Loading...
HomeMy WebLinkAbout01-VGC Drainage Report 8-21-15.pdf ii A. INTRODUCTION……………………………………………………………………….1 B. METHODOLOGY………………………………………………………………………1 C. EXISTING HYDROLOGY……………………………………………………………..2 D. PROPOSED HYDROLOGY……………………………………………………………3 E. HYDROLOGICAL ANALYSIS AND CONCLUSION……………………………….3 APPENDICIES APPENDIX A – FIGURES AND TABLES APPENDIX B – HYDROLOGIC COMPUTATIONS AND SYSTEM ANALYSIS APPENDIX C – STORM WATER QUALITY INFORMATION APPENDIX D – REFERENCED SUPPORTING DOCUMENTS 1 A. INTRODUCTION This Drainage Report has been prepared for the Town of Vail to evaluate the proposed hydrology for the “Vail Golf and Nordic Clubhouse Remodel” (“project site”) located in Vail, Colorado as shown on Appendix A Figure 1. The site address is 1775 Sunburst Drive, located in SUNBURST FILING 3 LOT: 3 and VAIL VILLAGE FILING 8 TRACT: A and B. The intent of this report is to evaluate the anticipated post-development discharge rates from only the “project site” remodel improvements which are depicted on the 100% Construction Plans dated 7/31/15. The 10, 25 and 100-year rainfall storm events, along with anticipated snowmelt run-offs will be evaluated to determine if the proposed stormwater system and grass drainage swale can safely accommodate these anticipated runoff rates, without causing damage to the surrounding infrastructure according to the Town of Vail Code. The scope of this report was limited to only analyze the drainage alternations for the “project site” improvements shown on Figure 1 in Appendix A, since we feel there are only minor alterations from the existing and proposed site configurations for the proposed remodel project. It is understood that the proposed improvements are altering the “project site” minor drainage basin patterns, but ultimately the overall major drainage basin’s runoff should be similar. It will be assumed that all other existing runoff within the golf course and neighboring properties will follow historical patterns and will not be evaluated in this report due to the drainage study scope limitations. Limited off-site drainage information was provided from the “Golf Course Roads Project Drainage Report for Town of Vail” dated January 1995 prepared by SGM, Inc., and visual site observations. See Appendix D for report. B. METHODOLOGY Due to the urban nature and the small size of the individual sub-basins within the “project site” study area, it was determined that the rainfall run-off would be analyzed using the Rational Method on the provided Excel spreadsheets based upon the Urban Storm Discharge Criteria Manual. Modifications as recommended in the Urban Storm Discharge Criteria Manual published by the Urban Drainage and Flood Control District, Denver, Colorado in June 2001 have also been adopted. The stormwater infrastructure and ditch hydrological capacities were analyzed using the Hydraflow Express Extension for Autodesk AutoCAD Civil 3D software. Hydrologic soil group information was based upon the previous soils report information and from the Natural Resource Conservation Service (NRCS), which the soil classification is assumed to be Hydraulic Type-B. Storm data information was based from the Town of Vail Code, Chapter 10, Section K. Curve number information obtained from the NRCS TR-55 Method was used to compute composite curve numbers based on soil type and percentage of areas within the sub-basins. Runoff coefficients used for calculations can be found in Appendix A Tables 1 & 2. 