf mhaeberle B002 Clarify direction of travel and occupant load Yes | No No 1 Building G002.pdf mhaeberle B001 Proivde accessible parking clalacvuation for the new use Rehab area. Reflect on plans Yes | No No 1 Building E203.pdf mhaeberle B001 Clarify location in relation to egress DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Complete  Save And Close   Building Process V1 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM APPROVED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions