Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P1.0.pdf
JOB NAME: PROJECT ELEVATION: 8150 A.S.L. JOB NUMBER: GAS VALUE: 808 BTU/CF DATE: GAS COMPANY: PREPARED BY: MAX. PIPE RUN: 60' L.P. 0 M.P. TAG DESCRIPTION BTUH TABLE CFH SIZE FP-1 FIREPLACE 30,000.00 37.1 3/4" 30,000.00 37.13 1-1/4" MAIN-TOTAL GAS SIZING SCHEDULE 15102.00 11/10/2015 MARTIN ZOUREK LOCAL VILLAGE CENTER UNIT 7E JOB NAME: PROJECT ELEVATION: 8150 A.S.L. JOB NUMBER: GAS VALUE: 808 BTU/CF DATE: GAS COMPANY: PREPARED BY: MAX. PIPE RUN: 60' L.P. 0 M.P. TAG DESCRIPTION BTUH TABLE CFH SIZE FP-1 FIREPLACE 30,000.00 37.1 3/4" 30,000.00 37.13 1-1/4" MAIN-TOTAL GAS SIZING SCHEDULE 15102.00 11/10/2015 MARTIN ZOUREK LOCAL VILLAGE CENTER UNIT 2E / 3E 12/01/15