HomeMy WebLinkAboutBY1.pdfHovey Residence
1339 Westhaven Circle
Vail, Colorado
Temporary Ground Nail Wall* for Foundation Underpinning
BY-1. Ground Nail Wall - Cover
BY-2. Ground Nail Wall - Locations
BY-3. Ground Nail Wall - General Notes
BY-4. Ground Nail Wall - Typical Sections and Details
* These plans and specifications are designed to provide temporary foundation and excavation support with a finite design life during
construction operations. Long-term earth pressure loads shall be included in the structural design.
Ground Nail Wall
Cover
March 13, 2015
Hovey Residence
1339 Westhaven Circle
15-015G-D1
BY-1
of 4
RDJ
Project Number:
Date: Sheet Number:
Prepared by: Project:
Set Revisions
Date Revision/Issue Prepared by
B&Y Drilling, Inc.
Designed For:
Seal:
266 Red Cliff Circle Glenwood Springs, CO 81601
Phone: (970) 230-9208
03/30/15