HomeMy WebLinkAboutPL0.1.pdf1. ANY QUESTIONS OR DISCREPANCIES SHALL BE VERIFIED PRIOR TO THE START OF ANY CONSTRUCTION.
2. POOL CONFIGURATION SHALL MEET PUBLISHED STANDARDS OF THE COLORADO DEPARTMENT OF HEALTH
. AND SWIMMING POOL REGULATIONS.
3. GENERAL CONTRACTOR SHALL COORDINATE ALL ELEMENTS WITH ALL OTHER TRADES.
4. SEE CIVIL DRAWINGS FOR SITE UTILITIES AND SUBSURFACE DRAINAGE.
5. DECK SHALL BE NON SLIP FINISH, SLOPE DECK AWAY FROM POOL TO AREA DRAINS.
6. DEPTH MARKERS : (IF REQUIRED)
A. DEPTH MARKERS SHALL BE 6" MIN. HIGH NUMERALS ON POOL DECK AND 4" AT THE POOL WALL
WITH A MAXIMUM OF 25' INTERVALS. "NO DIVING" MARKERS WILL BE THE SAME.
B. POOL DEPTH MARKERS ON THE FACE OF THE POOL WALL SHALL BE LOCATED AT OR ABOVE THE
WATER SURFACE OF THE SWIMMING POOL IN PLAIN VIEW TO BATHERS.
C. DEPTH MARKERS SHALL BE OF COLOR CONTRASTING WITH BACKGROUND COLOR.
7. ALL POOL STEPS AND SEAT EDGES SHALL HAVE A MIN. OF 2" TILE BAND OF CONTRASTING COLOR.
8. ALL JUNCTIONS BETWEEN SWIMMING POOL WALLS AND THE SWIMMING POOL FLOOR SHALL BE COVED.
9. ALL WATER INLETS SHALL BE A MINIMUM OF 15' INTERVALS.
10. IF TOILET / DRESSING ROOMS ARE INCLUDED, THEY SHALL HAVE NON SLIP FLOORING.
11. EMERGENCY SHUTOFF SHALL BE LOCATED IN CLOSE PROXIMITY AND VISIBLE FROM POOL /SPA.
1. OWNER TO KEEP DAILY RECORDS ON POOL OPERATIONS AND MAINTENANCE TO BE SUBMITTED
AS REQUIRED TO THE HEALTH DEPARTMENT WHILE THE POOL IS IN OPERATION.
2. AN APPROVED DPD TEST KIT CONTAINING ALL COLOR STANDARDS AND MEANS FOR
DETERMINING TOTAL ALKALINITY, pH, CHLORINE, CYAN URIC ACID LEVELS AND SALT CONTENT.
1. ANY STRUCTURAL OR SOILS ENGINEERING
2. ANY CORE DRILLING AND/OR ACCESS THROUGH FOUNDATIONS.
3. ANY EXCAVATION.
4. ANY TRENCHING, INCLUDING SAND BEDDING.
5. ANY BACK FILLING.
6. ANY HIGH VOLTAGE WIRING, INCLUDING HIGH VOLTAGE CONDUIT INSTALLATIONS, BONDING (POOL
STEEL AND ALL EQUIPMENT) AND INSTALLATION OF ALL HIGH VOLTAGE WIRING TO ALL POOL/SPA
MECHANICAL. (INCLUDING LIGHT CONDUIT, POOL COVER AND J-BOXES).
7. ANY BOILER INSTALLATION, ALL BOILER PLUMBING, ANY COPPER PLUMBING, GAS PLUMBING,
VENTING AND CONTROLS (EXCEPT FOR POOL/SPA TEMPERATURE CONTROL WHICH WILL ONLY BE A DRY
SWITCH (NO 24V POWER PROVIDED).
8. ANY FRESH WATER PLUMBING FOR AUTO-FILL AND HOSE BIB, INCLUDING BACK FLOW PREVENTORS.
9. ANY MECH. ROOM DRAINS, INCLUDING SEWER DRAIN AND FILTER BACKWASH DRAIN.
10. ANY MECH. ROOM VENTING, INCLUDING MAKE-UP AIR, COMBUSTION AND EXHAUST VENTING.
11. ANY POOL / SPA COPING.
12. ANY BUILDING OR DECK DESIGN, ENGINEERING OR INSTALLATION, INCLUDING ALL EXPANSION
JOINTS AND DECK DRAINS.
