HomeMy WebLinkAboutPL3.1 - REBAR LAYOUT.pdf#4 REBAR @12" O.C.
EACH WAY
(4) #4 REBAR
CONTINUOUS AT TOP
OF BOND BEAM (4) #4 REBAR CONTINUOUS AT TOP
OF BOND BEAM
4'-91
2"
EQ
EQ 1012" 3"CLR.
1'-0"
#5's REBAR @12" O.C.
EACH WAY
(1) #4
(1) #4
#4's REBAR @12" O.C.
1'-10"
OVERLAP
#5 REBAR @ 12"
EACH WAY TYPICAL
(4) #4 REBAR
CONTINUOUS AT
TOP OF BOND
BEAM
1
PL3.1
2'-10"
10" 3'-105
8" VERIFY 10" #5 REBAR @ 12"
EACH WAY TYPICAL
14'-13
4"
4'-3"
101
2"
8'-71
8"101
2"
18'-15
8"
1PL1.2
1
PL1.2
95
8"
95
8"
95
8"
95
8"
95
8"
1012" 4'-91
2"
EXISTING POOL
SHELL AND FINISHES
TO REMAIN
VERIFY
NEW PORTION OF
INDOOR POOL
EPOXY NEW REBAR INTO
EXISTING SHELL IN 3/4" DIA.
X 6" HOLES @12" O.C.
3'-91
2"
2'-6" DEEP
#5's REBAR @12" O.C.
EACH WAY
#3 IN EACH NOSING
#4's @12" O.C.
1'-10"
PL3.1
SCHEMATIC REBAR LAYOUT
PROJECT:
DRAWING:
NORTHWOODS VAIL
PROJECT:
DRAWING: SCAPES
DATE
6-30-15 7-13-15 8-4-15 ISSUE
D.D.
C.D.
C.D.
SCALE: 1/2"=1'-0"
REBAR PLAN
2 SCALE: 1/2"=1'-0"
REBAR SECTION
1 SCALE: 1/2"=1'-0"
REBAR SECTION AT EXISTING POOL
3 08/05/2015
09/30/15