Loading...
HomeMy WebLinkAbout631 A2.0.pdfPROPOSED SCOPE OF WORK A DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. NOTIFY THE ARCHITECT IMMEDIATELY WHEN DISCREPANCIES ARE DISCOVERED PRIOR TO PROCEEDING WITH THE CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE PLUMBING &ELECTRICAL SUBCONTRACTORS TO REVIEW ALL OF THE DRAWINGS, INCLUDING ARCHITECTURAL, FOR WORK UNDER THEIR RESPECTIVE CONTRACTS. ROOF PLANS AND REFLECTED CEILING PLANS DESCRIBE MECHANICAL AND ELECTRICAL WORK AS DO OTHER DRAWINGS. NO EXTRAS WILL BE ALLOWED FOR WORK SHOWN IN ANY PART OF THESE DRAWINGS, OR DESCRIBED IN ANY PART OF THE SPECIFICATIONS. SEE DRAWING A2.0 FOR WALL TYPE ( ) CONSTRUCTION & INSULATION INFORMATION. THE CONTRACTOR SHALL COORDINATE ALL ITEMS PROVIDED AND/OR INSTALLED BY THE OWNER DURING CONSTRUCTION. ALL FLOOR PLAN DIMENSIONS ARE MEASURED AS INDICATED BELOW OR UNLESS OTHERWISE NOTED. WHERE DIMENSION IS ARE NOTED AS 'CLEAR', DIMENSION IS TO FINAL FINISH. ALL INDICATED ANGLES ARE 45 DEGREES AND 90 DEGREES, U.N.O. ALL REFERENCED ELEVATION HEIGHTS ARE FROM DATUM ELEVATION 0'-0". SEE SITE PLAN FOR ACTUAL GRADE ELEVATIONS. PROVIDE SOLID BLOCKING FOR ALL WALL-MOUNTED FIXTURES & EQUIPMENT, INCLUDING, BUT NOT LIMITED TO, SINKS (HAND SINKS, SERVICE SINKS, WORK SINKS, ETC.), WALL BRACKETS, SHELVING, ACCESSORIES, HARDWARE AND ANY WALL-HUNG CABINETS OR ITEMS, REGARDLESS OF LOCATION OR ROOM. THIS INCLUDES ALL OWNER-PROVIDED EQUIPMENT THROUGHOUT THE PROJECT. THE CONTRACTOR TO COORDINATE WITH OWNER PRIOR TO INSTALLATION OF GYPSUM WALL BOARD. A. B. C. D. E. F. G. H. 1. FACE OF CMU OR CONCRETE. 2. FACE OF INT. WALL FINISH 3. FACE OF FOUNDATIONS. 4. CENTERLINE OF COLUMNS. FLOOR PLAN GENERAL NOTES BLOCKING NOTES: 1. BLOCKING CONDITIONS SHOWN DO NOT ACCOUNT FOR ALL CONDITIONS THAT MAY EXIST ON THE PROJECT. THE CONTRACTOR IS TO ACCOUNT FOR ALL BLOCKING INDICATED IN ENTIRE CONTRACT DOCUMENT PACKAGE OR SPECIFICALLY REQUIRED BY THE MANUFACTURERS OF SPECIFIED PRODUCTS AND MATERIALS. 2. THE CONTRACTOR SHALL WALK THE SITE TO FINALIZE ALL LOCATIONS OF BLOCKING IN WALLS / CEILING PRIOR TO INSTALLATION OF GYPSUM WALLBOARD. 3. COORDINATE THE EXACT REQUIRED LINEAR FOOTAGE AND LOCATIONS OF BLOCKING WITH EACH SPECIFIC FIXTURE, ACCESSORY, EQUIPMENT, CASEWORK, AND MILLWORK. THE CONTRACTOR IS TO COORDINATE WITH MILLWORK ON ALL ITEMS TO BE SUPPLIED AND / OR INSTALLED BY SAFEWAY. 