Loading...
HomeMy WebLinkAboutSpecial Inspection and Testing Schedule.pdfSPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC) The owner or his/her representative, on the advice of the design professional in responsible charge, shall complete,seal,sign and submit a copy of the Special Inspection Agreement and Structural Tests Scheduled to the Town of Vail for review and approval.Signatures are required on both pages; photocopied or faxed signatures are acceptable. The owner and his/her general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1.Contractor is responsible for proper notification to the Inspection or Testing agency for items listed.(Page 1)(IBC 1704) 2.Only the testing laboratory should take samples and transport them to their laboratory. 3.Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on a weekly basis. 4.Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail for review and approval.(Page 2) 5.The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and/or problems encountered. 6.It is the responsibility of the contractor to review the Town of Vail approved plans for additional inspection or testing requirements that may be noted. A pre-construction conference at the job site is recommended to review special inspection procedures. 7.The special inspector shall use only the Town of Vail approved drawings. 8.All special inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re-inspections. BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and sealed statement that all items requiring testing and inspection were fulfilled and reported. Those items not tested and/or inspected shall be noted in this statement. A copy of the statement shall be maintained at the job site for the Building Inspector’s review prior to final inspection. Acknowledgement: Owner: Signature Print Name Date Special Inspection Agency: Signature Print Name Date Project Arch/Eng: Signature Print Name Date Contractor: Signature Print Name Date Job Name: Job Address: Permit No.: -3- Coldstream Condominiums 1476 Westaven Drive Heather Duncan 03/20/15 Don MacLachlan, Coldstream Bill Pierce David Young, HP Geotech SPECIAL INSPECTION AND TESTING SCHEDULE (IBC 1704) Project Name:Permit # Owner’s Name: Testing Inspection Signature Print Name Date Agency: Testing Inspection Signature Print Name Date Hereby certifies that the Testing/Inspection Agency named above has been engaged to perform structural tests and inspections during construction as checked below, to satisfy all applicable portions of the Building Code. Prior to final inspection, the Inspection Agency shall submit a statement that all items of designated work performed were reported. Any items checked but not tested or inspected will be noted and explained. Whenever any designated items on the list are ready for sampling, testing, or inspection, it shall be the responsibility of the contractor to give timely notice to the Inspection agency so that the required services may be performed. REINFORCING STEEL: _____Tensile & Bend, one set per heat per _____ tons _____Inspection of Placement _____Inspection of Welding _____Epoxy MASONRY: _____Prelim. Acceptance Tests (Masonry Units, Wall Prisms) _____Subsequent Tests (Mortar, Grout, Field Wall Prisms) _____Inspection of Placement and Grouting CONCRETE, SHOTCRETE, GROUT AND MORTAR: Concrete Shot Grout Mortar Aggregate tests for design Suitability of aggregates Mix Designs Test Panel Batch Plant Inspection Cement Grab Sample Inspect Placing Compression Tests Cast Specimens Pick-up Samples Shrinkage Bars Yield Check Air Check Dry Unit Weight PRECAST CONCRETE: _____Reinforcing Tests _____Inspection of Reinforcing Placement _____Tendon Tests _____Inspection of Tendon Placement _____Inspection of Concrete Placement _____Inspection of Concrete Batching _____Inspection of Panel Attachment & Inserts _____Compression Tests _____Inspection of Stressing/Transfer PILING, CAISSONS, CAPS, TIES: _____Inspection of Reinforcing Placement _____Inspection of Concrete Placement _____Inspection of Concrete Batching Specify other tests, inspections or special instructions required. UNDERPINNING: _____Temporary/Permanent _____Inspection of Steel Fabrication _____Inspection of Reinforcing & Forms _____Inspection of Concrete Placement _____Inspection of Tiebacks _____SOIL NAILS: _____Temporary Shoring _____Permanent Wall STRUCTURAL STEEL: _____Sample & Test (List specific members below) _____Shop Identification & Welding Inspection _____Shop Ultrasonic Inspection _____Shop Radiography _____Field Welding Inspection _____Field Bolting Inspection _____Field Ultrasonic Inspection _____Field Radiography _____Metal Deck Welding Inspection FIREPROOFING: _____Inspection & Placement SOILS: _____Acceptance Tests _____Moisture-Density Determination _____Field Density _____Drilled Piers _____Deep Foundation STRUCTURAL WOOD: _____Inspection of Fabrication _____Inspection of Truss Joint Fabrication _____Sample & Test Components _____Inspection of Glu Lam Fabrication _____SMOKE CONTROL: _____SPECIAL CASES: SPECIAL INSPECTION: _____Seismic Resistance _____Wind Requirements -4- Coldstream Condominiums X X David Young, HP Geotech