HomeMy WebLinkAboutB15-0003 Balance Report.pdfTEST, ADJUST AND BALANCE REPORT PROJECT VAIL 1ST BANK #1134 PREPARED FOR R&H MECHANICAL REPORT ISSUE DATE 3/23/2015 PREPARED BY HVAC TAB lie P.O. BOX 1926 VAIL, CO 81658 PHONE: 970-376-5198 E-MAIL: mrichardson@hvactab.co HVAC TAB lie DATE: 3/19/2015 PROJECT: 1 ST BANK VAIL REMODEL SYSTEM: HYDRONIC ATTN: R&HMECHANICAL PHONE: FAX: SYSTEM OBSERVATION SYSTEM OBSERVATION REPORT P-3 ALL BBH'S WERE TESTED WITH BYPASSES CLOSED THAT WAS THE ONLY WAY TO GET MAX FLOW TO BBH'S OF 24 GPM WITH BYPASSES OPEN ONLY GEITING 16 GPM P-3 PUMP WITH ALL BYPASSES OPEN ALL BBH'S ZONE VALVES CALLING FOR HEAT 16 GPM AT BBH'S P-3 PUMP WITH ALL 4 BYPASSES OPEN NO CALL FOR HEAT 27 GPM AT PUMP P-3 PUMP WITH ALL 4 BYPASSES CLOSED ALL BBH'S CALLING FOR HEAT 24 GPM AT PUMP HVAC TAB lie TEST, ADJUST AND BALANCE REPORT THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN COMPLIANCE WITH NBC PROCEDURAL STANDARDS. ANY VARIANCES FROM THE DESIGN REQUIREMENTS ARE NOTED THROUGHOUT THIS REPORT. THE RESULTS SHOWN AND INFORMATION PRESENTED IN THIS REPORT IS CERTIFIED TO BE ACCURATE AND COMPLETE, TO THE EXTENT POSSIBLE BY EQUIPMENT AND PROCEDURES USED THROUGH- OUT THIS SURVEY. THE FINAL AIR DISTRIBUTION SYSTEM MEASUREMENTS ARE IN COMPLIANCE WITH NBC PROCEDURAL ST AND ARDS FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS AND THE PROJECT SPECIFICATIONS. CERTIFIED BY: , DATE: --------------- THE FINAL HYDRONIC DISTRIBUTION SYSTEM MEASUREMENTS ARE IN COMPLIANCE WIIB NBC PROCEDURAL STANDARDS FOR TESTING, ADUSTING AND BALANCING OF ENVIRONMENT AL SYSTEMS AND THE PROJECT SPECIFICATIONS. CERTIFIEDBY:~/ ~ATE:S/J5/Jo15~ HVAC TAB lie WARRANTS THAT THE AIR AND HYDRONIC SYSTEM EVALUATED DURING THIS SURVEY IS OPERATING AT THE SPECIFIED LEVELS AS SHOWN WITHIN THIS REPORT, AT AND ONLY AT THIS TIME. HVAC TAB lie MAKES NO OTHER WARRANTIES, STATED OR IMPLIED, CONCERNING THE CONTINUED PERFORMANCE, OPERATION OR SAFETY IN THE USE OF THIS EQUIPMENT PASS THIS TIME. CERTIFIED Michael T. Richardson Page: I HVAC TAB, U.C I 13-llf34.03 EXplrea 2J22/2017 NATlONAl. BAIA"K:ING COUNOI. HVAC TAB lie DATE: 3/19/2015 PROJECT: lST BANK VAIL REMODEL PROJECT ALTITUDE: "HG INSTRUMENT/ SERIAL# APPLICATION SHORTRIDGE ADM-870C I #M09211 AIR FLOW READINGS ANEMOMETER #RVA501416001 AIR FLOW READINGS SHORTRIDGE FLOW HOOD AIF FLOW READINGS TH-720 HYGROMETER/ #TH7200950003 AIR TEMP I HUMIDITY PITOT TUBE 18" PRES. READINGS PITOT TUBE 24" PRES. READINGS PITOT TUBE 36" PRES. READINGS PITOT TUBE 48" PRES. READINGS SHIMPO TACHOMETER I #C105B0010 RPM READINGS FLUKE 375 I #21290229 VOLT I AMP SHORTRIDGE HDM-250/ #W08162 WATER PRES. READINGS