HomeMy WebLinkAboutA1.1.pdfRevised
May 7, 2015 cg add Front Door Note
March 2015 cg Bathroom Upgrade
Original Drwg Feb 27,1996
Montaneros Condos
Unit 414
1 bedroom + loft
2 bathrooms
WINDOWSMaxine & Chick Gleicher
Vail414 Main 5-7-2015.skf cg
MAIN LEVEL
STAIRWAY
Replace Existing
Entry Door With
New
Add 2 Sconces
60" 72"
506"
144"
130"
212"
New Cans in Bathroom
Remove Partician Wall & Door
New Fan
Replace Existing Can Lights with New
Add Can Lights
Existing Kitchen
to Remain
Bath New Finishes
Replace Existing Tile Finish at Tub.
Maintain Fire Rating at Party Wall
Replace Existing Electric Base Board Heat
Throughout
Replace Existing Electrical Devives
Throughout
NOTE:
Front Door Opens to Open Space
u-Value on New Front Door - .23
FIREPLACE
SHOWER
MASTER
BEDROOM
KITCHEN
BATHROOM
ENTRANCE
Construction type:IIIB
Occupancy: R-2
05/19/15
6/9/15: REMOVE
EXISTING STAIR
WALL, REPLACE
WITH
BALUSTERS &
HANDRAIL
Minimum
36" height
and leass
than 4'
opening
06/18/15