Loading...
HomeMy WebLinkAboutPL2.3.pdfFILTER CIRCULATION PUMP A B A S A A A FROM SPA RETURN TO SPA BACKWASH TO SANITARY WASTE AUTO FILL FRESH WATER SUPPLY FLOOR SINK OR FLOOR DRAIN 1" PIPE 2" PIPE BY M.C. PRV BACK FLOW BY P.C. 3 4 " PIPE F HYDRO THERAPY PUMP TO SPA JETS A A A 2 WAY ISOLATION VALVE C 3 WAY BY PASS VALVE E CHECK VALVE B 2 WAY BY PASS VALVE F UNION M S SOLENOID VALVE MOTORIZED VALVE SKIMMER 2" PIPE 1" PIPE 2" PIPE 3" PIPE 3" PIPE HEATER BYPASS VALVE CHLORINE EROSION FEEDER (OPTIONAL) HEATER B B A PL2.3 PLUMBING SCHEMATIC SCALE: 1/2"=1'-0" SCHEMATIC PLUMBING LAYOUT 1 PROJECT: DRAWING: COLDSTREAM CONDOS SPA REMODEL VAIL, COLORADO DATE ISSUE 8-8-14 PRELIM 10-1-14 REVISIONS 1-16-15 REVISIONS 3-11-15 DD 3-16-15 CD SCAPES 09/09/15