2 C. EXISTING HYDROLOGY Drainage from the Southerly Mountainside and Off-Site Basin Area The off-site drainage from the mountainside south of the “project site” has historically flooded the southwesterly parking lot and the original 18th hole area for this site. The worst of this flooding has historically occurred during the spring snowmelt runoff. This runoff comes down from the southerly mountainside, converges in a roadside ditch, and then crosses underneath Sunburst Drive in three 18” CMP culverts. The runoff is directed towards the golf course property down a large landscaped swale, running between Lot 4 and Lot 5 southeast of the “project site”. It is understood that most of this runoff is then diverted and conveyed by the golf course service gravel road towards the southwesterly portion of the parking lot and original 18th hole area. Based upon the “Golf Course Roads Project Drainage Report for Town of Vail” dated January 1995 prepared by SGM, Inc., potential 10, 25, and 100-year storm events and snowmelt from the southerly mountainside basin were calculated at approximately 18 c.f.s., 27 c.f.s. and 64 c.f.s. respectively. See Appendix D for report. Drainage from the Project Clubhouse and Parking Lot Area The majority of the existing parking lot and surrounding basin area runoff drains towards the 2’x3’ inlet near the clubhouse building. This runoff then enters into the stormwater system, which it is understood that it eventually discharges to a drywell manhole near the driving range area. There was no formal drainage study information available at this time for the golf course clubhouse and parking lot area. Potential 25-year storm event runoff estimates for this parking lot basin area based upon the Rational Method formula is estimated and shown below. Rainfall Runoff: Q=CiA Where: Qr= Peak Runoff (c.f.s.) C= Runoff coefficient i= Avg. rainfall intensity for a duration equal to time of concentration (in/hr) A= Watershed drainage area (ac.) Q= (1.008 c.f.s/in-hr-ac.)(0.89)(6.44 in/hr)(1.386 ac.) Q= 8.01c.f.s. Snomelt Runoff: Q = 0.067 c.f.s./ac. (1.386 ac.) = 0.093 c.f.s. Q(total) = 8.103 c.f.s. 3 D. PROPOSED HYDROLOGY Drainage from the Southerly Mountainside and Off-Site Basin Area The “project site” improvements are intended to capture and divert the potential off-site runoff and 18th hole area and convey it around the easterly side of the golf course clubhouse. The off-site runoff from the southerly mountainside is proposed to drain across the gravel access road at a 30’ wide concrete valley pan, which is intended to direct a majority of the runoff towards the proposed grass ditch system. The runoff is proposed to be conveyed thru a 4.0’ flat bottom (5:1 side slopes) grass ditch system, with twin 24” ADS-HP-Storm HDPE F.E.S. culverts at the path crossings, eventually discharging to Gore Creek. Drainage from the Project Parking Lot and Clubhouse Area The parking lot and golf course clubhouse building area basin runoffs are proposed to be collected into a storm sewer system and conveyed across the driving range, where is will be eventually discharged into the northerly detention pond, as indicated on Figure-2 in Appendix A. The storm sewer system will be comprised of a 3.0’ concrete valley pan, 2’x3’ inlet storm manholes, roof downspout system, a Contech CDS3035-6-C Water Quality Manhole (runoff treatment), and 18” diameter ADS-HP- Storm HDPE pipes. The site parking lot area will be re-graded to allow for the runoff in Basin 1 to drain towards the center of the parking lot. It will then flow down the proposed 3.0’ concrete valley pan, ranging from 0.9%-3.0%, and be collected into a 2’x3’ CDOT Type-16 valley inlet at the northerly landscaping island, as depicted in Figure-2. Additionally, runoff from Basin 2 will be collected into the proposed mountable curb storm inlet and also act as a safety overflow catchment from Basin 1 during major storm events. Two other storm inlets are provided to collect runoff from the concrete plaza area in front of the clubhouse building shown as Basins 3 & 4 in Figure-2. There is a proposed roof downspout system, minor area drain system, and foundation drain system from the building that collects and conveys into this 18” storm sewer system near the Water Quality Manhole. All the anticipated runoff will pass thru a Contech CDS3035-6-C Water Quality Manhole for treatment and then be conveyed thru the 18” storm pipe system to be discharged into the northerly detention pond. All other anticipated stormwater runoff south, east, and north of the golf course clubhouse building is assumed to drain towards the proposed grass ditch system as shown in Figure-2. E. HYDROLOGICAL ANALYSIS AND CONCLUSION The stormsewer infrastructure and ditch system design was analyzed for 10, 25 and 100-year storm events. Each depicted inlet was assumed to collect 100% of the rainfall and snowmelt runoff. The storm sewer discharges at each design point can be found in Figure-2 of Appendix A. After analyzing the proposed stormsewer infrastructure for the “Vail Golf and Nordic Clubhouse Remodel”, it was determined that the proposed 18” stormsewer drainage system can safely convey the 10 & 25-year runoff events, but there can be possible inlet grate ponding backup and overflow due to inlet grate capacity limitations for Design Point 1-A in the main parking lot area. This overflow in the parking lot area would eventually be collected into the next downstream inlet shown at Design Point 2-A in 4 Figure-2. The 100-year runoff event is anticipated to cause inlet ponding and pipe surcharging. Refer to Appendix B for calculations and pipe capacity. The Contech CDS3035-6-C Water Quality Manhole will only be able to treat minor storm event runoffs up to 3.8 c.f.s., but will be able to handle and by-pass major storm events up to 20 c.f.s. The grass ditch system was analyzed using Autodesk Civil3D 2015 Hydraflow Hydrographs extension software. It is assumed the peak discharge from the lower basin areas within the “project site” will be discharged before the arrival of the peak runoff from the off-site southerly mountainside basin area. Therefore the grass ditch system and two 24” ADS-HP-Storm HDPE F.E.S. crossing culverts will be analyzed using the provided 10, 25, and 100-year storm events and snowmelt of approximately 18 c.f.s., 27 c.f.s. and 64 c.f.s. respectively. The hydrological capacity analysis of the ditch system is shown in Appendix B. 5 REFERENCES References all criteria, storm water data, and technical information used to support the drainage report. 