HomeMy WebLinkAboutBegin_Workflow-04-29-2015_13-57-51.pdfClick Here to Save Eform as PDF...
Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip
Review Coordinator Carolyn Godfrey ( cgodfrey@vailgov.com )
Review Cycle 2
Workflow/Activity Name Begin_Workflow / DepartmentReview
Activity InstructionsUpon acceptance of task, please review the required drawings and provide any applicable
comments and status.
Current User Logon Martin Haeberle ( mhaeberle@vailgov.com)
CHANGEMARKS Review Cycle:1
Filter Changemarks by Keyword: SEARCH SHOW ALL
Click Here to Load Changemarks...
Click Here to Publish Changemarks to PDF...
Sorting:
Resolved Status File Cycle Department File Markup Description Details Applicant Response
Yes | No No 1 Building A2.1.pdf mhaeberle B001 Provide occupancy classification and construction
type
Residential Group R2
IOS Class 1b
IBC type vb
Wood Framing
Block Exterior
Yes | No No 1 Building A2.1.pdf mhaeberle B002 Provide electrical load calculations per Town of Vail
submittal requirements
2475.00 total calculations
10000.00 fist10kva of
general load at 100%
5890.00 at 40%
15890.00 total demand
Yes | No No 1 Building A2.1.pdf mhaeberle B001 Plans do not reflect scope of work on application ie
mechanical plans
$400.00 for fans put in
plumbing
Yes | No No 1 Building A2.1.pdf mhaeberle B004 Provide wall details showing compliance for the
construction type
2x6 framing insulated, dry
wall both sides
Yes | No No 1 Building A2.1.pdf mhaeberle Changemarks
note #05
Is this exterior? If so a DRB approval is required and
must be obtained prior to resubmittal
Interior wall
door goes to a interior
hallway
Yes | No No 1 Building A2.1.pdf mhaeberle B005
Provide structural details for this infill to include
anchorage, insulation. and weatherproofing if
exterior
Interior wall, bolted to
concrete insulated
Yes | No No 1 Building A2.1.pdf mhaeberle B006
It appears plumbing, mechnical, and electrical
penetrating fire rated assembliesy? If so provide
details for firestopping and repair of fire rated
assembly
All penetrating in floor filled
with concrete. Other
penetrating fire stop
insulation
Yes | No No 1 Building B15
0082.pdf mhaeberle B001 Please clarify
This is not a commercial
building
Multifamily
Yes | No No 1 Building B15
0082.pdf mhaeberle B002 Please clarify
$400 for fan mechanical
Complete Review Request Additional Group Save & Close
Building Process V1
Show My Changemarks
DEPARTMENT REVIEW Review Cycle:1
CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES
1 BUILDING MARTIN HAEBERLE
MHAEBERLE@VAILGOV.COM
Corrections Required
VIEW CHECKLIST
PLAN REVIEW AND/OR ASSIGNMENT COMPLETE
Requested Groups
0 Groups Selected Remove all Add all
Planning
Chief of Planning
Chief of Building
Fire