Loading...
HomeMy WebLinkAboutG000.pdfdesign DRAWING INDEX Heery International Inc. 555 17TH STREET Suite 500, Denver, CO 80202-3219 720.946.0276 DECEMBER 15, 2014 CONSTRUCTION DOCUMENTS VVMC MEDICAL PROFESSIONAL BUILDING COMMERCIAL TENANT IMPROVEMENT, INTERIOR REMODEL 13026.07 CATOR RUMA & ASSOCIATES, CO 896 TABOR STREET LAKEWOOD, CO 80401-4700 303.232.6200 MARTIN/MARTIN, INC. 225 MAIN ST., SUITE C 101, EDWARDS, COLORADO 81632 970.926.6007 VICINITY MAP PROJECT LOCATION DIVISION G - GENERAL Sheet Number Sheet Name G000 COVER SHEET G001 LIFE SAFTEY PLANS G002 LIFE SAFETY CODE REPORT AND GENERAL ABBREVIATIONS G003 CONSTRUCTION SEQUENCE PLANS DIVISION A - ARCHITECTURE Sheet Number Sheet Name A100.1 ARCHITECTURAL DEMOLITION PLAN- LEVEL 1 A100.2 ARCHITECTURAL DEMOLITION PLAN - LEVEL 2 A100.3 ARCHITECTURAL DEMOLITION PLAN - LEVEL 3 A101.1 ARCHITECTURAL FLOOR PLAN - LEVEL 1 A101.2 ARCHITECTURAL FLOOR PLAN -LEVEL 2 A101.3 ARCHITECTURAL FLOOR PLAN - LEVEL 3 A400.1 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL 1 A400.2 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL 2 A400.3 ARCHITECTURAL REFLECTED CEILNG PLAN - LEVEL 3 A401 DETAILS A402 CASEWORK DETAILS A403.3 ENLARGED DETAILS - LEVEL 3 A600 SPECIFICATIONS A600.1 FINISH LEGEND A600.2 FINISH SCHEDULE A601.1 FLOOR FINISH PLAN - LEVEL 1 A601.2 FLOOR FINISH PLAN - LEVEL 2 A601.3 FLOOR FINISH PLAN - LEVEL 3 A602.1 INTERIOR ELEVATIONS - LEVEL 1 A602.2 INTERIOR ELEVATIONS - LEVEL 2 A602.3 INTERIOR ELEVATIONS - LEVEL 3 A603 STANDARD PARTITION TYPES A604 DOOR / FRAME SCHEDULE AND HARDWARE A605 DOOR / WINDOW FRAME ELEVATIONS & DETAILS A606 TYPICAL MOUNTING HEIGHTS DIVISION M - MECHANCIAL Sheet Number Sheet Name M001 MECHANICAL LEGENDS AND GENERAL NOTES M002 MECHANICAL LEGENDS AND GENERAL NOTES M003 MECHANICAL SCHEDULES M004 MECHANICAL DETAILS M005 MECHANICAL DETAILS M101 FIRST FLOOR HVAC DEMO PLAN M102 SECOND FLOOR HVAC DEMO PLAN M103 THIRD FLOOR HVAC DEMO PLAN M201 FIRST FLOOR HVAC PIPING DEMO PLAN M202 SECOND FLOOR HVAC PIPING DEMO PLAN M301 FIRST FLOOR HVAC PLAN M302 SECOND FLOOR HVAC PLAN M303 THIRD FLOOR HVAC PLAN M401 THIRD FLOOR HVAC PIPING PLAN M402 SECOND FLOOR HVAC PIPING PLAN M403 THIRD FLOOR HVAC PIPING PLAN P101 FIRST FLOOR PLUMBING DEMO PLAN P102 SECOND FLOOR PLUMBING DEMO PLAN P103 THIRD FLOOR PLUMBING DEMO PLAN P201 SECOND FLOOR PLUMBING PLAN P202 SECOND FLOOR PLUMBING PLAN P203 THIRD FLOOR PLUMBING PLAN DIVISION E - ELECTRICAL Sheet Number Sheet Name E001 ELECTRICAL LEGENDS, NOTES, AND DETAILS E002 ELECTRICAL ONE-LINE DIAGRAM E003 ELECTRICAL SPECIFICATION E004 ELECTRICAL SCHEDULES E101 FIRST FLOOR ELECTRICAL DEMOLOITION PLAN E102 SECOND FLOOR ELECTRICAL DEMOLITION PLAN E103 THIRD FLOOR ELECTRICAL DEMOLITION PLAN E201 FIRST FLOOR LIGHTING PLAN E202 SECOND FLOOR LIGHTING PLAN E203 THIRD FLOOR LIGHTING PLAN E301 FIRST FLOOR POWER AND SYSTEMS PLAN E302 SECOND FLOOR POWER AND SYSTEMS PLAN E303 THIRD FLOOR POWER AND SYSTEMS PLAN DIVISION T - TECHNOLOGY Sheet Number Sheet Name T001 TECHNOLOGY LEGENDS AND GENERAL NOTES T101 FIRST FLOOR TECHNOLOGY PLAN T102 SECOND FLOOR TECHNOLOGY PLAN T103 THIRD FLOOR TECHNOLOGY PLAN TD101 FIRST FLOOR TECHNOLOGY DEMOLITION PLAN TD102 SECOND FLOOR TECHNOLOGY DEMOLITION PLAN TD103 THIRD FLOOR TECHNOLOGY DEMOLITION PLAN 108 SOUTH FRONTAGE ROAD VAIL, CO 81657 DIVISION FF - FURNITURE/FURNISHINGS Sheet Number Sheet Name FFE00 FURNITURE, FURNISHINGS, & EQUIPMENT DIVISION S- STRUCTURAL Sheet Number Sheet Name S-1 STRUCTURAL NOTES, PLANS AND DETAILS 01/16/15