Loading...
HomeMy WebLinkAboutBegin_Workflow-04-06-2015_08-38-38.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A000.pdf mhaeberle B001 IRC would not apply Yes | No No 1 Building E201.pdf mhaeberle B001 Detail methods for penetration of Floor ceiling assemblies Yes | No No 1 Building E201.pdf mhaeberle B002 Provide electrical load calculations Yes | No No 1 Building E201.pdf mhaeberle B003 Annotate co/smoke detection as required byIBC/IFC Yes | No No 1 Building A201.pdf mhaeberle B001 Provide data/ specifcations that the exisiting flue is compatible wtih new fireplace Yes | No No 1 Building A201.pdf mhaeberle B002 Annotate on plans verfication required that the existing flue /shaft is in compliance with the IBC and IMC. Verfication shall be required prior to inspection Yes | No No 1 Building A201.pdf mhaeberle B003 Specify that the fireplace shall be a certified fuel burning fireplace complying with section 5­3­3 of the town code Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES Complete Review  Request Additional Group  Save & Close   Building Process V1 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Planning Chief of Planning Chief of Building Fire