HomeMy WebLinkAboutMP1.0.pdfGREASE WASTE BELOW GRADE
INDIRECT WASTE
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
WASTE ABOVE GRADE
DOMESTIC HOT WATER RECIRC.
DOMESTIC HOT WATER
DOMESTIC COLD WATER
PLUMBING LEGEND
MEDIUM PRESSURE NATURAL GAS
GREASE WASTE ABOVE GRADE
WASTE BELOW GRADE
GAS
G
MPG
VENT THROUGH ROOF
CLEAN OUT TO GRADE
FLOOR CLEAN OUT
WALL CLEAN OUT
CLEAN OUT
NEW
EXISTING
CO
WCO
FCO
COTG
(E)
(N)
VTR
IW
VENT
CONDENSATE DRAIN
C
UP THROUGH ROOF
UTR
PIPE RISER
PIPE DROP
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PIPE TAKEOFF (FROM TOP OF MAIN)
PIP END CAP
PIPE CONTINUATION
PIPE EXPANSION GUIDE
PIPE UNION
PIPE ANCHOR
FLEXIBLE PIPE CONNECTION
PIPE EXPANSION JOINT
POINT OF NEW CONNECTION
AIR VENT
PLUG VALVE
CHECK VALVE
BALL VALVE
BALANCING VALVE
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
STRAINER
PRESSURE - TEMP. TAP
PRESSURE GAUGE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
4-WAY CONTROL VALVE
FLOW REGULATOR VALVE
DIFFERENTIAL BYPASS VALVE
NATURAL GAS PRESSURE REGULATOR
THERMOMETER
UP
UP
DOWN
DN
PLUMBING SPECIFICATIONS:
1. GENERAL:
a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES
NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL
WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN.
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO
MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE
MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT
WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM,
EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED
HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING
INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE
MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER
AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR
RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY
SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS
BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING
CONDITIONS & EXACT NATURE OF THE WORK.
b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR
FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW
EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO
THOROUGHLY MAKE THE EXAMINATION.
5. CODES AND PERMITS:
a. ALL PLUMBING EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE
2012 INTERNATIONAL PLUMBING CODE (IPC), 2012 INTERNATIONAL ENERGY
CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE
TOWN OF VAIL BUILDING DEPARTMENT.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.
c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO
THE ARCHITECT.
6. AS-BUILTS:
a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS
WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT
AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
7. GUARANTEE:
a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND
MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND
MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION.
8. SUBMITTALS:
a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL
BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH).
ELECTRONIC SUBMITTALS PREFERRED.
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO
PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.
10. CUTTING AND PATCHING:
a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR
EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X-RAY SLABS PRIOR TO CORING.
11. CLEANUP:
a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR
SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS
INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY.
12. PLUMBING IDENTIFICATION
a. EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR
PERMANENT ATTACHMENT ON EQUIPMENT.
b. PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING
SERVICE, AND SHOWING DIRECTION OF FLOW.
c. VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING
SYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME.
PROVIDE 5/32" HOLE FOR FASTENER.
d. VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED
TO THE MAINTENANCE ENGINEER FOR RECORD.
13. PIPE INSULATION:
a. DOMESTIC WATER PIPING INSULATION SHALL HAVE A THERMAL
CONDUCTIVITY LESS THAN OR EQUAL TO 0.27 BTU-IN/HR-FT2-F.
b. HOT & COLD WATER SUPPLY PIPING (EXCEPT RUN OUTS 12 FT. OR SHORTER
TO INDIVIDUAL FIXTURES) SHALL BE INSULATED AS FOLLOWS:
PIPE SIZE (IN.) INSULATION THICKNESS (IN.)
1/2", 3/4" & 1" 1"
1 1/4" THROUGH 6" 1 1/2"
c. NO HOT OR COLD WATER PIPING SHALL BE ROUTED IN EXTERIOR WALLS
UNLESS PROPERLY INSULATED.
d. CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC.
e. STORM DRAIN PIPING SHALL BE INSULATED WITH FIBERGLASS INSULATION
FROM THE UNDERSIDE OF THE DECK TO THE VERTICAL RISER.
14. PIPING:
a. WASTE, VENT AND STORM DRAIN PIPING:
i. SHALL BE STANDARD WEIGHT CAST IRON HUB LESS TYPE.
ii. UNDERGROUND PIPING CAN ALSO BE SCHEDULE 40 PVC.
iii. VENT PIPING IN RETURN AIR CEILING PLENUMS SHALL BE COPPER PIPING.
b. WATER PIPING:
i. SHALL BE TYPE "L" COPPER HARD DRAWN WITH WROUGHT COPPER FITTINGS.
ii. JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER.
iii. :$7(53,3,1*´ߙ60$//(5&$1$/62%(:,56%2$48$3(;$355(+$8
RAUPEX OR EQUIVILANT-PROVIDE DEDUCT ALTERNATE PRICING.
c. CONDENSATE PIPING SHALL BE TYPE "M" COPPER WITH SOLDER JOINTS.
15. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM ANY
MECHANICAL INTAKE AND AT LEAST THREE FEET FROM ANY OPENING INTO THE
BUILDING.
16. VERIFY INVERT ELEVATION OF WASTE LINE IN STREET. PROVIDE SEWAGE WASTE
EJECTOR IF I.E. OF EXISTING SANITARY WASTE CAN NOT BE ACCOMODATED.
17. CLEAN-OUTS SHALL BE INSTALLED AS PER 2012 IPC SECTION 708.
18. 3527(&7522)5(&(372521522))5205$,1:$7(5%<(/(9$7,1*7+(5,0ò´
INCHES ABOVE ROOF SURFACE.
19. PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR WALLS,
ROOF AND FLOORS.
20. PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE FIRE-STOPPED.
FIRE-STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED AND
CAPABLE OF MAINTAINING ITS INTEGRITY WHEN SUBJECTED TO TEST TEMPERATURE
FOR SPECIFIC WALL OR PARTITION.
21. PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS AT ALL
PIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACT
WITH ANY PORTION OF THE STRUCTURE. APPLIES TO ALL WATER AND WASTE PIPING.
22. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY
EXACT LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THIS
SECTION. MAKE REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING UTILITIES. IF
INDICATED POINTS OF CONNECTION CANNOT BE MADE TO UTILITIES AS FOUND, THE
CONTRACTOR SHALL, BEFORE CONTINUING, NOTIFY THE ARCHITECT PRIOR TO
INSTALLING ANY WORK WHICH MAY BE AFFECTED.
23. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR
INSTALLING THE WORK.
24. VALVES SHALL BE NIBCO, JENKINS, WALWORTH, STOCKHAM OR EQUAL. SERVICE
PRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED.
25. PROVIDE HANGERS AND SUPPORTS MEETING THE REQUIREMENTS SPECIFIED IN THE
2012 IPC SECTION 308. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.
26. CONTRACTOR SHALL AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT REQUIRING
ROUTINE MAINTENANCE AND SHALL PROVIDE THREE COPIES OF MAINTENANCE AND
OPERATING MANUALS TO THE OWNER/OPERATOR.
27. CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL UTILITY METERS AND UTILITY
CONNECTIONS.
28. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO
THE GREATEST EXTENT POSSIBLE. ALL LINES NOT CONCEALED SHALL BE SECURED 6"
OFF FLOOR AND 3/4" FROM WALL AND CEILINGS USING OFFSET BRACKETS.
29. AN APPROVED BACKFLOW PREVENTER SHALL BE PROPERLY INSTALLED UPSTREAM
OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A SOURCE
OF CONTAMINATION.
30. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS SHALL BE
PROVIDED BY THE PLUMBING CONTRACTOR AND WIRED BY THE ELECTRICAL
CONTRACTOR.
MECHANICAL SPECIFICATIONS:
1. GENERAL:
a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES
NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED
ON THE DRAWINGS AND/OR SPECIFIED HEREIN.
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A
COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE
SPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARY
TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE
SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING
DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER
SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE
KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND
THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE
OF THE WORK.
b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A
COMPLETE AND FUNCTIONAL SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS
FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE
EXAMINATION.
5. CODES AND PERMITS:
a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012
INTERNATIONAL MECHANICAL CODE (IMC), 2012 INTERNATIONAL ENERGY
CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL
BUILDING DEPARTMENT.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.
c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE
ARCHITECT.
6. AS-BUILTS:
a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL
CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL
ACCEPTANCE AND PAYMENT.
7. GUARANTEE:
a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON
ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE
YEAR AFTER COMPLETION.
8. SUBMITTALS:
a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES (WITH ALL
OPTIONS CLEARLY MARKED) SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX
COPIES OF EACH). ELECTRONIC SUBMITTALS PREFERRED.
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE
BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.
10. CUTTING AND PATCHING:
a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL
BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X-RAY SLABS PRIOR TO CORING.
11. CLEANUP:
a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL
REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK
AND LEAVE THE PREMISES CLEAN AND ORDERLY.
12. DUCTWORK:
l. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2012 IMC
AND SMACNA STANDARDS.
m. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS.
DUCTWORK SIZES INDICATED ARE FREE CLEAR DIMENSIONS.
n. ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE
WITH VERSA GRIP OR MESH.
o. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSURE
DROP PER 100 FEET.
p. EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BE
EQUIPPED WITH A MEANS OF SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, AND
BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED
FOR AIR INTAKES AND/OR DISCHARGES.
q. '28%/(7+,&.1(667851,1*9$1(66+$//%(86('21$//'8&7785162)
13. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL
EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL,
STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE
REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY
MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTURE AND
THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT
IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR.
14. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT
TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT
LOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES
AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS.
15. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR
WORKING SPACE SHALL BE PROVIDED BY GENERAL CONTRACTOR.
16. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE
APPROVED VIBRATION ISOLATORS.
17. EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO
INSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF
FLOWS AND CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER
OPERATING CONDITION.
18. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL
PLANS, ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT).
19. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS
IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH
MANUFACTURER MANDATED SERVICE REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST
BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL.
20. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION,
OPERATION & MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICE
CLEARANCES.
21. ELECTRICAL CONNECTIONS:
a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL
OVERLOADS, LOW VOLTAGE THERMOSTATS, CONTROL RELAYS, CONTROL
TRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED BY THE MECHANICAL
CONTRACTOR.
b. PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS
INDICATED ON THE DRAWINGS.
c. IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE
CONTRACT DOCUMENTS.
d. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF
VOLTAGE, WITH OTHER TRADES, SO THAT ALL SYSTEMS ARE COMPLETE AND
OPERATIONAL.
e. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION.
f. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY
MECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR.
225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632
MAIN 970.926.6007 MARTINMARTIN.COM
FORD PARK IMPROVEMENTS
LOWER BENCH
C
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone: 970-748-8520 Fax: 970-748-8521
EG
$Q2IILFHZLWK/(('$FFUHGLWHG3URIHVVLRQDOV
/2
MECHANICAL & PLUMBING
SPECS & LEGEND
04/10/15