13. ANY DECK ANCHOR INSTALLATION FOR HANDRAILS - COORDINATE WITH POOL CONTRACTOR.
14. COORDINATE ANY POOL / SPA SKIMMER EXTENSION COLLAR INSTALLATION WITH POOL
CONTRACTOR PRIOR TO DECK INSTALLATION.
15. $1<:,17(57(17,1*$1'+($7,1*,)$0%,(17$,57(03(5$785(,6%(/2:)
16. ANY UP-CHARGES ON TILE OVER $5.00/SQ. FT. TILE ALLOWANCE.
17. COLORADO POOLSCAPES OR ANY OF IT'S REPRESENTATIVES SHALL NOT BE HELD LIABLE OR
RESPONSIBLE FOR ANY LIFE SAFETY ISSUES REGARDING THE OPERATION OF THE POOL AND /OR SPA OR
POOL FACILITIES.
18. LOCATION OR REQUIREMENTS OF POOL AND /OR SPA ENCLOSURE, REQUIRED FENCING OR SAFETY
DEVICES FOR POOL AND/ OR SPA AREA.
19. DIVING BOARDS ARE NOT PERMITTED ON THIS POOL /SPA.
20. OWNER TO PROVIDE REQUIRED CARBON MONOXIDE DETECTORS.
MECHANICAL / PLUMBING WORK:
1. PROVIDE FOR FRESH AIR VENTING / AIR HANDLING (AND HEATING OR COOLING AS
REQUIRED) IN MECHANICAL ROOMS, POOL / SPA EQUIPMENT ROOMS, CHEMICAL
STORAGE & INDOOR POOL / SPA FACILITIES.
2. HEAT EXCHANGERS NEED SPECIFIC Btu REQUIREMENTS PROVIDED THROUGH HOUSE
BOILER SYSTEM W/ ZONE VALVE REQUIRED. PROVIDE 24V, ALL BOILER CONTROL WIRING
FROM CONTROL THERMOSTAT (DRY SWITCH) TO BOILER CONTROLS.
3. PROVIDE AND INSTALL BOILER SYSTEMS. MECHANICAL CONTRACTOR SHALL
INSTALL ALL GAS PIPING AND VENTING, INCLUDING EXHAUST, COMBUSTION AND MAKEUP
AIR VENTING. GAS HEATERS NEED SPECIFIC GAS AND VENTING REQUIREMENTS AND WILL
NEED TO BE INSTALLED PER MANUFACTURER REQUIREMENTS.
4. PROVIDE AND INSTALL HEATER VENTING, AND COMBUSTION AIR, IF NECESSARY.
5. ALL GAS PIPING, IF NECESSARY.
6. PLUMBING CONTRACTOR SHALL PROVIDE FRESH WATER CONNECTION TO POOL,
AND WASTE WATER CONNECTION FROM FILTER, INCLUDING BACK FLOW PREVENTER
(SUPPLIED TO POOL MECHANICAL ROOM WITH THREADED ADAPTER FOR POOL
CONTRACTOR TO HOOKUP TO POOL PLUMBING) AS SPECIFIED AND SHOWN ON
DRAWINGS.
7. FLOOR DRAINS: AT LEAST ONE TO SANITARY SEWER FOR ANY MOISTURE FROM
EQUIPMENT AND MAINTENANCE IF A SAND FILTER IS USED A DRAIN TO SANITARY SEWER
FOR BACK WASHING (TO HANDLE 140 GPM BY GRAVITY). FURNISH AND INSTALL THE
FILTER BACKWASH FLOOR SINKS AND / OR STANDPIPES AND LINE BEYOND AIR-GAP TO
WASTE.
8. FURNISH AND INSTALL HOSE BIBS IN MECHANICAL / POOL EQUIPMENT ROOMS AND
IN DECK AREAS AS SHOWN IN DRAWINGS, OR AS REQUIRED.
9. FURNISH AND INSTALL ALL 'DECK DRAINS' TO WASTE AS REQUIRED BY CODE.
PROVIDE FOR ADDITIONAL DECK DRAINAGE AS SHOWN ON ARCHITECTURAL AND
LANDSCAPING DRAWINGS.
10. EYE WASH OR EMERGENCY SHOWER STATION SHALL BE THE RESPONSIBILITY OF
THE MECHANICAL CONTRACTOR. THEY SHALL BE INSTALLED PER OSHA AND ANSI
REQUIREMENTS.
11. FURNISH AND INSTALL RPZ BACK FLOW PREVENTER AND ISOLATION VALVES FOR
DOMESTIC FRESH WATER SUPPLY.
12. FURNISH AND INSTALL FRESH WATER AND WASTE WATER PLUMBING TO
MECHANICAL / POOL EQUIPMENT ROOM.
13. ASSIST POOL CONTRACTOR AT TIME OF START UP.
ELECTRICAL WORK:
1. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL CONNECTIONS,
EQUIPMENT, HOOK-UPS, WIRING AND CONDUIT. ALL WIRING TO CONFORM TO THE NATIONAL
ELECTRICAL CODE AND STATE ELECTRICAL CODES.
2. POOL CONTRACTOR SHALL PROVIDE THE FILTER PUMPS, MOTORS, AUTO-FILL SOLENOIDS AND
PRE-WIRED CONTROL ASSEMBLIES AS CALLED FOR ON PLANS AND OR REQUIRED BY POOL SYSTEMS
EQUIPMENT MANUFACTURER. THE ELECTRICAL CONTRACTOR SHALL INSTALL AND WIRE ALL
ELECTRICAL EQUIPMENT FURNISHED BY THE POOL CONTRACTOR AND SHALL PROVIDE ALL
DISCONNECT SWITCHES, EMERGENCY SHUT OFF SWITCHES, PANELS, GROUNDING, CONDUIT AND
MOTOR STARTERS OR RELAYS IF REQUIRED, AS INDICATED OR REQUIRED BY CODES.
3. THE ELECTRICAL CONTRACTOR SHALL PROVIDE POOL SHELL GROUNDING PER N.E.C. ARTICLE
680.
4. PROVIDE AND INSTALL ALL POWER AND CONTROL WIRING AS INDICATED BY SCHEMATIC DETAIL
OF DRAWINGS AND ELECTRICAL COORDINATION TABLE.
5. ALL ELECTRICAL DISCONNECTS, SWITCHES, MAGNETIC STARTER, STOP-START STATIONS,
RECEPTACLES AND RELAYS SHALL BE SPECIFIED BY CSI- DIVISION 16 WORK, AND COORDINATED
WITH THE POOL CONTRACTORS WORK. FURNISH AND INSTALL ALL CONDUIT, WIRING FOR
DISCONNECTS, MAGNETIC STARTERS, STOP-START STATIONS, RELAYS AND CONTROLS AS REQUIRED
AND INCLUDING THE FOLLOWING PUMP MOTORS, ETC....
6. FURNISH AND INSTALL ALL OUTLETS AND SERVICE NEEDED FOR THE CHEMICAL FEED AREA
EXHAUST FANS, CHLORINE AND CHEMICAL FEED PUMPS, AUTOMATIC WATER LEVEL CONTROLS AND
SOLENOID VALVE, WATER CHEMICAL ANALYZER EQUIPMENT (INCLUDING TELEPHONE TERMINALS BY
CODE) AND RELATED CONTROLLED PUMPS, FLOW SWITCHES, AS WELL AS ADEQUATE LIGHTING IN THE
MECHANICAL / POOL EQUIPMENT AND RELATED SPACES IN ACCORDANCE WITH THE SPECIFICATIONS
AND AS SHOWN ON THE DRAWINGS. INTERLOCK ALL CHEMICAL FEED EQUIPMENT AS SHOWN ON THE
ELECTRICAL CONTROL SCHEMATIC.
7. ELECTRICAL AND BONDING CONNECTIONS FOR THE STEEL CAGE OF POOLS, ANY HANDRAILS,
ALL EQUIPMENT, INCLUDING LIGHTS (NEED CONDUIT RUN FROM POOL LIGHT TO DECK BOX AND THEN
TO EQUIPMENT ROOM) AND ALL NECESSARY OUTLETS FOR EQUIPMENT.
8. INSTALLATION OF ANY POOL OR SPA LIGHTS WITH GROUNDING WIRES. POOL CONTRACTOR
WILL SUPPLY POOL / SPA LIGHTS.
9. ALL LIGHT RUNS NEED TO GO FROM SHELL LIGHT NICHE TO DECK BOX LOCATED AT LEAST 18"
ABOVE WATER LEVEL. THEN FROM THE DECK BOX TO THE CONTROL BOX.
10. ALL CONDUIT RUNS FOR HIGH VOLTAGE, INCLUDING CONDUIT FROM POOL LIGHT NICHE TO
DECK BOX JUNCTION TO EQUIPMENT ROOM.
11. ALL GROUNDING AND BONDING OF ALL NECESSARY WATER FEATURES OR ITEMS IN OR NEAR
ALL WATER FEATURES, PER LOCAL AND NATIONAL ELECTRICAL CODES.
12. NO OUTLETS LOCATED WITHIN 10 FEET OF POOL. ALL OTHER OUTLETS SHALL BE G.F.I.
PROTECTED AS REQUIRED, REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS AND
SPECIFICATIONS.
13. PROVIDE ASSISTANCE TO POOL CONTRACTOR AT TIME OF START UP.
STRUCTURAL NOTES:
1. STRUCTURAL ENGINEER SHALL PROVIDE ALL BUILDING AND SITE STRUCTURAL IMPROVEMENTS
REQUIRED FOR POOL AND SPA CONSTRUCTION.
2. SOIL SHALL HAVE A MINIMUM BEARING VALUE OF 1000 PSF. CONCRETE SHALL BE PLACED
AGAINST UNDISTURBED SOIL OR BUILDING DEPARTMENT APPROVED 90 % COMPACT FILL. THIS PLAN IS
NOT SUITABLE WHERE POTENTIAL EXISTS FOR DIFFERENTIAL MOVEMENT FROM DISSIMILAR SOIL
CONDITIONS UNDER POOL, SUCH AS CUT-FILL TRANSITIONS.
3. ALL REINFORCING STEEL SHALL BE DEFORMED BARS AND CONFORM TO ASTM A615 SPLICES TO
BE LAPPED 22" MIN; MIN. CLEARANCE BETWEEN PARALLEL BARS IS 21/2". REFER TO DRAWINGS FOR
SIZES AND SPACING.
4. GROUNDING PER N.E.C./C.E.C OF THE STRUCTURAL REINFORCING MUST BE INSTALLED PRIOR TO
PLACEMENT OF CONCRETE.
5. SHOT CRETE (GUNITE) TO BE IN CONFORMANCE WITH UBC/IBC SECTION 1914 AND SHALL HAVE A
MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS, AND CONSIST OF 1 PART PORTLAND
CEMENT TO 41/2 PARTS SAND & 3 GALLONS OF WATER PER SACK OF CEMENT.
6. CEMENT SHALL CONFORM TO UBC/ IBC STD 19-1, ASTM 150.6.
7. USE TYPE V PORTLAND CEMENT IN AREAS WITH MORE THAN 2 % SULFATE CONTENT AND AS
DIRECTED BY LOCAL BUILDING CODES.
8. KEEP CONCRETE DAMP CONTINUOUSLY FOR 14 DAYS.
9. ALL INTERIOR SURFACES OF POOL AND SPA SHALL BE COATED WITH A WATERPROOF PLASTER
FINISH.
GENERAL CONTRACTOR WORK:
1. ALL SITE WORK SHALL BE THE FULL RESPONSIBILITY OF THE GENERAL CONTRACTOR. INCLUDING
SITE PREPARATION AND EXCAVATION, INCLUDING ANY TRENCHING FOR PLUMBING AND CONDUIT RUNS.
ALL COSTS RELATED TO SPECIAL SOIL PREPARATION, STABILIZATION, FLASH COATS ( IF REQUIRED),
BACK FILL AND DRAINAGE AROUND THE POOL / SPA FOR SPECIAL REQUIREMENTS OF THE
PNEUMATICALLY APPLIED CONSTRUCTION METHOD SO THAT THE STRUCTURAL DESIGN AND
CONSTRUCTION RESULTS IN A COMPLETE SYSTEM WITHOUT ANY ADDITIONAL COST TO THE OWNER.
2. ALL BENCHMARKS AND LAYOUT POINTS.
3. ALL SITE WORK SHALL NOT BE STARTED UNTIL THE GENERAL CONTRACTOR HAS LOCATED ALL
EXISTING UNDERGROUND UTILITIES, NOTIFIED THE LOCAL GAS, ELECTRICAL OR OTHER UTILITY
COMPANIES.
