Loading...
HomeMy WebLinkAboutBegin_Workflow-02-12-2015_09-44-46.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Michael Rodenak ( michaelr@zehren.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building COV.pdf jmondragon building 001 provide building occupancy type construction type provide ADA path access plan and travel distances Yes | No No 1 Planning A102.3.pdf jspence Changemarks note #01 Louver would be more appropriately sited above but between windows. Yes | No No 1 Public Works L101.1.pdf toppenheimer Changemarks note #01 Cross reference for swing structure does not exist as noted. Submit stamped structural drawings fo rswing structure Yes | No No 1 Public Works ­ Engineers C­71.pdf tkassmel PW001 This area is likely to puddle just off the walk, similiar to how it does today on the north side. Yes | No No 1 Public Works ­ Engineers C­72.pdf tkassmel PW001 This area is likely to puddle just like it currently does on the north side. The 2 inlets provided will likely not pick up any water since there is no concetrated flow to them. Unless the south concrete band becomes a curb. By introducing the 1.8% cross slope, which side is the control side, south edge? Yes | No No 1 Public Works ­ Engineers C­102.pdf tkassmel PW001 By introducing this cross slope, will south edge need to be regraded as wel, so that the sheet flow does not puddle at the edge of the south concrete band? Yes | No No 1 Public Works ­ Engineers C­102.pdf tkassmel PW002 Since this lowers the path on the north edge, how is the south edge impacted, it is also very flat. How will the sheet flow get across the south edge? DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES Complete  Save And Close   Building Process V1 1 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM APPROVED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PLANNING JONATHAN SPENCE  JSPENCE@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PUBLIC WORKS TODD OPPENHEIMER  TOPPENHEIMER@VAILGOV.COM CORRECTIONS REQUIRED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PUBLIC WORKS ­ ENGINEERS TOM KASSMEL  TKASSMEL@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions