Requested Inspect Date: Friday, August 07z,2015 Site Address: 1339 WESTHAVEr.i CR VAIL
A/P/D Information
Activity: B15-0057 Type: COMBO Sub TY.pe: ASFR Const Type: Occupancy: Ose: R-3
Owner: HOVEY, NANCY M.
Applicant: BECK BUILDING COMPANY Phone: 970-949-1800
Contractor: BECK BUILDING COMPANY Phone: 970-949-1800
Page 7
Status: ISSUED lnsp Area:
Description: Interior GRFA conversion of existing 5' headroom height crawlspace into storage area. Add wirsbo in slab for
future heating system. Add future underground plumo1n_g_for toilet waste line. (rough in only) Notice: REV1 no temp shoring needed -Structural Revisions. GC lowered the valuation by $30,000. This is reflected on Revisions screen. Once it has been approved by Building Dept. that no temp shoring is needed then the taxes/use tax needs to be manuallv adjusted and if there 1s a refund due to GC then a refund needs to be
Qrocessed with TOV Finance Dept. -CGODFREY Notice: Projectdox -CGODFREY Comment: Steel Inspection Report routed to projectdox and JR -CGODFREY
Comment: S~ecial Inspection routed to wojectdox and MH -CGODFREY
Comment: REV1 routed to Projectdox -CGODFREY Comment: emailed contractor read for issuance -MHAEBERLE ,.--j
Comment: REV2 add wirsbo in sla and plumbing routed to Projectdox -CGO REY
Requested Inspection(&) 0 Requester: BECK BUILDING COMPAN P e· Item: 542 PLAN-FINAL \ Requested Time:
Comments: 376-4345
Assigned To: GRUTHER Action:
Item: 90 BLDG-Final
Requester: BECK BUILDING COMPANY Comments: 376-4345 Assigned To: JMONDRAGON
Action: Time p: Comment: all building elements complete · st waiting for final SI report
Inspection History
Item: 10 BLDG-FOOTING ••App ved •• 04/20/15 Inspector· sgremmer
Comment: 2 pad loo · g
05/04/15 Inspector: sgremmer Comment: rear wall 05/07/15 Inspector: sgremmer Comment: 6' of footing at south wall 05/18/15 Inspector: sgremmer Comment: Item: 20 BLDG-Foundation/Steel ••Approved••
05/07/15 Inspector: sgremmer Comment: east foundation wall complete 05/07/15 Inspector: JRM Comment: MIDDLE SECTION ONLY 05/18/15 Inspector: sgremmer
Comment: Item: 120 ELEC-Rough ••Approved ••
06/18/15 Inspector: CC Comment: Item: 220 PLMB-Rough/D.W .V. ••Approved••
05/22/15 lns12ector: JRM Comment: 10 FT HEAD 06/18/15 Inspector: CC Comment: Item: 230 PLMB-Rough/Water ••Approved••
06/18/15 Inspector: CC Comment: Item: 200 MECH-Rough ••Approved••
06/01 /1 S-Inspector: sgremmer Comment: lnfloor heat 06/18/15 Inspector: CC
Comment: Item: 30 BLDG-Framing ••Approved••
REPT131
Action:
Action: Pl PARTIAL INSPECTION
Action: Pl PARTIAL INSPECTION
Action: AP APPROVED
Action: Pl PARTIAL INSPECTION
Action: Pl PARTIAL INSPECTION
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED