Loading...
HomeMy WebLinkAboutBegin_Workflow-04-06-2015_08-51-58.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Warren Krok ( warren@nedbo.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A000.pdf mhaeberle B001 IRC would not apply Yes | No No 1 Building E201.pdf mhaeberle B001 Detail methods for penetration of Floor ceiling assemblies Yes | No No 1 Building E201.pdf mhaeberle B002 Provide electrical load calculations Yes | No No 1 Building E201.pdf mhaeberle B003 Annotate co/smoke detection as required byIBC/IFC Yes | No No 1 Building A201.pdf mhaeberle B001 Provide data/ specifcations that the exisiting flue is compatible wtih new fireplace Yes | No No 1 Building A201.pdf mhaeberle B002 Annotate on plans verfication required that the existing flue /shaft is in compliance with the IBC and IMC. Verfication shall be required prior to inspection Yes | No No 1 Building A201.pdf mhaeberle B003 Specify that the fireplace shall be a certified fuel burning fireplace complying with section 5­3­3 of the town code DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES Complete  Save And Close   Building Process V1 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions