Loading...
HomeMy WebLinkAboutB15-0017 Scope of Work Letter.pdf AWI Custom Construction Company PO Box 2020 Edwards, CO 81632 970-926-4994 February 4, 2015 Arrabelle 682 scope of work Entry and closet -Adding new entry door, new closet bypass doors, closet shelving and a new interlock door at the entry to the rest of the unit for sound and security and added wood floor at closet and new entry and necessary hardware coordinated with Arrabelle Loss Prevention. HVAC control to Lock off and adjacent bedroom--Remove the drywall of the ceiling and walls around the fan coil in Hall closet necessary ceiling in the closet and hall and install a controlled mechanical damper that will operate on a thermostat in each bedroom for heating and cooling. An access panel will need to be located for access to this mechanical damper.