Loading...
HomeMy WebLinkAboutPL1.2.pdfHYDROTHERAPY JETS, REFER TO EQUIPMENT SCHEDULE FLOOR MOUNTED MAIN SUCTION DRAIN VGB APPROVED, REFER TO EQUIPMENT SCHEDULE FINISH MATERIAL BY G.C. DECKING AROUND SPA BY G.C. REFER TO ARCHITECTURAL DRAWINGS COPING BY G.C. STEP BY G.C. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN 95 8" 95 8" 95 8" 95 8" 95 8" 1'-6" TOP OF NEW DECK REFER TO ARCHITECTURAL DRAWINGS 1'-3" 101 2" 4" 2'-10" HANDICAP TRANSFER RAIL SEE DETAIL, REFER TO EQUIPMENT SCHEDULE FLOOR MOUNTED MAIN SUCTION DRAIN VGB APPROVED, REFER TO EQUIPMENT SCHEDULE FINISH MATERIAL BY G.C. 1 PL1.3 4'-912" 1'-3" 3" VERIFY 1'-0" TOP OF NEW DECK REFER TO ARCHITECTURAL DRAWINGS 1'-6" 101 2" 4" 9 PL1.3 BENCH BENCH BENCH STEP STEP STEP STEP STEP STEP A C B D H M C L H L C M L H H M H M C L H M H L L H M C PL1.2 SECTIONS SCALE: 1/2"=1'-0" SECTION 2 PROJECT: DRAWING: COLDSTREAM CONDOS SPA REMODEL VAIL, COLORADO DATE ISSUE 8-8-14 PRELIM 10-1-14 REVISIONS 1-16-15 REVISIONS 3-11-15 DD 3-16-15 CD SCAPES SCALE: 1/2"=1'-0" SECTION 3 SCALE: 1/2"=1'-0" HYDROTHERAPY JET LAYOUT 1 SCALE: 1/2"=1'-0" HYDROTHERAPY JET LAYOUT A SCALE: 1/2"=1'-0" HYDROTHERAPY JET LAYOUT B SCALE: 1/2"=1'-0" HYDROTHERAPY JET LAYOUT C SCALE: 1/2"=1'-0" HYDROTHERAPY JET LAYOUT D 09/09/15