4. IT IS THE FULL RESPONSIBILITY OF THE GENERAL CONTACTOR TO MAINTAIN EXISTING SITE WORK
CONSTRUCTION AND MAINTAIN EXISTING VEGETATION, PER THE ARCHITECTURAL AND LANDSCAPE
DRAWINGS.
5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING FRESH WATER TO FILL THE POOL AND/OR
SPAS.
6. GENERAL CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A CLEAN AND SAFE SITE.
7. GENERAL CONTRACTOR IS RESPONSIBLE FOR SOILS CONDITIONS AND ANY UNDER DRAINAGE
SYSTEMS REQUIRED. POOL AND/OR SPAS SHALL NOT BE LOCATED WHERE GROUND WATER EXISTS,
ABOVE BOTTOM OF POOL DURING HIGH WATER TABLE, UNLESS HYDRO STATIC RELIEF VALVES ARE
INSTALLED AT THE LOW POINT IN THE POOL, AND ALL PUMPING OR DE-WATERING NECESSARY TO KEEP
EXCAVATIONS FREE FROM WATER. POOL CONTRACTOR SHALL BE NOTIFIED IF HYDRO STATIC RELIEF
VALVES ARE REQUIRED, PRIOR TO INSTALLATION. SOILS REPORT REQUIREMENTS SHALL BE FOLLOWED.
8. ALL BACK FILL WORK PER SOILS AND STRUCTURAL RECOMMENDATIONS.
9. ANY OVER EXCAVATION AND PLACEMENT OF STONE OR COMPACTED ENGINEERED FILL REQUIRED
ELSEWHERE BY THE DOCUMENTS FOR BUILDING STRUCTURES AND COMPONENTS, SHALL ALSO APPLY
TO THE POOL AND SPAS AND BURIED PIPING. WISHA / OSHA REGULATIONS SHOULD BE ADHERED TO.
10. PROVIDE THAT ALL SOILS ENGINEERING RECOMMENDATIONS HAVE BEEN EXECUTED. GENERAL
CONTRACTOR IS TO PROVIDE COMPACTED STRUCTURAL FILL, WITH CLEAN GRAVEL AS REQUIRED BY
SOILS REPORT.
11. PROVIDE THAT ALL STRUCTURAL ENGINEERING RECOMMENDATIONS HAVE BEEN EXECUTED.
12. PROVIDE AND INSTALL ANY WATERPROOFING SYSTEMS OUTSIDE OF POOL STRUCTURE IN
REGARDS TO STRUCTURAL SLAB PENETRATIONS AND OR ARCHITECTURAL BUILDING PENETRATIONS.
13. PROVIDE AND INSTALL ALL CHLORINE RESISTANT SEALANT AND EXPANSION JOINTS OUTSIDE THE
POOL STRUCTURE WITHIN AREAS OF POOLS / SPAS OR DECK, INCLUDING BACKER RODS, PRIMERS AND
ACCESSORIES REQUIRED.
14. PROTECT ALL TILE SURFACES AND / OR FINISHES FROM CONCRETE OR PAINT SPLASH OR DAMAGE
UNTIL ACCEPTED BY OWNER.
15. IF SAFETY FENCING IS REQUIRED, THE GENERAL CONTACTOR SHALL BE RESPONSIBLE FOR THE
REQUIREMENTS, LOCATION AND CONSTRUCTION. IF HANDRAILS OR HANDICAP RAMPS OR LIFTS ARE
REQUIRED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF DECK ANCHORS WITH
BONDING, AS REQUIRED.
16. ALL STATE AND LOCAL DEPARTMENT OF PUBLIC HEALTH CONSTRUCTION PERMITTING.
17. ALL STATE AND LOCAL BUILDING DEPARTMENT CONSTRUCTION PERMITTING.
18. IT IS THE FULL RESPONSIBILITY OF THE GENERAL CONTRACTOR TO MAINTAIN ALL NECESSARY
BARRICADES, SIGNS, LIGHTS, FLARES AND SAFETY EQUIPMENT AS REQUIRED TO PROTECT WORKERS
AND THE PUBLIC.
19. PROVIDE AND MAINTAIN PROPER SHORING AND BRACING FOR EXISTING UTILITIES, SEWERS,
BUILDING FOUNDATIONS, OR ANY BUILDING COMPONENTS.
20. PROVIDE MECHANICAL / POOL EQUIPMENT ROOM WITH NECESSARY PUMP HOUSEKEEPING PADS
AND METAL EQUIPMENT RACKS AS REQUIRED.
CONCRETE WORK:
1. ALL SITE CONCRETE WORK SHALL BE THE FULL RESPONSIBILITY OF THE CONCRETE CONTRACTOR.
2. PROVIDE ALL BLOCK OUTS AS REQUIRED.
3. PROVIDE ALL EQUIPMENT HOUSEKEEPING PADS AS SHOWN ON DRAWINGS, COORDINATE WITH
MECHANICAL / PLUMBING FOR REQUIRED DRAINS AND SLOPES.
4. IF CHEMICAL ROOMS ARE REQUIRED, PROVIDE 4" H. CURB CONTINUOUS AT BASE OF ROOMS
(UNDER DOORS AND WALLS).
5. PROVIDE ALL STRUCTURAL CONCRETE WORK OUTSIDE OF POOL SHELL PER STRUCTURAL
ENGINEER.
6. PROVIDE ALL NON STRUCTURAL CONCRETE WORK OUTSIDE OF POOL SHELL, PER ARCHITECTURAL
/ LANDSCAPE DRAWINGS.
7. ALL DECK AND COPING WORK (MAY BE COVERED UNDER MASONRY SUB CONTRACTOR.)
8. INSTALL ALL ANCHORS, SOCKETS, INSERTS AND HANDRAIL /GRAB BAR GOODS THAT ARE NOT
LOCATED WITHIN THE POOL SHELLS, PROVIDED AND COORDINATED WITH POOL CONTRACTOR.
9. COORDINATE WITH POOL CONTRACTOR AND INSTALL ANY DECK SURFACE DEPTH MARKER TILES /
IMBEDS AND 'NO DIVING' TILES / IMBEDS, PROVIDED BY POOL CONTRACTOR.
10. PROVIDED ALL PIPE SLEEVES AND INSTALL SLEEVES IN FORMS FOR OTHERS CONTRACTORS AT
THE PROPER LOCATIONS.
11. ANY STONE / TILE WORK VENEER WORK OUTSIDE OF POOL SHELL, PER ARCHITECTURAL DRAWINGS.
LANDSCAPING WORK:
1. ALL LANDSCAPING WORK SHALL BE THE FULL RESPONSIBILITY OF THE GENERAL CONTRACTOR.
SHEET
NUMBER
SHEET TITLE
PL0.1 SPECIFICATIONS & GENERAL NOTES
PL1.0 SITE PLAN
PL1.1 SPA PLAN
PL1.2 SPA SECTIONS AND INTERIOR ELEVATIONS
PL1.3 SPA DETAILS
PL2.1 EQUIPMENT LAYOUT, EQUIPMENT SCHEDULE & COORDINATION SCHEDULE
PL2.2 PIPING & CONDUIT LAYOUT SCHEMATIC
PL2.3 PLUMBING SCHEMATIC
PL3.1 SCHEMATIC STRUCTURAL REBAR LAYOUT
SHEET INDEX
ARCH ARCHITECT
ASTM AMERICAN STANDARD TESTING AND
MATERIALS
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
ELEC ELECTRICAL
EC ELECTRICAL CONTRACTOR
FT FOOT
GC GENERAL CONTRACTOR
GFI GROUND FAULT INTERRUPTER
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GPM GALLONS PER MINUTE
HP HORSEPOWER
IBC INTERNATIONAL BUILDING CODE
MECH MECHANICAL
MIN MINIMUM
MC MECHANICAL CONTRACTOR
NEC NATIONAL ELECTRICAL CODE
OSHA OCCUPATIONAL SAFETY HAZARD
ASSOCIATION
PC POOL CONTRACTOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
REQ REQUIRED?SQ FTSQUARE FEET
TBD TO BE DETERMINED
TDH TOTAL DYNAMIC HEAD
TYP TYPICAL
UBC UNIFORM BUILDING CODE
V VOLT
W WATT
S
BATHERS: 7-12
SIZE: 12-0" x 8'-0" SHAPED
DEPTH: 3'-6"
PERIMETER: 32'-5"
SURFACE: 71.2 SQ. FT.
