Loading...
HomeMy WebLinkAboutB15-0243 Test & Balance.pdfJPG ENGINEER/NG. INC. 1833 MTN. VIEW RD .. SEDALIA CO (303) 688-9044 GENERAL INFORMATION PROJECT LOCATION ELEVATION ARCHITECT MECH. ENG. CONTRACTOR BAL.CREW DATE VAIL VALLEY MEDICAL CENTER 2ND FLOOR ICU VAIL, COLORADO 8,150' HEERY DESIGN CATOR, RUMA, AND ASSOCIATES MTECHGROUP CHRIS CONNER NOVEMBER 2015 JPG JOB# INSTRUMENTS USED CALIBRATION DATE: Feb 06, 2015 AMPMETERNOL TMETER ANEMOMETER PRESSURE GAGE-DIFFER SPEED INDICATOR VELOMETER METHOD OF BALANCE Fluke 324 Davis A/2 Ball Brg. FLO-DESIGN 12C1386 0-300" Biddle 9920 Shortridge ADM-870 4152637 JPG-17 JPG-1 786293 M98083 Supply Diffusers are read with a capture hood using a Shortridge Air Data Meter. Exhaust and return inlet registers read with Shortridge Air Data Meter and Flow Hood. DOC Velocity sensors on VAV and FPB boxes are calibrated to actual flow measured with Air Data Meter. Heating and Chilled water flow rates are measured with a differential pressure meter on the installed flowelemen Item TABLE OF CONTENTS Sheet Number Cover Page .................................................................................................................................................. 1 Table of Contents ........................................................................................................................................ 2 VAV Recap -AHU I SUPPLY ................................................................................................................... 3 Air Balance -AHU I VA V-201 .................................................................................................................. 4 Air Balance -AHU IV A V-202 .................................................................................................................. 4 Air Balance -AHU I RETURN .................................................................................................................. 4 Air Balance -BF I EXHAUST .................................................................................................................... 5 Water Balance -HOT WATER I HBATIN"G ............................................................................................. 6 Page 2 of 6 VAV RECAP SHEET PROJECT VAIL VALLEY MEDICAL CENTER 2ND FLOOR ICU SYSTEM: AHU BOX# ADD# MAX MIN HEAT SIZE SUPPLY VAV-201 380 380 380 8" VAV-202 230 230 230 8" TOTAL 610 610 610 MULT REMARKS 1.99 2.01 Page 3 of 6 rpe. J iNGINEERING AIR BALANCE DATA PROJECT VAIL VALLEY MEDICAL CENTER 2ND FLOOR ICU SYSTEM AHU LOCATION SIZE REQUIRED FINAL MINIMUM HEATING OPENING PLAN I ACTUAL AREA VEL CFM VEL CFM VEL CFM VEL CFM VAV·201 1 24/12 I 24/12 1.0 380 380 392 392 TOTAL 380 392 REMARKS: VAV DAMPER WIDE OPEN. VAV-202 1 I 24/12 I 24/12 1.0 230 230 233 233 TOTAL 230 233 RETURN R-1 24/8 24/8 1.0 300 300 69 69 R-2 12/8 12/8 1.0 150 150 70 70 TOTAL 450 139 REMARKS: BOTH DAMPERS ARE WIDE OPEN. AHU OPERATING UNDER NORMAL BUILDING CONDITIONS. Page 4 of 6 !~ING AIR BALANCE DATA PROJECT VAIL VALLEY MEDICAL CENTER 2ND FLOOR ICU SYSTEM EF LOCATION SIZE REQUIRED FINAL MINIMUM HEATING OPENING PLAN ACTUAL AREA VEL CFM VEL CFM VEL CFM VEL CFM EXHAUST 1 6X6 6X6 1.0 80 80 89 89 2 6X6 6X6 1.0 80 80 82 82 TOTAL 160 171 Page 5 of 6 Jl~ING WATER BALANCE DATA PROJECT VAIL VALLEY MEDICAL CENTER 2ND FLOOR ICU SYSTEM HOT WATER LOCATION FLOW REQDRATING FINAL TEST1 TEST2 STATION SIZE EWT LWT EAT LAT SETTINGS METER PD GPM PD GPM PD % PD % HEATING VAV-201 FLOW 75(2) 47" 0.60 51" 0.63 --DESIGN VAV-202 FLOW 75(2) 47" 0.60 43" 0.57 --DESIGN FTR-201 FLOW 75(2) 47" 0.60 44" 0.58 - -DESIGN FTR-201 FLOW 75(2) 47" 0.60 49" 0.61 --DESIGN TOTAL 2.4 2.39 Page 6 of 6