HomeMy WebLinkAboutB14-0479 ComCheck.pdf COMcheck Software Version 3.9.4
Interior Lighting and Power
Compliance Certificate ...•.;o'RE `••••..
•
2012 IECC '• •
. • ......
0,%.
It •
cry -- 5837
zi cr.
Section 1: Project Information ;. �
12/19/144•.
Project Type:Alteration t0'2.'' �� •'.•
Project Title :Crespelle Pop Up Restaurant ••••Ss...... •'••
Construction Site: Owner/Agent: Designer/Contractor:
263 East Gore Creek Drive Jeff Mullikin
Vail,CO 81657 Architectural Engineering Design Group,
Inc.
1900 Wazee Street,Suite 350
Denver,CO 80202
Section 2: Interior Lighting and Power Calculation
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B x C)
Kitchen Area(Common Space Types:Food preparation) 331 1.2 397
Paper Storage(Common Space Types:Storage) 246 0.8 197
Restrooms(Common Space Types:Restroom) 126 1 126
Corridors(Common Space Types:Corridor/Transition) 379 0.7 265
Total Allowed Watts= 985
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Kitchen Area(Common Space Types:Food preparation 331 sq.ft.)
LED 1:Other: 1 10 18 180
Paper Storage(Common Space Types:Storage 246 sq.ft.)
LED 1 copy 1:Other: 1 8 18 144
Restrooms(Common Space Types:Restroom 126 sq.ft.)
LED 1 copy 2:Other: 1 2 18 36
Corridors(Common Space Types:Corridor/Transition 379 sq.ft.)
LED 1 copy 3:Other: 1 10 18 180
Total Proposed Watts= 540
Interior Lighting PASSES
Section 4: Compliance Statement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed ighting system as been designed to meet the 2012 IECC
requirements in COMcheck Version 3.9.4 and to comply with the mandator requirement n th- '-quirements Checklist.
Jeff Mullikin _ ,� 12/19/2014
Name-Title5:-. ure Date
Section 5: Post Construction Compliance Statement
Project Title: Crespelle Pop Up Restaurant Report date: 12/19/14
Data filename:J:\2856.00-Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 -2012 IECC.cck Page 1 of 2
Record Drawings and Operating and Maintenance Manuals:
1. Construction documents with record drawings and operating and maintenance manuals provided to the owner.
Lighting Designer or Contractor Name Signature Date
0111. •...
o°••, O RE(; j.'
0: 0 -35837 1. 1
. 12/19/144•
.1/43s/0NA- )..••'
•••••t... O•••.
Project Title: Crespelle Pop Up Restaurant Report date: 12/19/14
Data filename:J:\2856.00-Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 -2012 IECC.cck Page 2 of 2
COMcheck Software Version 3.9.4
(III li Inspection Checklist
Energy Code: 2012 IECC
Requirements: 76.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
•',...
4.0 *0 REG �.; .
`7�V <:
�i moo:
0: 5837 '
zi cr.
'; o12/112/19/14:4i.i
t 'i•'•••.. ..•••'�j�
****--8/01\-1A\- -'••
. .
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Crespelle Pop Up Restaurant Report date: 12/19/1
Data J:\2856.00 - Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 - 2012 IECC.cck Page 1 of 5
2012 IECC Plan Review Complies? Comments/Assumptions
C103.2 :Plans, specifications, and/or ❑Complies Requirement will be met.
[PR4]' calculations provide all information ❑Does Not
;with which compliance can be
determined for the interior lighting ['Not Observable
and electrical systems and equipment ❑Not Applicable
:and document where exceptions to
;the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
:bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
'.�p REG
•
Tü'. •
• v` '� 5837 ,
z •
• .
12/19/14
,.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Crespelle Pop Up Restaurant Report date: 12/19/1
Data J:\2856.00 - Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 - 2012 IECC.cck Page 2 of 5
2012 IECC Rough-In Electrical Inspection Complies? Comments/Assumptions
'C405.2.2. ;Automatic controls to shut off all ❑Complies Requirement will be met.
1 building lighting installed in all ❑Does Not
[EL22]z ;buildings.
❑Not Observable
❑Not Applicable
C405.2.1. Independent lighting controls installed ❑Complies Requirement will be met.
1 per approved lighting plans and all ❑Does Not
[EL23]z ;manual controls readily accessible and
;visible to occupants. ❑Not Observable
, ❑Not Applicable
C405.2.1. :Lighting controls installed to uniformly EComplies Exception:Areas that are controlled by an occupancy sensor.
2 :reduce the lighting load by at least ❑Does Not
[EL15]1 ;50%.