4. WHERE EXACT LOCATION OF ITEM REQUIRING BLOCKING WILL NOT BE DETERMINED UNTIL AFTER INSTALLATION OF THE GYPSUM WALLBOARD, EXTEND BLOCKING A MIN. OF 12" BEYOND EACH SIDE THE ESTIMATED LOCATION OF THE DESIGNATED ITEM AS INDICATED IN THE PLANS OR AS SPECIFIED BY MANUFACTURER. 5. ALL BLOCKING IS TO BE CONTINUOUS ALONG THE FULL LENGTH OF THE ITEM REQUIRING BLOCKING UNLESS NOTED OTHERWISE OR INDICATED BY MANUFACTURER. 6. WHERE SPECIFIC CODE RELATED OR MANUFACTURER LOAD REQUIREMENTS ARE REQUIRED, THE CONTRACTOR IS TO CONFIRM THE INSTALLATION OF THE REQUIRED BLOCKING MEETS OR EXCEEDS THE REQUIREMENTS OF THE CODE. COUNTER HEIGHT VERIFY W/ MILLWORK AT LOCATIONS WHERE VERTICAL SHELVING SUPPORTS / BRACKETS ARE USED. PROVIDE CONT. BLOCKING / BACKING BETWEEN STUD FRAMING ALONG ENTIRE LENGTH OF VERT. BRACKETS 2'-10" V.I.F. ACCESSORY HEIGHT VERIFY W/ SAFEWAY PM BLOCKING AT COUNTER & WALL SHELVING BLOCKING AT COMPARTMENT SINKS BLOCKING AT ACCESSORIES SHELVING HEIGHT VERIFY W/ MILLWORK TYPICAL BLOCKING DETAILS 08 THE TOP OF THE FLOOR DRAINS SHALL BE 1/8" ABOVE THE CONCRETE SLAB IN ALL AREAS RECEIVING FLOOR COVERINGS. J. THE PROPOSED PROJECT SCOPE, AS DETAILED WITHIN THESE CONSTRUCTION DOCUMENTS, SHALL ENCOMPASS ALL WORK REQUIRED TO EXPAND THE EXISTING PRODUCE PREPARATION AREA TO INCLUDE ADDITIONAL WORK SURFACES AND 3-COMPARTMENT SINK AS NEEDED TO CUT AND PACKAGE FRESH FRUIT. EXISTING PRODUCE PREPARATION AREA IS LOCATED WITHIN THE STOCKROOM. THE PROPOSED EXPANSION AREA SHALL HAVE FINISHES THAT MATCH THE PRE-EXISTING PRODUCE PREPARATION AREA; INCLUDING, BUT NOT LIMITED TO: FRP WALL SURFACES, VINYL-FACED CEILING GRID, SEMI-GLOSS PAINT, AND OTHER CLEANABLE SURFACES. ALL PROPOSED FIXTURES, EQUIPMENT, FINISHES, AND PROCEDURES SHALL BE IN ACCORDANCE TO CURRENT SAFEWAY PROTOTYPICAL STANDARDS IN REFERENCE TO THIS 'FRESH CUT FRUIT' ROLLOUT. BUILDING AREA TO REMAIN UNCHANGED. THE FOLLOWING EQUIPMENT SHALL BE FURNISHED BY SAFEWAY, INSTALLED BY CONTRACTOR: - 3 COMP SINK, STAINLESS WORK TABLES - WALL MOUNTED BUG ZAPPERS - METAL WALL MOUNTED SHELVES - 30 GALLON TRASH - TOWEL AND SOAP DISPENSERS ARE FURNISHED BY SAFEWAY IF NOT ALREADY IN PLACE AT THE EXISTING HAND SINK. EQUIPMENT FURNISHED AND INSTALLED BY CONTRACTOR: - PLASTIC STRIP CURTAIN - BOLLARDS HOURS OF CONSTRUCTION FOR THE CUT FRUIT PROJECTS WILL BE ALL NIGHT-TIME WORK. EACH CONTRACTOR WILL BE RESPONSIBLE TO COORDINATE THE NIGHT-TIME WORK WITH THE STORE MANAGERS NEEDS FOR HAVING EMPLOYEES WORKING WITHIN THE PRODUCE BACKROOM PRODUCTION AREA. PRODUCE EMPLOYEE'S TYPICALLY WILL BE WORKING DURING A 6AM TO 9PM PERIOD ON EACH DAY OF THE WEEK. ANY ADJUSTMENTS TO THE CONTRACTORS WORKING HOURS MUST BE APPROVED BY STORE MANAGER AND SAFEWAY'S PROJECT MANAGER. (E) FIXTURING TO REMAIN - PROTECT AS REQ'D DURING CONSTRUCTION. NEW WALL MOUNTED WIRE RACK STORAGE SHELVING ABOVE NEW 3-COMPARTMENT SINK. NEW SCALE/PRINTER - SAFEWAY FURNISHED, G.C. INSTALLED - PROVIDE POWER AND DATA. NEW TABLE TOP WRAPPER - SAFEWAY FURNISHED, G.C. INSTALLED - PROVIDE POWER FOR HEAT SEALER. CLEAN/PATCH/REPAIR (E) WALLS AND WALL FINISHES AS REQUIRED FOR 'LIKE-NEW' APPEARANCE. RELOCATE OUTLETS TO SERVE PROPOSED SCALE/PRINTER AND TABLE TOP WRAPPER - ADD NEW OUTLETS AS NEEDED - ALL OUTLETS TO BE LOCATED 45" A.F.F. - REUSE EXISTING CIRCUITS - G.C. TO INSTALL WATERPROOF COVERS AT ALL OUTLET LOCATIONS. REMOVE NON-FRP (E) WALL FINISHES AND REPAIR (E) SUBSTRATE AS REQ'D FOR NEW FRP WITHIN PREP AREA - FRP TO MATCH EXISTING. EXISTING CONCRETE SLAB ON GRADE - CLEAR SEAL IN PREP AREA - EPOXY COVE BASE AT ALL WALLS WITHIN PREP AREA. NEW STAINLESS STEEL TABLES, NO WALL SHELVING ABOVE TABLES. NEW 3-COMPARTMENT SINK W/ ECOLAB SANITIZING WASH DOWN - RE: PLUMBING DRAWINGS - NEW SINK SHALL DRAIN TO EXISTING NEARBY FLOOR SINK OR A NEW FLOOR SINK SHALL BE INSTALLED. EXISTING STERILOX TO REMAIN - ENSURE PROPER WORKING ORDER. PROPOSED CONSTRUCTION NOTES 1" MINIMUM AIR GAP = 2x DIA. DIA. DRAIN LINE TO DISCHARGE INDIRECTLY PIPE PENETRATIONS IN CABINETRY TO BE SEALED WITH FLEXIBLE SEALER MOUNT FIXTURE FLUSH WITH FINISHED FLOOR FLOOR GRATE FINISHED FLOOR FLOOR SLAB SANITARY FLOOR SINK FLUSH WITH FINISHED FLOOR I-BEAM OR JOISTS ANCHOR - PER NFPA 3/8" ALL-THREAD ROD FOR <=4" PIPE. FOR LARGER PIPE SIZES SEE NFPA 13. HANGER - GRINNEL FIG. 69 ON INSULATED PIPE. PROVIDE PIPE SUPPORT SHIELD. FLOOR DRAIN SANITARY SYSTEM MIN. SIZE VENT FINISHED FLOOR FLOOR SLAB FLASHING KITCHEN FLOOR DRAIN FLUSH WITH FINISHED FLOOR NEW 4" PIPE BOLLARD AT 3' O.C. IN FRONT OF STRIP CURTAINS NEAR PROPOSED