Loading...
HomeMy WebLinkAboutA5-11.pdfUP UP 7 7 8 8 10 11 12 F D C F. E 13 13 14 14 15 15 16 16 C. B W-2SM W-1SM W-1SM W-1SM W-1SM W-1SM FITNESS AREA EXISTING CORRIDOR EXISTING CORRIDOR 1A A5.11 2A A5.11 CORRIDOR SIDE UNIT SIDE EXISTING CORRIDOR WALL CAREFULLY CUT AND REMOVE GYP CEILING FROM ADJACENT WALL SUFFICIENT TO INSTALL 2 LAYERS 5/8" GYP 2 NEW LAYERS 5/8" GYP EXISTING METAL DECKING ABOVE FIBERGLASS BATT INSULATION TO STEEL DECK ABOVE NOTE: EXISTING GYP @ CORRIDOR WALL TO REMAIN, DO NOT DISTURB OR DAMAGE CORRIDOR WALL FINISHES REINSTALL GYP CEILING & FINISH TO MATCH EXISTING CORRIDOR CEILING ACOUSTICAL JOINT CAULK EXISTING UNIT DO NOT DISTURB MIN. IF POSSIBLE 1' - 0" CORRIDOR SIDE FITNESS SIDE EXISTING CORRIDOR WALL EXISTING METAL DECKING ABOVE EXISTING CORRIDOR DO NOT DISTURB NEW FULL HEIGHT BATT INSULATION EXISTING GYP. EXISTING GYP. CEILING NEW 3 LAYERS 5/8" GYP PROPOSED: REMOVE EXISTING WALL & CEILING AS NEED TO INSTALL BATT INSULATION. FILL STUD CAVITY WITH FULL HEIGHT UNFACED FIBER GLASS INSULATION. INSTALL 3 LAYERS OF 5/8" TYPE "X" GYP. SCRIBE GYP BOARD TO PROFILE OF METAL DECK TO MAINTAIN TO A 3/8" MAXIMUM JOINT. SEAL ALL OPENINGS WITH ACOUSTICAL SEALANT AT FLOOR AND HEAD ( FIRE RATED SEALANT IF NESSESARY ), STAGGER SEAMS BETWEEN GYP. LAYERS. EXISTING GYP. CEILING TO BE REMOVED ACCOUSTICAL JOINT CAULK ACCOUSTICAL JOINT CAULK 10 10 11 11 12 12 K H F D D C F. E E 13 13 14 14 15 15 C. W-2SM 2A A5.11 1650 Fallridge Road, Suite C-1 Vail, Colorado 81657 f.(970) 476-4901 p.(970)476-6342 600 Vail Valley Drive Vail, Colorado 81657 A5.11 ACOUSTICAL MITIGATION Northwoods Renaissance PROJECT # 1022 05/18/15 1/8" = 1'-0" A5.11 3 SECOND FLOOR - SOUND MITIGATION 1 1/2" = 1'-0" A5.11 2A W1-2SM - WALL ASSEMBLY @ CORRIDORS 1 1/2" = 1'-0" A5.11 1A W1-1SM - WALL ASSEMBLY @ FITNESS AREA 1/8" = 1'-0" A5.11 4 FIRST FLOOR - SOUND MITIGATION Future Fitness? If this is Future Fitness, use a 2x2 layer wall or W1-1SM at a minimum. Upgrade other unit walls to W1-2SM if necessary. SMW Comments 5/22/2015 Is this layer already there in the existing condition? If it isn't, it should be added to extend the corridor side of the drywall to structure & seal. 09/30/15