1. Civil Engineering Reference Manual, Michael R. Lindeburg, PE, Professional Publications, Inc., Tenth Edition, 2006 2. Urban Drainage and Flood Control District Drainage Criteria Manual, Volume 1, 2001 http://www.udfcd.org/downloads/down_critmanual_volI.htm 3. Golf Course Roads Project Drainage Report for Town of Vail” dated January 1995 prepared by SGM, Inc. 4. Town of Vail Code, Chapter 10, Section K http://www.sterlingcodifiers.com/codebook/index.php?book_id=560 APPENDIX - A MARCIN ENGINEERING LLCGRAPHIC SCALE(IN FEET)1 inch = 60 ft.1-A MARCIN ENGINEERING, LLC P.O. Box 1062, Avon Colorado 81620 (970) 748-0274 www.marcinengineering.com Table 1 Sub Basin Data Vail Golf and Nordic Clubhouse Remodel SUB-BASIN NO. AREA (sqft) AREA (acres) IMPERV area (sqft) % IMP C25 C50 C100 1 51,495 1.1822 42,775 83.07% 0.70 0.72 0.74 2 5,685 0.1305 4,830 84.96% 0.78 0.77 0.79 3 4,785 0.1098 4,285 89.55% 0.83 0.85 0.86 4 2,055 0.0472 1,655 80.54% 0.86 0.88 0.89 5 5,752 0.1320 5,752 100.00% 0.94 0.95 0.96 6 8,510 0.1954 8,510 100.00% 0.94 0.95 0.96 7 5,735 0.1317 5,735 100.00% 0.94 0.95 0.96 Note: Basin area calculations were based from the proposed site plans. Table 2 Runoff Coefficients, C (from Urban Drainage and Flood Control District Manual) For Type B NRCS Hydrological Soils Only % IMPERVIOUS C25 C50 C100 0 0.25 0.30 0.35 5 0.28 0.33 0.38 10 0.31 0.36 0.40 15 0.33 0.38 0.42 20 0.35 0.40 0.44 25 0.37 0.41 0.46 30 0.39 0.43 0.47 35 0.41 0.44 0.48 40 0.42 0.46 0.50 45 0.44 0.48 0.51 50 0.46 0.49 0.52 55 0.48 0.51 0.54 60 0.51 0.54 0.56 65 0.54 0.57 0.59 70 0.58 0.60 0.62 75 0.62 0.64 0.66 80 0.66 0.68 0.70 85 0.72 0.73 0.75 90 0.78 0.80 0.81 95 0.85 0.87 0.88 100 0.94 0.95 0.96 Note: From UDFCD Vol.1, Ch.5, Pg. RO-11 Section 2.7 MARCIN ENGINEERING, LLC P.O. Box 1062, Avon Colorado 81620 (970) 748-0274 www.marcinengineering.com Table 3 Town of Vail 1-Hour Precipitation Values Return Period (years) 10-Year 25-Year 50-Year 100-Year Rainfall Depth (inches) 1.70 1.90 2.20 2.40 Note: Rainfall depth was from the Town of Vail Code CH13-10-9-6a. Table 4 Precipitation and Snow Melt Rates Vail Golf and Nordic Clubhouse Remodel Frequency (years) Snow Melt (cfs/acre) Total Acres Flow (cfs) 2 0.040 1.60 0.064 5 0.048 1.60 0.077 6 0.060 1.60 0.096 10 0.062 1.60 0.099 25 0.067 1.60 0.107 50 0.072 1.60 0.115 100 0.0800 1.60 0.128 Note: Snowmelt rates are based from the Town of Vail Code CH13-10-9-6a. APPENDIX - B CALCULATED BYSTANDARD FORM SF-3 JOB NODATESTORM DRAINAGE SYSTEM DESIGN PROJECTCHECKED BY(RATIONAL METHOD PROCEDURE) DESIGN STORM1HR PT RAINFALL DEPTH (IN)DESIGN POINTAREA DESIGNAREA (ACRES)CTc (MINUTES)C*AI (IN/HR)Q (CFS)Tc (MINUTES)SUM (C*A)I (IN/HR)Q (CFS)MAX CAPACITY (CFS)Mannings No, nSLOPE (%)PIPE SIZE(IN.)LENGTH(FT)APX. VELOCITY(FPS)Tt (MINUTES)LENGTH (FT)SLOPE (%)CONVEYANCE COEFFAPX. VELOCITY (FPS)Tt (MINUTES)REMARKSOutput to Design Point1-A Basin 1 1.182 0.69 5.00 0.81 5.77 4.7610.18 0.012 0.80 18 37 6.0 0.10Flows thru 18" stormsewer system 2-A2-ABasin 20.1310.785.000.105.770.605.100.915.745.3110.180.0120.8018226.10.06Flows thru 18" stormsewer system3-A3-A Basin 3 0.110 0.83 5.00 0.09 5.77 