Loading...
HomeMy WebLinkAboutA1.1.pdfRevised May 7, 2015 cg add Front Door Note March 2015 cg Bathroom Upgrade Original Drwg Feb 27,1996 Montaneros Condos Unit 414 1 bedroom + loft 2 bathrooms WINDOWSMaxine & Chick Gleicher Vail414 Main 5-7-2015.skf cg MAIN LEVEL STAIRWAY Replace Existing Entry Door With New Add 2 Sconces 60" 72" 506" 144" 130" 212" New Cans in Bathroom Remove Partician Wall & Door New Fan Replace Existing Can Lights with New Add Can Lights Existing Kitchen to Remain Bath New Finishes Replace Existing Tile Finish at Tub. Maintain Fire Rating at Party Wall Replace Existing Electric Base Board Heat Throughout Replace Existing Electrical Devives Throughout NOTE: Front Door Opens to Open Space u-Value on New Front Door - .23 FIREPLACE SHOWER MASTER BEDROOM KITCHEN BATHROOM ENTRANCE Construction type:IIIB Occupancy: R-2 05/19/15 6/9/15: REMOVE EXISTING STAIR WALL, REPLACE WITH BALUSTERS & HANDRAIL Minimum 36" height and leass than 4' opening 06/18/15