Loading...
HomeMy WebLinkAboutMP1.0.pdfGREASE WASTE BELOW GRADE INDIRECT WASTE NOTE: ALL SYMBOLS SHOWN ON LEGEND ARE NOT NECESSARILY USED. WASTE ABOVE GRADE DOMESTIC HOT WATER RECIRC. DOMESTIC HOT WATER DOMESTIC COLD WATER PLUMBING LEGEND MEDIUM PRESSURE NATURAL GAS GREASE WASTE ABOVE GRADE WASTE BELOW GRADE GAS G MPG VENT THROUGH ROOF CLEAN OUT TO GRADE FLOOR CLEAN OUT WALL CLEAN OUT CLEAN OUT NEW EXISTING CO WCO FCO COTG (E) (N) VTR IW VENT CONDENSATE DRAIN C UP THROUGH ROOF UTR PIPE RISER PIPE DROP PIPE TAKEOFF (FROM BOTTOM OF MAIN) PIPE TAKEOFF (FROM TOP OF MAIN) PIP END CAP PIPE CONTINUATION PIPE EXPANSION GUIDE PIPE UNION PIPE ANCHOR FLEXIBLE PIPE CONNECTION PIPE EXPANSION JOINT POINT OF NEW CONNECTION AIR VENT PLUG VALVE CHECK VALVE BALL VALVE BALANCING VALVE BUTTERFLY VALVE PRESSURE REDUCING VALVE STRAINER PRESSURE - TEMP. TAP PRESSURE GAUGE 2-WAY CONTROL VALVE 3-WAY CONTROL VALVE 4-WAY CONTROL VALVE FLOW REGULATOR VALVE DIFFERENTIAL BYPASS VALVE NATURAL GAS PRESSURE REGULATOR THERMOMETER UP UP DOWN DN PLUMBING SPECIFICATIONS: 1. GENERAL: a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN. b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS. 2. WORKMANSHIP: a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT. 3. MATERIALS: a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED. 4. SITE INSPECTION: a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK. b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION. 5. CODES AND PERMITS: a. ALL PLUMBING EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012 INTERNATIONAL PLUMBING CODE (IPC), 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT. b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT. 6. AS-BUILTS: a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT. 7. GUARANTEE: a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION. 8. SUBMITTALS: a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH). ELECTRONIC SUBMITTALS PREFERRED. 9. COORDINATION: a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE. b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC. 10. CUTTING AND PATCHING: a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK. b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT. c. X-RAY SLABS PRIOR TO CORING. 11. CLEANUP: a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY. 12. PLUMBING IDENTIFICATION a. EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR PERMANENT ATTACHMENT ON EQUIPMENT. b. PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE, AND SHOWING DIRECTION OF FLOW. c. VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME. PROVIDE 5/32" HOLE FOR FASTENER. d. VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THE MAINTENANCE ENGINEER FOR RECORD. 13. PIPE INSULATION: a. DOMESTIC WATER PIPING INSULATION SHALL HAVE A THERMAL CONDUCTIVITY LESS THAN OR EQUAL TO 0.27 BTU-IN/HR-FT2-ƒF. b. HOT & COLD WATER SUPPLY PIPING (EXCEPT RUN OUTS 12 FT. OR SHORTER TO INDIVIDUAL FIXTURES) SHALL BE INSULATED AS FOLLOWS: PIPE SIZE (IN.) INSULATION THICKNESS (IN.) 1/2", 3/4" & 1" 1" 1 1/4" THROUGH 6" 1 1/2" c. NO HOT OR COLD WATER PIPING SHALL BE ROUTED IN EXTERIOR WALLS UNLESS PROPERLY INSULATED. d. CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC. e. STORM DRAIN PIPING SHALL BE INSULATED WITH FIBERGLASS INSULATION FROM THE UNDERSIDE OF THE DECK TO THE VERTICAL RISER. 14. PIPING: a. WASTE, VENT AND STORM DRAIN PIPING: i. SHALL BE STANDARD WEIGHT CAST IRON HUB LESS TYPE. ii. UNDERGROUND PIPING CAN ALSO BE SCHEDULE 40 PVC. iii. VENT PIPING IN RETURN AIR CEILING PLENUMS SHALL BE COPPER PIPING. b. WATER PIPING: i. SHALL BE TYPE "L" COPPER HARD DRAWN WITH WROUGHT COPPER FITTINGS. ii. JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER. iii. :$7(53,3,1*´ߙ60$//(5&$1$/62%(:,56%2$48$3(;$355(+$8 RAUPEX OR EQUIVILANT-PROVIDE DEDUCT ALTERNATE PRICING. c. CONDENSATE PIPING SHALL BE TYPE "M" COPPER WITH SOLDER JOINTS. 15. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM ANY MECHANICAL INTAKE AND AT LEAST THREE FEET FROM ANY OPENING INTO THE BUILDING. 16. VERIFY INVERT ELEVATION OF WASTE LINE IN STREET. PROVIDE SEWAGE WASTE EJECTOR IF I.E. OF EXISTING SANITARY WASTE CAN NOT BE ACCOMODATED. 17. CLEAN-OUTS SHALL BE INSTALLED AS PER 2012 IPC SECTION 708. 18. 3527(&7522)5(&(372521522))5205$,1:$7(5%<(/(9$7,1*7+(5,0ò´ INCHES ABOVE ROOF SURFACE. 19. PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR WALLS, ROOF AND FLOORS. 20. PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE FIRE-STOPPED. FIRE-STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED AND CAPABLE OF MAINTAINING ITS INTEGRITY WHEN SUBJECTED TO TEST TEMPERATURE FOR SPECIFIC WALL OR PARTITION. 21. PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS AT ALL PIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACT WITH ANY PORTION OF THE STRUCTURE. APPLIES TO ALL WATER AND WASTE PIPING. 22. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THIS SECTION. MAKE REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING UTILITIES. IF INDICATED POINTS OF CONNECTION CANNOT BE MADE TO UTILITIES AS FOUND, THE CONTRACTOR SHALL, BEFORE CONTINUING, NOTIFY THE ARCHITECT PRIOR TO INSTALLING ANY WORK WHICH MAY BE AFFECTED. 23. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR INSTALLING THE WORK. 24. VALVES SHALL BE NIBCO, JENKINS, WALWORTH, STOCKHAM OR EQUAL. SERVICE PRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED. 25. PROVIDE HANGERS AND SUPPORTS MEETING THE REQUIREMENTS SPECIFIED IN THE 2012 IPC SECTION 308. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE. 26. CONTRACTOR SHALL AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT REQUIRING ROUTINE MAINTENANCE AND SHALL PROVIDE THREE COPIES OF MAINTENANCE AND OPERATING MANUALS TO THE OWNER/OPERATOR. 27. CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL UTILITY METERS AND UTILITY CONNECTIONS. 28. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO THE GREATEST EXTENT POSSIBLE. ALL LINES NOT CONCEALED SHALL BE SECURED 6" OFF FLOOR AND 3/4" FROM WALL AND CEILINGS USING OFFSET BRACKETS. 29. AN APPROVED BACKFLOW PREVENTER SHALL BE PROPERLY INSTALLED UPSTREAM OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A SOURCE OF CONTAMINATION. 30. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR. MECHANICAL SPECIFICATIONS: 1. GENERAL: a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN. b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS. 2. WORKMANSHIP: a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT. 3. MATERIALS: a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED. 4. SITE INSPECTION: a. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK. b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION. 5. CODES AND PERMITS: a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012 INTERNATIONAL MECHANICAL CODE (IMC), 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT. b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT. 6. AS-BUILTS: a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT. 7. GUARANTEE: a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION. 8. SUBMITTALS: a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES (WITH ALL OPTIONS CLEARLY MARKED) SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH). ELECTRONIC SUBMITTALS PREFERRED. 9. COORDINATION: a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE. b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC. 10. CUTTING AND PATCHING: a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK. b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT. c. X-RAY SLABS PRIOR TO CORING. 11. CLEANUP: a. UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY. 12. DUCTWORK: l. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2012 IMC AND SMACNA STANDARDS. m. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS. DUCTWORK SIZES INDICATED ARE FREE CLEAR DIMENSIONS. n. ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE WITH VERSA GRIP OR MESH. o. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSURE DROP PER 100 FEET. p. EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BE EQUIPPED WITH A MEANS OF SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND/OR DISCHARGES. q. '28%/(7+,&.1(667851,1*9$1(66+$//%(86('21$//'8&7785162)ƒ 13. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC, ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR. 14. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS. 15. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE SHALL BE PROVIDED BY GENERAL CONTRACTOR. 16. ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION ISOLATORS. 17. EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO INSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION. 18. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS, ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT). 19. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER MANDATED SERVICE REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL. 20. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION, OPERATION & MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES. 21. ELECTRICAL CONNECTIONS: a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, LOW VOLTAGE THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED BY THE MECHANICAL CONTRACTOR. b. PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS INDICATED ON THE DRAWINGS. c. IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE CONTRACT DOCUMENTS. d. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITH OTHER TRADES, SO THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL. e. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION. f. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR. 225 MAIN STREET, UNIT C 101, EDWARDS, COLORADO 81632 MAIN 970.926.6007 MARTINMARTIN.COM FORD PARK IMPROVEMENTS LOWER BENCH C Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 Fax: 970-748-8521 EG $Q2IILFHZLWK/(('Œ$FFUHGLWHG3URIHVVLRQDOV /2 MECHANICAL & PLUMBING SPECS & LEGEND 04/10/15