HomeMy WebLinkAboutBY2.pdfA
BY-4
BY-4
B
A
BY-4
Ground Nails through existing foundation wall
3 each, equally spaced
Ground Nails through existing foundation wall
3 each, equally spaced
Ground Nails below existing foundation wall
2 rows (8 total), equally spaced
Ground Nail Wall
Location
March 13, 2015
Hovey Residence
1339 Westhaven Circle
15-015G-D1
BY-2
of 4
RDJ
Project Number:
Date: Sheet Number:
Prepared by: Project:
Sheet Revisions
Date Revision/Issue Prepared by
B&Y Drilling, Inc.
Designed For:
Seal: N
Notes:
1. Base plan by the mj mueller co., Inc. dated 02.03.2015.
266 Red Cliff Circle Glenwood Springs, CO 81601
Phone: (970) 230-9208
03/30/15