FIXTURES AND AT ANY NEW WALL CORNERS. FLY ZAPPER TO BE LOCATED/RELOCATED AWAY FROM ALL WORK SURFACES AND SINKS - IF DAMAGED OR BROKEN, REPLACE UNIT - CONNECT TO EXISTING OUTLET - SAFEWAY FURNISHED, G.C. INSTALLED. EXISTING CEILING TO REMAIN - CLEAN/REPAIR EXISTING CEILING AS REQUIRED FOR 'LIKE-NEW' APPEARANCE - IF CEILING EXISTS, A NEW DROP CEILING SHALL BE INSTALLED TO CONTAIN THE PRODUCE WORK AREA - CEILING SURFACE SHALL HAVE FRP TO MATCH OR OTHER CLEANABLE SURFACE FINISH. GC TO VERIFY THAT EXISTING LIGHT FIXTURES HAVE PROPER LENS DIFFUSER COVERS - LENS DIFFUSERS SHALL BE PROVIDED IF NOT. EXISTING FIRE SPRINKLER HEADS TO REMAIN. NEW PLASTIC STRIP CURTAIN TO BE INSTALLED PER G.C. INSTRUCTIONS - RE: MANUFACTURER'S INSTRUCTIONS. FLOOR SINK DETAIL 07 FLOOR DRAIN DETAIL 05 PIPE HANGER DETAIL 03 1 1/2" R2" 4" 4'-0" 6" 8" 8" 6" DROP IN CONCRETE ANCHOR FOR 5/8" UNC BOLTS 4 BOLT HOLES @ 5/8" Ø EACH 5/8" UNC BUTTON HEAD BOLT 5/8" WASHER 1/2" DROP IN CONCRETE ANCHOR FOR 5/8" UNC BOLTS 4 BOLT HOLES @ 5/8" Ø EACH 5/8" WASHER Ø3/4" R3/8" DETAIL B (E) SLAB ON GRADE 5/8" UNC BUTTON HEAD BOLT TYP. BOLLARD DETAIL 06 1/2" : 1'-0" 4" DIA. STANDARD STEEL PIPE BOLLARD PAINT (2) COATS YELLOW, (UNLESS NOTED OTHERWISE) ROUNDED CAP DET. B PROPOSED FLOOR PLAN 01 1/4" : 1'-0" PROPOSED CEILING PLAN 02 1/4" : 1'-0" NEW 3-COMP. SINK - SINK TO DRAIN INDIRECTLY TO EXISTING SHARED F.S. NEW PLASTIC STRIP CURTAIN TO BE MOUNTED PER MANUFACTURER'S RECOMMENDATIONS IN ACCORDANCE WITH FIELD CONDITIONS E E E E E E E E E N N N N 9'-5" 12'-2" 21'-7" 2'-9" 2'-5" 2'-5" 3'-0" 3'-0" 10'-10" 6'-9" RELOCATED HAND SINK AND ASSOCIATED UTILITIES RELOCATED PRODUCE SINK AND ASSOCIATED UTILITIES NEW COOLER DOUBLE DOOR - INSULATED (HUSSMAN OR EQUAL) T:\DG\Safeway - Denver Division\Fresh Cut Fruit Roll-out\C5-075 - Safeway Store #0631 (Vail, CO)\04 Architectural\Current CD's\C5-075 - Safeway #0631 - A2.0 - Layout.dwg Jun 10, 2015 - 7:01am tkinde PROPOSED PLAN AND DETAILS A2.0 SHEET NO. SHEET TITLE C5-075 CHECKED BY: DRAWN BY: PROJECT NO. BUILDING DEPT: O.T.B.: OWNER: STAMP REVISIONS TM 05/26/2015 SUBMITTAL DATES SAFEWAY STORE #0631 VAIL, CO 2131 NORTH FRONTAGE ROAD ACTIVITY NO: #05-0631-000-0017 OWNER REVISIONS (ADDENDUM 1) 06/03/2015 01 06.09.2015 OWNER REVISIONS (ADDENDUM 1) 06/09/2015 02 01 02 02 02 STAMP 07/31/15