0.54 5.16 1.00 5.72 5.82 10.22 0.012 0.81 18 51 6.3 0.13Flows thru 18" stormsewer system 4-A4-A Basin 4 0.047 0.86 5.00 0.04 5.77 0.24 5.30 1.04 5.68 6.01 10.22 0.012 0.81 18 43 6.6 0.11Flows thru 18" stormsewer system 5-A4-ABasin 50.1320.945.000.125.770.720.610.0121.006423.10.23Flows thru 18" stormsewer system5-ABasin 6 0.195 0.94 5.00 0.18 5.77 1.071.05 0.012 3.00 6 120 3.1 0.65Assumed to discharge to west drainage swale system 7-ABasin 7 0.132 0.94 5.00 0.12 5.77 0.72Assumed to discharge to landscaping N/A5-ABasins 1-55.411.175.656.688.080.0120.50183966.61.01Approx. Flow at Contech Water Quality MH6-A6-A6.411.175.376.36Approx. Q=6.36 c.f.s. at PondNote: Tc was assumed to be a minimum of 5 mins in accordance with the Urban Drainage and Flood Control District Criteria Manual (UDFCD Vol. 1, Ch. 5, Pg. RO-7, Section 2.4.4)output from AutoCAD Civil 3D SSA ProgramNote: Rainfall Intensity I (IN/HR) was based upon equation RA-3 from the Urban Drainage and Flood Control District Criteria Manual (UDFCD Vol.1, Ch. 4, Pg. RA-6, Section 4.0)Note: Direct runoff flows (Q-CFS) shown above also include anticipated snowmelt rates per Town of Vail Code CH13-10-9-6a. (See Table 4 in Appendix)Note: One Hour Rainfall depth (IN) was based from the Town of Vail Code CH13-10-9-6a. (See Table 3 in Appendix)1.7TRAVEL TIME TO NEXT DOWNSTREAM DES. PT.DIRECT RUNOFFTOTAL RUNOFF PIPE DITCH / ACROSS GROUNDMarcin Engineering120048/21/2015Vail Golf and Nordic Clubhouse RemodelMarcin Engineering10 YEAR CALCULATED BYSTANDARD FORM SF-3 JOB NODATESTORM DRAINAGE SYSTEM DESIGN PROJECTCHECKED BY(RATIONAL METHOD PROCEDURE) DESIGN STORM1HR PT RAINFALL DEPTH (IN)DESIGN POINTAREA DESIGNAREA (ACRES)CTc (MINUTES)C*AI (IN/HR)Q (CFS)Tc (MINUTES)SUM (C*A)I (IN/HR)Q (CFS)MAX CAPACITY (CFS)Mannings No, nSLOPE (%)PIPE SIZE(IN.)LENGTH(FT)APX. VELOCITY(FPS)Tt (MINUTES)LENGTH (FT)SLOPE (%)CONVEYANCE COEFFAPX. VELOCITY (FPS)Tt (MINUTES)REMARKSOutput to Design Point1-A Basin 1 1.182 0.69 5.00 0.81 6.44 5.3110.18 0.012 0.80 18 37 6.0 0.10Flows thru 18" stormsewer system 2-A2-ABasin 20.1310.785.000.106.440.665.100.916.415.9310.180.0120.8018226.10.06Flows thru 18" stormsewer system3-A3-A Basin 3 0.110 0.83 5.00 0.09 6.44 0.60 5.16 1.00 6.39 6.50 10.22 0.012 0.81 18 51 6.3 0.13Flows thru 18" stormsewer system 4-A4-A Basin 4 0.047 0.86 5.00 0.04 6.44 0.26 5.30 1.04 6.35 6.71 10.22 0.012 0.81 18 43 6.6 0.11Flows thru 18" stormsewer system 5-A4-ABasin 50.1320.945.000.126.440.810.610.0121.006423.10.23Flows thru 18" stormsewer system5-ABasin 6 0.195 0.94 5.00 0.18 6.44 1.201.05 0.012 3.00 6 120 3.1 0.65Assumed to discharge to west drainage swale system 7-ABasin 7 0.132 0.94 5.00 0.12 6.44 0.81Assumed to discharge to landscaping N/A5-ABasins 1-55.411.176.317.468.080.0120.50183966.61.01Approx. Flow at Contech Water Quality MH6-A6-A6.411.176.007.10Approx. Q=7.10 c.f.s. at PondNote: Tc was assumed to be a minimum of 5 mins in accordance with the Urban Drainage and Flood Control District Criteria Manual (UDFCD Vol. 1, Ch. 5, Pg. RO-7, Section 2.4.4)output from AutoCAD Civil 3D SSA ProgramNote: Rainfall Intensity I (IN/HR) was based upon equation RA-3 from the Urban Drainage and Flood Control District Criteria Manual (UDFCD Vol.1, Ch. 4, Pg. RA-6, Section 4.0)Note: Direct runoff flows (Q-CFS) shown above also