Loading...
HomeMy WebLinkAboutG003.pdfUP DN UP UP DN UP DN DN UP DN 1 2 3 4 A B C D E F G H EXAM 1 102 EXAM 2 103 EXAM 3 104 EXAM 4 105 EXAM 5 107 EXAM 6 108 EXAM 7 109 EXAM 8 110 EXAM 9 - ULTRASOUND 120 EXAM 10 121 PROCEDURE 106 LCKRS. 123 REC. 126 CLIN. MGR. 131 ADA TLT. 129 ADA TLT. 128 LAB 130 FLOW STN. 101 WEIGH STATION 127 CORRIDOR 119 CORRIDOR 119 STRG. CAB. 124 FLOW STN. 111 BACK STAGE WRK. 112 WAITING 122 FLOAT 132 ALCOVE 125 ALCOVE 113 SOILED HOLDING 115 HSKP. 118 ELECTRICAL 114 SUPPLY CLOSET 116 CMM IT 117 CONFERENCE 100 EXISTING U.S. BANK NOT IN PROJECT EXISTING LOBBY EXISTING ELEVATOR EXISTING TOILET EXISTING TOILET 3 1 2 3 4 A B C D E F G H SERVER ROOM 212 IT DIRECTOR'S OFFICE 208 IT OFFICE 209 HR OFFICE 210 IT STAFF WORK AREA 207 RECEPTION 217 WAITING 218 PT TLT / LOCKERS 200 STAFF WORK ROOM 215 EXERCISE AREA 201 PRIVATE TREATMENT 206 ORTH. FAB. & SUPPLIES STORAGE 205 STAFF LOUNGE 216 TREATMENT AREA 204 STAFF WORK 203 PERFORMANCE AREA 202 WAITING 213 HR OFFICE 211 PRINTER / COPIER 214 EXISTING LOBBY EXISTING ELEVATOR EXISTING VAIL SUMMIT ORTHOPEDICS NOT IN PROJECT EXISTING TOILET EXISTING TOILET 2 1A 1A 1 2 3 4 A B C D E F G H OFFICE 315 OFFICE 312 STAFF LOUNGE 310 EXAM 1 306 DR.'S OFFICE 309 EXAM 2 308 EXAM 3 307 WAITING 300 CLOSET 314 RECEPTION 301 HALLWAY 302 CLOSET 303 CLOSET 311 IT CLOSET 305 PRP 304 X-RAY 316 CONTROL 317 CHANGING 318 HALL 313 EXISTING LOBBY EXISTING ELEVATOR EXISTING TOILET EXISTING TOILET EXISTING OFFICES 1C 1B EXISTING OFFICES 1 2 3 A. COMPLETE LEVEL TWO IT AND HR OFFICES, VACATE LEVEL TWO EAST SIDE FOR REMODELING. COMPLETE LEVEL 2 HHSMC REMODEL. RELOCATE EQUIPMENT FROM LEVEL 1 EXISTING SPACE COMPLETE LEVEL ONE CMM CLINIC REMODEL. RELOCATE EQUIPMENT FROM HOSPITAL. B. COMPLETE LEVEL THREE DR. EVANS' SPACE. RELOCATE EQUIPMENT FROM LEVEL 1 EXISTING. SPACE C. REMODEL LEVEL 3 BIRCH ROOM FOR NEW X-RAY. 000 4' 8' 16' SCALE: 000 4' 8' 16' SCALE: N This document is the property of Heery International, Inc. and Heery International Inc. retains all rights therein, including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International, Inc. is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, Heery International Inc. Copyright © 2013 by Heery International, Inc. all rights reserved. WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" drawn by checked by sheet number sheet title item date date issued for seal/signature consultants/construction managers owner's project number project number 1/8" = 1'-0" 1/8" = 1'-0" 12/15/2014 3:21:09 PM G003 Checker Author CONSTRUCTION SEQUENCE PLANS DECEMBER 15, 2014 CONSTRUCTION DOCUMENTS VVMC MEDICAL PROFESSIONAL BUILDING COMMERCIAL TENANT IMPROVEMENT, INTERIOR REMODEL 108 SOUTH FRONTAGE ROAD VAIL, CO 81657 13026.07 CATOR RUMA & ASSOCIATES, CO 896 TABOR STREET LAKEWOOD, CO 80401-4700 303.232.6200 MARTIN/MARTIN, INC. 225 MAIN ST., SUITE C 101, EDWARDS, COLORADO 81632 970.926.6007 1/8" = 1'-0" 1 CONSTRUCTION SEQUENCE PLAN -L1 1/8" = 1'-0" 2 CONSTRUCTION SEQUENCE PLAN - L2 1/8" = 1'-0" 3 CONSTRUCTION SEQUENCE PLAN- L3 CONSTRUCTION SEQUENCING 01/16/15