Loading...
HomeMy WebLinkAboutBY2.pdfA BY-4 BY-4 B A BY-4 Ground Nails through existing foundation wall 3 each, equally spaced Ground Nails through existing foundation wall 3 each, equally spaced Ground Nails below existing foundation wall 2 rows (8 total), equally spaced Ground Nail Wall Location March 13, 2015 Hovey Residence 1339 Westhaven Circle 15-015G-D1 BY-2 of 4 RDJ Project Number: Date: Sheet Number: Prepared by: Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For: Seal: N Notes: 1. Base plan by the mj mueller co., Inc. dated 02.03.2015. 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 03/30/15