include anticipated snowmelt rates per Town of Vail Code CH13-10-9-6a. (See Table 4 in Appendix)Note: One Hour Rainfall depth (IN) was based from the Town of Vail Code CH13-10-9-6a. (See Table 3 in Appendix)1.9DITCH / ACROSS GROUNDMarcin Engineering8/21/2015Marcin Engineering12004Vail Golf and Nordic Clubhouse Remodel25 YEARTRAVEL TIME TO NEXT DOWNSTREAM DES. PT.DIRECT RUNOFFTOTAL RUNOFF PIPE CALCULATED BYSTANDARD FORM SF-3 JOB NODATESTORM DRAINAGE SYSTEM DESIGN PROJECTCHECKED BY(RATIONAL METHOD PROCEDURE) DESIGN STORM1HR PT RAINFALL DEPTH (IN)DESIGN POINTAREA DESIGNAREA (ACRES)CTc (MINUTES)C*AI (IN/HR)Q (CFS)Tc (MINUTES)SUM (C*A)I (IN/HR)Q (CFS)MAX CAPACITY (CFS)Mannings No, nSLOPE (%)PIPE SIZE(IN.)LENGTH(FT)APX. VELOCITY(FPS)Tt (MINUTES)LENGTH (FT)SLOPE (%)CONVEYANCE COEFFAPX. VELOCITY (FPS)Tt (MINUTES)REMARKSOutput to Design Point1-A Basin 1 1.182 0.73 5.00 0.86 8.14 7.0810.18 0.012 0.80 18 37 6.0 0.10Flows thru 18" stormsewer system 2-A2-ABasin 20.1310.795.000.108.140.855.100.968.107.8610.180.0120.8018226.10.06Flows thru 18" stormsewer system3-A3-A Basin 3 0.110 0.86 5.00 0.09 8.14 0.78 5.16 1.06 8.07 8.61 10.22 0.012 0.81 18 51 6.3 0.13Flows thru 18" stormsewer system 4-A4-A Basin 4 0.047 0.89 5.00 0.04 8.14 0.34 5.30 1.10 8.02 8.88 10.22 0.012 0.81 18 43 6.6 0.11Flows thru 18" stormsewer system 5-A4-ABasin 50.1320.965.000.138.141.040.610.0121.006423.10.23Flows thru 18" stormsewer system5-ABasin 6 0.195 0.94 5.00 0.18 8.14 1.511.05 0.012 3.00 6 120 3.1 0.65Assumed to discharge to west drainage swale system 7-ABasin 7 0.132 0.94 5.00 0.12 8.14 1.02Assumed to discharge to landscaping N/A5-ABasins 1-55.411.237.979.848.080.0120.50183966.61.01Approx. Flow at Contech Water Quality MH6-A6-A6.411.237.589.37Approx. Q=9.37 c.f.s. at PondNote: Tc was assumed to be a minimum of 5 mins in accordance with the Urban Drainage and Flood Control District Criteria Manual (UDFCD Vol. 1, Ch. 5, Pg. RO-7, Section 2.4.4) output from AutoCAD Civil 3D SSA ProgramNote: Rainfall Intensity I (IN/HR) was based upon equation RA-3 from the Urban Drainage and Flood Control District Criteria Manual (UDFCD Vol.1, Ch. 4, Pg. RA-6, Section 4.0)Note: Direct runoff flows (Q-CFS) shown above also include anticipated snowmelt rates per Town of Vail Code CH13-10-9-6a. (See Table 4 in Appendix)Note: One Hour Rainfall depth (IN) was based from the Town of Vail Code CH13-10-9-6a. (See Table 3 in Appendix)2.4TRAVEL TIME TO NEXT DOWNSTREAM DES. PT.DIRECT RUNOFFTOTAL RUNOFF PIPE DITCH / ACROSS GROUNDMarcin Engineering120048/21/2015Vail Golf and Nordic Clubhouse RemodelMarcin Engineering100 YEAR Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Aug 20 2015 VGC-Proposed Drainage Swale-10 YR Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 8235.00 Slope (%) = 1.85 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 18.00 Highlighted Depth (ft) = 0.65 Q (cfs) = 18.00 Area (sqft) = 4.71 Velocity (ft/s) = 3.82 Wetted Perim (ft) = 10.63 Crit Depth, Yc (ft) = 0.66 Top Width (ft) = 10.50 EGL (ft) = 0.88 0 5 10 15 20 25 30 35 Elev (ft)Depth (ft)Section 8234.50 -0.50 8235.00 0.00 8235.50 0.50 8236.00 1.00 8236.50 1.50 8237.00 2.00 8237.50 2.50 8238.00 3.