Loading...
HomeMy WebLinkAboutBegin_Workflow-04-06-2015_15-57-02.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / DepartmentReview  Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable  comments and status. Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Building A2.1.pdf mhaeberle B001 Provide occupancy classification and construction type Yes | No No 1 Building A2.1.pdf mhaeberle B002 Provide electrical load calculations per Town of Vail submittal requirements Yes | No No 1 Building A2.1.pdf mhaeberle B001 Plans do not reflect scope of work on application ie mechanical plans Yes | No No 1 Building A2.1.pdf mhaeberle B004 Provide wall details showing compliance for the construction type Yes | No No 1 Building A2.1.pdf mhaeberle Changemarks note #05 Is this exterior? If so a DRB approval is required and must be obtained prior to resubmittal Yes | No No 1 Building A2.1.pdf mhaeberle B005 Provide structural details for this infill to include anchorage, insulation. and weatherproofing if exterior Yes | No No 1 Building A2.1.pdf mhaeberle B006 It appears plumbing, mechnical, and electrical penetrating fire rated assembliesy? If so provide details for firestopping and repair of fire rated assembly Yes | No No 1 Building B15­ 0082.pdf mhaeberle B001 Please clarify Yes | No No 1 Building B15­ 0082.pdf mhaeberle B002 Please clarify Complete Review  Request Additional Group  Save & Close   Building Process V1 Show My Changemarks DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 BUILDING MARTIN HAEBERLE  MHAEBERLE@VAILGOV.COM Corrections Required VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE Requested Groups 0 Groups Selected Remove all Add all Planning Chief of Planning Chief of Building Fire