Loading...
HomeMy WebLinkAbout4 - Staging Plan - 04-01-16 - 05-15-16.pdfGRAPHIC SCALE (IN FEET) 1 inch = ft. 30 Copyright © 2015 by Zehren & Associates Inc. 2 % 2% 6' tall Construction Site Fence with green screen mesh - Keep off old 18th green in this location Staging & Access Pedestrian access - Maintain 6' clear opening from edge of asphalt to fence Parking & Laydown Construction Entrance - Gates swing into site VRD Storage Pod - Provide access gate Work in this area - concrete, asphalt, striping Staging Plan from 04-01-16 - 05-15-16 Notes: Town of Vail to handle snow removal from Nordic/Golf Parking. VRD to keep all public pathways clear of snow. ECCG to remove snow from work areas under its control. Refer to Civil plans for erosion control measures. Bus Turnaround to stay open until 04-10-16 Work in this area - concrete, asphalt, striping 4' tall orange construction fence for work in parking lot No parking in the lot during this time frame. Re-sod disturbed areas, typical 09/02/15