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Aug 20 2015 VGC-Proposed Drainage Swale-25 YR Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 8235.00 Slope (%) = 1.85 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 27.00 Highlighted Depth (ft) = 0.79 Q (cfs) = 27.00 Area (sqft) = 6.28 Velocity (ft/s) = 4.30 Wetted Perim (ft) = 12.06 Crit Depth, Yc (ft) = 0.81 Top Width (ft) = 11.90 EGL (ft) = 1.08 0 5 10 15 20 25 30 35 Elev (ft)Depth (ft)Section 8234.50 -0.50 8235.00 0.00 8235.50 0.50 8236.00 1.00 8236.50 1.50 8237.00 2.00 8237.50 2.50 8238.00 3.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Aug 20 2015 VGC-Proposed Drainage Swale-100 YR Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 8235.00 Slope (%) = 1.85 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 64.00 Highlighted Depth (ft) = 1.19 Q (cfs) = 64.00 Area (sqft) = 11.84 Velocity (ft/s) = 5.41 Wetted Perim (ft) = 16.14 Crit Depth, Yc (ft) = 1.25 Top Width (ft) = 15.90 EGL (ft) = 1.64 0 5 10 15 20 25 30 35 Elev (ft)Depth (ft)Section 8234.50 -0.50 8235.00 0.00 8235.50 0.50 8236.00 1.00 8236.50 1.50 8237.00 2.00 8237.50 2.50 8238.00 3.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Aug 20 2015 VGC-Proposed 18-inch HDPE Culvert at Design Point 5-A - 10 YR Circular Diameter (ft) = 1.50 Invert Elev (ft) = 8229.50 Slope (%) = 0.81 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 6.68 Highlighted Depth (ft) = 0.88 Q (cfs) = 6.680 Area (sqft) = 1.08 Velocity (ft/s) = 6.17 Wetted Perim (ft) = 2.62 Crit Depth, Yc (ft) = 1.00 Top Width (ft) = 1.48 EGL (ft) = 1.47 0 1 2 3 4 Elev (ft)Depth (ft)Section 8229.00 -0.50 8229.50 0.00 8230.00 0.50 8230.50 1.00 8231.00 1.50 8231.50 2.00 8232.00 2.50 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Aug 20 2015 VGC-Proposed 18-inch HDPE Culvert at Design Point 5-A - 25 YR Circular Diameter (ft) = 1.50 Invert Elev (ft) = 8229.50 Slope (%) = 0.81 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 7.46 Highlighted Depth (ft) = 0.95 Q (cfs) = 7.460 Area (sqft) = 1.18 Velocity (ft/s) = 6.30 Wetted Perim (ft) = 2.77 Crit Depth, Yc (ft) = 1.06 Top Width (ft) = 1.44 EGL (ft) = 1.57 0 1 2 3 4 Elev (ft)Depth (ft)Section 8229.00 -0.50 8229.50 0.00 8230.00 0.50 8230.50 1.00 8231.00 1.50 8231.50 2.00 8232.00 2.50 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Aug 20 2015 VGC-Proposed 18-inch HDPE Culvert at Design Point 5-A - 100 YR Circular Diameter (ft) = 1.50 Invert Elev (ft) = 8229.50 Slope (%) = 0.81 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 9.84 Highlighted Depth (ft) = 1.18 Q (cfs) = 9.840 Area (sqft) = 1.49 Velocity (ft/s) = 6.59 Wetted Perim (ft) = 3.28 Crit Depth, Yc (ft) = 1.21 Top Width (ft) = 1.23 EGL (ft) = 1.85 0 1 2 3 4 Elev (ft)Depth (ft)Section 8229.00 -0.50 8229.50 0.00 8230.00 0.50 8230.50 1.00 8231.00 1.50 8231.50 2.00 8232.00 2.50 Reach (ft) Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Friday, Aug 21 2015 VGC-Inlet 1-A Grate Inlet Location = Sag Curb Length (ft) = -0- Throat Height (in) = -0- Grate Area (sqft) = 2.57 Grate Width (ft) = 1.88 Grate Length (ft) = 3.27 Gutter Slope, Sw (ft/ft) = 0.020 Slope, Sx (ft/ft) = 0.020 Local Depr (in) = -0- Gutter Width (ft) = 2.00 Gutter Slope (%) = -0- Gutter n-value = -0- Calculations Compute by: Q vs Depth Max Depth (in) = 6 Highlighted Q Total (cfs) = 7.00 Q Capt (cfs) = 7.00 Q Bypass (cfs) = -0- Depth at Inlet (in) = 5.98 Efficiency (%) = 100 Gutter Spread (ft) = 