❑Not Observable
❑Not Applicable
C405.2.2. :Daylight zones provided with EComplies Requirement will be met.
3 l individual controls that control the ❑Does Not
[EL16]2 ;lights independent of general area
;lighting. ❑Not Observable
, ❑Not Applicable
C405.2.3 ;Sleeping units have at least one EComplies Exception: Requirement does not apply.
[EL17]3 :master switch at the main entry door ❑Does Not
;that controls wired luminaires and
;switched receptacles. ❑Not Observable
'❑Not Applicable
C405.2.2. sensors installed in ❑Complies Requirement will be met.
2 �required spaces. ❑Does Not
[EL18]1 ; ❑Not Observable
❑Not Applicable
C405.2.2. :Primary sidelighted areas are ❑Complies Exception: Enclosed daylight zones with two or fewer light
3 equipped with required lighting ❑Does Not fixtures do not require a separate switch for general area
[EL20]1 ;controls. lighting.
❑Not Observable
❑Not Applicable
C405.2.2. :Enclosed spaces with daylight area ❑Complies Exception: Requirement does not apply.
3 :under skylights and rooftop monitors ❑Does Not
[EL21]1 ;are equipped with required lighting
;controls. [Not Observable
❑Not Applicable
C405.2.3 Separate lighting control devices for ❑Complies Requirement will be met.
[EL4]1 :specific uses installed per approved ❑Does Not
;lighting plans.
❑Not Observable
❑Not Applicable
C405.3 :Fluorescent luminaires with odd EComplies Exception: Requirement does not apply.
[EL19]3 numbered lamp configurations that ❑Does Not
;are with 10 feet center to center(if
;recess mounted)or are within 1 foot ❑Not Observable'
sedge to edge(if pendant or surface ❑Not Applicable
;mounted) shall be tandem wired.
C405.4 ;Exit signs do not exceed 5 watts per ❑Complies Requirement will be met.
[EL6]1 :face. ❑Does Not
I ❑Not Observable
.I..........
❑Not Applicable ��.0 _0 REG•••••,
C405.2.3 :Additional interior lighting power ❑Complies Requirement will be met. ��.• , .,, .......... ,T . •
[EL8]1 :allowed for special functions per the ❑Does Not •.• •3 / ''s-_.•4 '
;approved lighting plans and is �.
;automatically controlled and ❑Not Observable ; S. '
separated from general lighting. ❑Not Applicable . U .45837
Additional Comments/Assumptions: = 12/19/14 :,.
. S/q�pL ,•
••
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Crespelle Pop Up Restaurant Report date: 12/19/1
Data J:\2856.00 - Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 - 2012 IECC.cck Page 3 of 5
•••......,,......
.•••p0 REG ..
•
c.�'- ( 5837
- 12/19/14 •'!;'S
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Crespelle Pop Up Restaurant Report date: 12/19/1
Data J:\2856.00 - Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 - 2012 IECC.cck Page 4 of 5
2012 IECC Final Inspection Complies? Comments/Assumptions
C408.2.5. :Furnished as-built drawings for ❑Complies
1 electric power systems within 30 days ❑Does Not
[F116]3 of system acceptance.
['Not Observable
❑Not Applicable
C303.3,C4:Furnished O&M instructions for ❑Complies
08.2.5.2 :systems and equipment to the ❑Does Not
[F117]3 :building owner or designated
;representative. Not Observable
❑Not Applicable
C405.5.2 :Interior installed lamp and fixture ❑Complies ,See the Interior Lighting fixture schedule for values.
[F118]1 :lighting power is consistent with what ❑Does Not
:is shown on the approved lighting
:plans, demonstrating proposed watts ENot Observable
:are less than or equal to allowed Observable,_,
Applicable
watts. _
C408.3 Lighting systems have been tested to ❑Complies
[F133]1 :ensure proper calibration, adjustment, ❑Does Not
:programming, and operation.
ENot Observable
❑Not Applicable
C406 :Efficient HVAC performance, efficient ❑Complies
[F134]1 :lighting system, or on-site supply of ❑Does Not
:renewable energy consistent with
;what is shown the approved plans. ENot Observable
I ENot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
`'�••. so RE(; T,
t 0' 4 115637 -•:! a
z
12/19/14:•' ci
'•.SS/ONA�-�.••.
•••......-•.
Project Crespelle Pop Up Restaurant Report 12/19/14
Data J:\2856.00 - Gorsuch PopUp Restaurant\Ltg Calcs\285600LC01 - 2012 IECC.cck Page 5 of 5