ASCROFT I 0-100 PSI I #D068332-06 WATER PRES. READINGS FLUKE 561THERMOMETER/22370109 TEMP. READINGS REFRACTOMETER RHA-100 I #RHA-GLYCOL % READINGS 100 DATE OF USE NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED 3/19/2015 NOT USED NOT USED NOT USED INSTRUMENT CALIBRATION REPORT CALIBRATION CALIBRATION DATE DUE DATE 06/12/2014 061012/2015 04/14/2014 04114/2015 * * 06/04/2014 06/04/2015 NIA NIA NIA NIA NIA NIA NA NA 06/18/2014 06/18/2015 06/04/2014 06/04/2015 06/12/2014 06/12/2015 * * 06/19/2014 06/19/2015 NIA NIA * CHECKED TO CALIBRATED METER REMARKS: ALL READINGS WITH SHORTRIDGE INSTRUMENTS ARE CORRECTED FOR TEMPERATURE AND ALTITUDE. PAGE: HVACTAB lie DATE: 3/19/2015 PROJECT: 1ST BANK VAIL REMODEL FLOW METER LOCATION TYPE SIZE P-3 BBH-1 TACO 3/4" BBH-2A TACO 3/4" BBH-28 TACO 3/4" BBH-3 TACO 3/4" BBH-4A TACO 3/4" BBH-48 TACO 3/4" 2ND FLOOR TACO 3/4" rnNFRFNr.E P-5 BBH-7-8-9 TACO 3/4" r.m~RINED P-3 TA 1 1/2" P-5 TA 1 1/2" NOTES: BALANCE VALVE TEST REPORT SYSTEM: P-3 I P-5 DESIGN MEASURED DESIGN DESIGN VALVE 6p GPM FINAL6 P POSITION FINALGPM %OPEN 4.2 43.8" 100% 4.0 7.6 58.6" 100% 4.6 1.7 7.9" 55% 1.71 5.3 68.8" 100% 5.0 1.7 8.1" 45% 1.72 1.4 5.3" 35% 1.4 6.0 93.8" 100% 5.8 27.9 24.23 8.5 220.7" 100% 8.8 28.0 2.44' 4.2 24.23 8.5 3.2' 4.4 28.0 PAGE: ~ 011.!:MO'iEtimrrJIGo».fOS.SCOH!l'l,_'c.VAWt ... N:iXl1"1TOGCTllfl\IK'f ©~~~~~~7,.';~IN~~~~~=~'lt~~~'{'i.!~p~;~~5!~=~=I~~:'~~ ]t0 !118tf"IB 11 l1 1 [ ...... ····)~' .. -·---·-· -1CITJIJI:+u::· b f, ) Ir il 1\ \"! I ,, j ·--,r 11 II 1i II I~ l!!Mt-) t 1~ I I· 1t --~--:: . ' .C-'-'-'·'-' • f<D II 'It I 0 f ; : : : ·-·I lLllflH.l =u= .,,,,.~,::::~=":~,~;~": ,,__,,~-.::f-~;:::~~,,:=,..=,~J r.\D&llolOVTIONJl\AN l..!Jl/f••l'..O" ® ~ l/7 I CO ,.,._,}i;.11#) f I J-~f ~ ~s~"......l-· r~~c:© -'"~ f-i· I ':l ·~ u.u u,~~ i ••• ©~~? I! ·=11. /=i-f CJ ·.:.: ... J_ .. ·r:.i .LL. I (,\ ~] ci~'f'\}; ;.._) 0 7; ll I,, ' ' ~ ~ ·.~n ~ · L •....... Ll ......... i ... L. :f .. :1 ' ----Ji ,. 'l I {i) ,?'l 1.@ fl" D ' J ' 0 J ,_ . ~ ~ v f-t ··' ''{'•" I .:(,'I@,.-~ git·····-]· Q'' .. i.1 _,.. • I\ A ' ; '· ' ' '· 11 J ~1 .. ;..... .. .. . ' ' '''1 ·f: . • .·.· .... . ' -... , . ""; ;1 • -,(".-,.~' i:·'·L~@ ii B 'c Irr;[]: 0 ~ ffII"1in T1 ·n; ~1 e~rf,;";;\ -m·l·· -~i: .. :.j:l·=~t~;. •. ~~ii?=~~l~~~=-·': .. :··~ (~ 'i \(:y 0'.~'"'" ® ' t -"<j \ 1• KENNEY ARC!ilTECTS, P.C. 5510-IASTYAl.EA.\lt llDf'ER,COt.DfitMIOIOZ:ll JOJ.Ho4.l"4S f<AXJOJ.S65.149<4 wwwJr.enntyarcntt«ta.com ~ 360 ~~~~~~En~~~;~~"'~~ FIRST SANK """"""" ~=1==~~~ ~"'!!c..~~~~~°' -FIRST BANK VAIL TENANT IMPROVEMENT 17VAJlROAD VAIL, COLORADO 81657 ._.,. , .. OMO FIRST FLOOR MECHANICAL PIPING PLAN M-202