24.90 Gutter Vel (ft/s) = -0- Bypass Spread (ft) = -0- Bypass Depth (in) = -0- APPENDIX - C TABLE 1 Storm Water Treatment Device Hydraulic and Storage Capacities CDS Model Treatment Capacity (cfs)/(L/s) Minimum Sump Storage Capacity (yd3)/(m3) Minimum Oil Storage Capacity (gal)/(L) CDS2015-G 0.7 (19.8) 0.5 (0.4) 70 (265) CDS2015-4 0.7 (19.8) 0.5 (1.4) 70 (265) CDS2015 0.7(19.8) 1.3 (1.0) 92 (348) CDS2020 1.1 (31.2) 1.3 (1.0) 131 (496) CDS2025 1.6 (45.3) 1.3 (1.0) 143 (541) CDS3020 2.0 (56.6) 2.1 (1.6) 146 (552) CDS3030 3.0 (85.0) 2.1 (1.6) 205 (776) CDS3035 3.8 (106.2) 2.1 (1.6) 234 (885) CDS4030 4.5 (127.4) 5.6 (4.3) 407 (1540) CDS4040 6.0 (169.9) 5.6 (4.3) 492 (1862) CDS4045 7.5 (212.4) 5.6 (4.3) 534 (2012) CDS2020-D 1.1 (31.2) 1.3 (1.0) 131 (495) CDS3020-D 2.0 (56.6) 2.1 (1.6) 146 (552) CDS3030-D 3.0 (85.0) 2.1 (1.6) 205 (776) CDS3035-D 3.8 (106.2) 2.1 (1.6) 234 (885) CDS4030-D 4.5 (127.4) 4.3 (3.3) 328 (1241) CDS4040-D 6.0 (169.9) 4.3 (3.3) 396 (1499) CDS4045-D 7.5 (212.4) 4.3 (3.3) 430 (1627) CDS5640-D 9.0 (254.9) 5.6 (4.3) 490 (1854) CDS5653-D 14.0 (396.5) 5.6 (4.3) 599 (2267) CDS5668-D 19.0 (538.1) 5.6 (4.3) 733 (2774) CDS5678-D 25.0 (708.0) 5.6 (4.3) 814 (3081) CDS3030-DV 3.0 (85.0) 2.1 (1.6) 205 (776) CDS5042-DV 9.0 (254.9) 1.9 (1.5) 294 (1112) CDS5050-DV 11.0 (311.5) 1.9 (1.5) 367 (1389) CDS7070-DV 26.0 (736.3) 3.3 (2.5) 914 (3459) CDS10060-DV 30.0 (849.6) 5.0 (3.8) 792 (2997) CDS10080-DV 50.0 (1416.0) 5.0 (3.8) 1057 (4000) CDS100100-DV 64.0 (1812.5) 5.0 (3.8) 1320 (4996) Area 1.6 acres 31 Weighted C 0.89 (select from Rainfall Data column D) Tc 5 minutes Particle size 125 microns CDS Model 3035 (select from pulldown) 3.8 cfs Diameter CDS Hydraulic Capacity 20.0 cfs Rainfall Intensity1 (in/hr) Percent Rainfall Volume1 Cumulative Rainfall Volume Total Flowrate (cfs) Treated Flowrate (cfs) Operating Rate (%) Removal Efficiency (%) Incremental Removal (%) 0.04 28.3% 28.3% 0.06 0.06 1.50 100.0 28.3 0.08 33.1% 61.4% 0.11 0.11 3.00 100.0 33.1 0.12 13.2% 74.6% 0.17 0.17 4.50 100.0 13.2 0.16 8.1% 82.7% 0.23 0.23 6.00 100.0 8.1 0.20 5.2% 87.9% 0.28 0.28 7.49 99.9 5.2 0.24 2.5% 90.4% 0.34 0.34 8.99 99.6 2.5 0.28 1.5% 91.9% 0.40 0.40 10.49 99.3 1.5 0.32 1.1% 93.0% 0.46 0.46 11.99 99.0 1.1 0.36 0.7% 93.7% 0.51 0.51 13.49 98.7 0.7 0.40 0.5% 94.2% 0.57 0.57 14.99 98.4 0.5 0.44 0.7% 94.9% 0.63 0.63 16.49 98.1 0.7 0.48 0.8% 95.7% 0.68 0.68 17.99 97.8 0.7 0.52 0.8% 96.5% 0.74 0.74 19.49 97.5 0.8 0.56 0.2% 96.7% 0.80 0.80 20.99 97.2 0.2 0.60 0.2% 96.9% 0.85 0.85 22.48 96.9 0.2 0.64 0.2% 97.1% 0.91 0.91 23.98 96.6 0.2 0.68 0.2% 97.3% 0.97 0.97 25.48 96.3 0.2 0.72 0.2% 97.6% 1.03 1.03 26.98 96.0 0.2 0.76 0.5% 98.0% 1.08 1.08 28.48 95.7 0.5 0.80 0.5% 98.6% 1.14 1.14 29.98 95.4 0.5 98.4 0.0% 98.6% 98.4% 1 - Based on 10 years of 15-minute rainfall data from NCDC Station 2454 at Eagle FAA Airport, Eagle Co., CO 2 - Reduction due to use of 60-minute data for a site that has a time of concentration less than 30-minutes. Predicted Net Annual Load Removal Efficiency = BASED ON AN AVERAGE PARTICLE SIZE OF 125 MICRONS CDS ESTIMATED NET ANNUAL SOLIDS LOAD REDUCTION Vail Golf and Nordic Center Vail, CO Rainfall Station # CDS Treatment Capacity Removal Efficiency Adjustment2 = Predicted % Annual Rainfall Treated = BASED ON THE RATIONAL RAINFALL METHOD APPENDIX - D