Loading...
HomeMy WebLinkAboutB15-0341 A104.pdfScale Project Number Date Drawn by Checked by The Arrabelle at Vail Square Building "D" Level Two Retail, Vail, CO 81657 THIS BOX FOR TOV APPROVALS ONLY 1/8" = 1'-0" 10/22/2015 2:41:53 PM A104 FIXTURE PLAN, DETAILS, & SCHEDULES 24515 ArraBelle Tenant Finish Vail Resorts Retail 16 September 2015 PT PT DOOR SCHEDULE MARK TYPE WIDTH HEIGHT THICKNESS MATERIAL FINISH FRAME TYPE FRAME FINISH HARDWARE COMMENTS 1 FLUSH 3' - 0" 6' - 8" 1 3/4" WOOD PAINT PT-2 HOLLOW METAL PAINT PT-2 PRIVACY PROVIDE SCHLAGE PLYMOUTH STYLE BROADWAY LEVER F40 BRW 619 LOCKSET, HINGES, AND FLOOR STOP 2 FLUSH 3' - 6" 6' - 8" 1 3/4" WOOD PREFINISHED WOOD IMI-BETON BOARD PRIVACY PROVIDED BY FIXTURE FABRICATOR, INSTALLED BY GC. WRAP FRAME WITH IMI-BETON BOARD. SEE DETAILS 3 FLUSH 3' - 6" 6' - 8" 1 3/4" WOOD PREFINISHED WOOD IMI-BETON BOARD PRIVACY PROVIDED BY FIXTURE FABRICATOR, INSTALLED BY GC. WRAP FRAME WITH IMI-BETON BOARD. SEE DETAILS 4 FLUSH 3' - 0" 6' - 8" 1 3/4" WOOD PAINT PT-2 HOLLOW METAL PAINT PT-2 PASSAGE PROVIDE SCHLAGE PLYMOUTH STYLE BROADWAY LEVER F10 BRW 619 LOCKSET, HINGES, AND WALL STOP 5 FLUSH 3' - 0" 6' - 8" 1 3/4" WOOD PAINT PT-2 HOLLOW METAL PAINT PT-2 ENTRY PROVIDE SCHLAGE PLYMOUTH STYLE BROADWAY LEVER F51 BRW 619 LOCKSET, HINGES, AND FLOOR STOP ROOM FINISH SCHEDULE NAME NUMBER FLOOR FINISH BASE WALL FINISH CEILING FINISH COMMENTS ARC'TERYX 1 (E) COMPOSITE DECKING EXISTING TO REMAIN. PAINT PT-1 (E) & NEW GYP. BD. PAINT PT-1/IMI-BETON BOARD (E) GYP. BD. PAINT PT-1 IMI-BETON SUPPLIED BY TENANT, INSTALLED BY GC OFFICE 2 (E) COMPOSITE DECKING RUBBER BASE B-1 (E) & NEW GYP. BD. PAINT PT-4 (E) GYP. BD. PAINT PT-3 BACKSTOCK 3 (E) COMPOSITE DECKING RUBBER BASE B-1 (E) & NEW GYP. BD. PAINT PT-4 (E) GYP. BD. PAINT PT-3 FITTING 4 (E) COMPOSITE DECKING NONE (E) & NEW GYP. BD. PAINT PT-1/IMI-BETON BOARD NEW SUSP. GYP. BD. PAINT PT-4 IMI-BETON SUPPLIED BY TENANT, INSTALLED BY GC ACCESSIBLE FITTING 5 (E) COMPOSITE DECKING NONE (E) & NEW GYP. BD. PAINT PT-1/IMI-BETON BOARD NEW SUSP. GYP. BD. PAINT PT-4 IMI-BETON SUPPLIED BY TENANT, INSTALLED BY GC ACCESSIBLE RESTROOM 6 (E) COMPOSITE DECKING CERAMIC TILE CT-1 (E) & NEW GYP. BD./PAINT PT-3/CT-1 WAINSCOT NEW SUSP. GYP. BD. PAINT PT-3 FINISH NOTES FLOORING General Notes: Install and maintain per manufacturer and industry standards, using manufacturer recommended materials. CERAMIC WALL TILE CT-1 Manufacturer: Daltile Representative: 303-722-2800 Model Name: Rittenhouse Square Color: 0709 Architectural Gray Size: 3"x6" Thickness: 5/16" Installation: Horizontal Substrate: Water Resistant Gypsum Board Bond: Running Top Trim: S-4369 Bullnose along 6" edge Finish: Semi-Gloss Grout: Mapei Charcoal 47 Area: Restroom Wainscoting WALLBASE B-1 Manufacturer: Roppe Material: Rubber Style: Standard Toe Color/Number: Black 100 Size: 4” Thickness: 1/8” Fire rating: Non-combustible Area: Office & Backstock PAINT PT-1 Manufacturer: Benjamin Moore Number: Verify with Arc'teryx Color: Pure Black Finish: Eggshell Area: Sales Floor Walls & Ceiling and Fitting Room Walls PT-2 Manufacturer: Benjamin Moore Number: Verify with Arc'teryx Color: Pure Black Finish: Semi-Gloss Area: Bathroom, Backstock, and Office Doors & Frames PT-3 Manufacturer: Sherwin Williams Type: Dry Fog Epoxy - Verify with Arc'teryx Number: 480 Color: Brilliant White Area: Restroom Walls & Ceiling PT-4 Manufacturer: Sherwin Williams Type: Dry Fog Epoxy - Verify with Arc'teryx Number: 480 Color: Brilliant White Area: Restroom Walls & Ceiling 1 1/8" = 1'-0" A104 2 FIXTURE PLAN No. Description Date 1 ARCTERYX REVISIONS 10/21/15 11/11/15