CAPACITY: 1,260 GALLONS
TURNOVER: 20 MINUTES
GALLONS PER MINUTE: 114 GPM
FITTINGS: MAIN DRAINS, SKIMMERS, INLETS & ALL OTHER PVC FITTINGS (T.B.D.)
LIGHT: LIGHTS WILL HAVE STANDARD STAINLESS STEEL FACE RING
POOL WALL SURFACE: SGM PEARL BRITE (COLOR T.B.D.)
WATER EDGE TILE:
6" WATER LINE TILE BANK, TILE IS 2" x 2" CERAMIC POOL/SPA TILE $5.00 PER SQUARE FOOT TILE
MATERIAL ALLOWANCE (COLOR T.B.D.)
STEP EDGE & BENCH TILE:
OPTIONAL 2" x 2" CERAMIC TILE BAND, CONTRASTING COLOR FROM PLASTER COLOR. CERAMIC
POOL/SPA TILE $5.00 PER SQUARE FOOT TILE MATERIAL ALLOWANCE (COLOR T.B.D.)
COPING: COPING AND ANY EXTERIOR VENEER BY G.C.
DECKING: ALL DECKING, EXPANSION JOINTS & DECK GUTTERS T.B.D. FURNISHED AND INSTALLED BY G.C.
SPA SPECIFICATIONS
8
DRAWING SYMBOLS9
THE FOLLOWING LIFESAVING EQUIPMENT SHALL BE PROVIDED BY THE OWNER (UNLESS OTHERWISE STATED)
AND SHALL BE ACCESSIBLE WITHIN THE CONFINES OF THE POOL AREA. PROVIDE 1 UNIT OF LIFESAVING
EQUIPMENT PER 2,000 SQ. FT. OF WATER SURFACE AREA OR FRACTION THEREOF:
1. U.S. COAST GUARD APPROVED RING BUOY WITH A LENGTH OF ROPE AT LEAST EQUAL TO THE
MAXIMUM WITH OF THE POOL.
2. A SHEPHERD'S CROOK AT LEAST 16' IN LENGTH.
3. FIRST AID KIT MUST MEET O.S.H.A. REQUIREMENTS AND CONTAIN THESE ITEMS:
x 2 UNITS - 1" x 3" ADHESIVE COMPRESS
x 2 UNITS - 2" x 3" NON GAUZE PADS
x 2 UNITS - 1" x 5 YARDS STRETCH GAUZE BANDAGE
x 2 ROLLS - 1
2" x 10 YARDS ADHESIVE WATERPROOF TAPE
x 1 UNITS - 4 OZ. OPHTHALMIC IRRIGATING SOLUTION
x 2 PAIRS - SURGICAL SCISSORS SHEARS
x 3 UNITS - LATEX GLOVES
x 2 POCKET MASKS AND FACE SHIELDS EACH
x 2 UNITS - 3" x 3" GAUZE PADS
x 2 ANTISEPTIC OINTMENT PACKETS
4. SPINE BOARD WITH HEAD IMMOBILIZING AND RESTRAINT STRAPS.
5. EMERGENCY PHONE - BY GENERAL CONTRACTOR
7 SAFETY EQUIPMENT NOTES
6 PLAN NOTES
5 EXCLUSIONS FROM POOL CONTRACTOR
4
MAINTENANCE NOTES
3 ABBREVIATIONS
2 COORDINATION NOTES (CONTINUED)
1 COORDINATION NOTES 10
COPING
STRUCTURE
EARTH
CONCRETE
TILE
GRAVEL
LIGHTS
DRAINS
FILTERS
HEAT EXCHANGER
CIRCULATION PUMP
PEOPLE
WATER INLET
VALVE
SOLENOID VALVE
LINE OF WATER
HYDROTHERAPY JETS
SKIMMER
AUTO FILL
A A
HANDRAIL
PL0.1
TITLE SHEET
PROJECT:
DRAWING:
COLDSTREAM CONDOS SPA REMODEL
VAIL, COLORADO
DATE ISSUE
8-8-14 PRELIM
10-1-14 REVISIONS
1-16-15 REVISIONS
3-11-15 DD
3-16-15 CD
SCAPES
09/09/15