Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 1
Workflow/Activity Name Begin_Workflow / ApplicantResubmit
Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required
information prior to completion of task.
Current User Logon Dave Korbel ( davekorbel@gmail.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A2.1.pdf mhaeberle B001 Provide occupancy classification and construction
type
Yes | No No 1 Building A2.1.pdf mhaeberle B002 Provide electrical load calculations per Town of Vail
submittal requirements
Yes | No No 1 Building A2.1.pdf mhaeberle B001 Plans do not reflect scope of work on application ie
mechanical plans
Yes | No No 1 Building A2.1.pdf mhaeberle B004 Provide wall details showing compliance for the
construction type
Yes | No No 1 Building A2.1.pdf mhaeberle Changemarks
note #05
Is this exterior? If so a DRB approval is required and
must be obtained prior to resubmittal
Yes | No No 1 Building A2.1.pdf mhaeberle B005
Provide structural details for this infill to include
anchorage, insulation. and weatherproofing if
exterior
Yes | No No 1 Building A2.1.pdf mhaeberle B006
It appears plumbing, mechnical, and electrical
penetrating fire rated assembliesy? If so provide
details for firestopping and repair of fire rated
assembly
Yes | No No 1 Building B15
0082.pdf mhaeberle B001 Please clarify
Yes | No No 1 Building B15
0082.pdf mhaeberle B002 Please clarify
Complete Save And Close
Building Process V1
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
CORRECTIONS REQUIRED
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be
indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup
window.
I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review.
I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as
the original files. I am ready to complete my assigned task.
Task Instructions