HomeMy WebLinkAboutBegin_Workflow-04-06-2015_08-38-38.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A000.pdf mhaeberle B001 IRC would not apply
Yes | No No 1 Building E201.pdf mhaeberle B001 Detail methods for penetration of Floor ceiling
assemblies
Yes | No No 1 Building E201.pdf mhaeberle B002 Provide electrical load calculations
Yes | No No 1 Building E201.pdf mhaeberle B003 Annotate co/smoke detection as required
byIBC/IFC
Yes | No No 1 Building A201.pdf mhaeberle B001 Provide data/ specifcations that the exisiting flue is
compatible wtih new fireplace
Yes | No No 1 Building A201.pdf mhaeberle B002
Annotate on plans verfication required that the
existing flue /shaft is in compliance with the IBC
and IMC. Verfication shall be required prior to
inspection
Yes | No No 1 Building A201.pdf mhaeberle B003
Specify that the fireplace shall be a certified fuel
burning fireplace complying with section 533 of the
town code
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
Complete Review Request Additional Group Save & Close
Building Process V1
1 BUILDING
MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
Corrections Required
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Requested Groups
0 Groups Selected Remove all Add all
Planning
Chief of Planning
Chief of Building
Fire