Loading...
HomeMy WebLinkAboutBegin_Workflow-03-10-2015_15-11-27.pdfClick Here to Save Eform as PDF... Complete  Save And Close   Building Process V1 Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Shelley Bellm  ( sbellm@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon David Collins ( dcollins@antlersvail.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A3 602.pdf jmondragon building 001 architect stamp required electrical load calcs required framing materials ?? Framing materials are metal  stud frame and 5/8"drywall Load calc being prepard by  electrical Contractor  Yes | No No 1 Building A3 602.pdf jmondragon building 002 fireplace?? complatible materials ? is existing flue useable, firestop/ draft stop Existing flue will be used.  draft stop will be placed  where required. enclosure  is metal stud framed and  densglas sheathing with  DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING FLORENCIO MONDRAGON  JMONDRAGON@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions