HomeMy WebLinkAboutM220 UPPER PIPING.pdfDNDN124356A.1BCDEFGHA1.13.21.2E.1E.2D.2D.13.1NOTES:SCALE:SECOND FLOOR PIPING PLAN3/16" = 1'-0"RADIANTZONE #14BT2/1TT2/12/12/12/12/1TTTTTTTTTSNOWMELT MANIFOLD #7A.SNOWMELT MANIFOLD #7B.SNOWMELTMANIFOLD #9B.SNOWMELTMANIFOLD #8B.SNOWMELTMANIFOLD #8A.CHRCHSHWRHWSCHRCHSHWRHWSCHRCHSHWRHWSCHRCHSHWRHWSRADIANTZONE #15BSNOWMELTZONE #8BSNOWMELTZONE #9BRADIANTZONE #13ARADIANTZONE #15ARADIANTZONE #14ASNOWMELTZONE #8ARADIANTZONE #16ARADIANTZONE #11ARADIANTZONE #12ASNOWMELTZONE #7ARADIANTZONE #12BRADIANTZONE #13BSNOWMELTZONE #7BRADIANTZONE #11BRADIANTZONE #16BRM-16B3/4" HWS/R, 1"CHS/R TO 3/4" HWS/R, 3/4"CHS/R TO CHRCHSHWRHWS1-1/4"3/4"3/4"1-1/4"3/4" HWS/R, 1-1/4" CHS/R FROMFLOOR BELOW.3/4" HWS/R, 3/4" CHS/R TO .1" HWS/R, 1-1/4" CHS/R FROM BELOW.3/4"3/4"1-1/4"1-1/4"1"1"3/4"3/4"3/4" HWS/R, 1" CHS/R TO 3/4" HWS/R, 3/4" CHS/RTO .3/4" HWS/R, 3/4" CHS/RTO .1"CW, 1"HW, 3/4" HWCFROM FLOOR BELOW.1" CW, 3/4" HW, 3/4" HWC TOBATHROOM GROUP, CDBBC.1" CW, 3/4" HW, 3/4" HWC TOBATHROOM GROUP, CDBBC.1" CW, 3/4" HW, 3/4" HWC TOBATHROOM GROUP.CONTINUATION DESIGN/BUILDBY CONTRACTOR.1-1/4 "CW, 1-1/4" HW, 3/4" HWCFROM BELOW.1" CW, 3/4" HW, 3/4" HWCTO BATHROOM GROUP,CONTINUATIONDESIGN/BUILD BYCONTRACTOR.1" CW, 3/4" HW, 3/4" HW TOBATHROOM GROUP, CDBBC.1-1/4"3/4"3/4"1" CW, 1" HW, 3/4" HWC TOBATHROOM GROUP, CDBBC.1" CW, 3/4" HW, 3/4" HWC TOBATHROOM GROUP, CDBBC.1-1/4"3/4"3/4"1-1/4"1"3/4"1"CW, 1"HW, 3/4" HWCTO BATHROOM GROUP,CDBBC.1. RE: M4 SERIES FOR PIPING DIAGRAMS.2. COORDINATE ROUTING OF CONDENSATE DRAIN LINESWITH ARCHITECT PRIOR TO INSTALLATION.3. PIPING ON EXTERIOR WALLS TO BE ROUTED INFRAMED WALL ON INTERIOR SIDE OF INSULATION.4. AVOID ROUTING PIPING OVER ELECTRICAL ROOMS ORELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES.COORDINATE ROUTINGS WITH DIV. 16 CONTRACTOR.5. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALLMOTORIZED EQUIPMENT.6. VERIFY ALL EQUIPMENT ACCESS PANELS WITHMANUFACTURER AND ARCHITECT.7. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATEFIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.8. ALL BRANCH CHILLED AND HEATING WATER PIPING TOFAN COIL UNITS SHALL BE 3/4" U.N.O.9. ALL VALVES SHALL BE INSTALLED WITH ACCESSPANELS IN HARD-LID CEILINGS.10. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE INTHE CEILING SPACE. UTILIZE JOIST SPACE WHENPOSSIBLE, ESPECIALLY WHERE CROSSING OTHERPIPES, DUCTS, AND ELECTRICAL.11. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONSSHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALLBE COORDINATED WITH THE ARCHITECTS DRAWINGSAND WITH THE LOCATIONS OF THE EQUIPMENT ORAPPARATUS THAT THEY SERVE.12. REFER TO THE PLUMBING FIXTURE CONNECTIONSCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.13. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILYSHOWN ON THESE PLANS. PROVIDE CLEANOUTS ONWASTE, VENT AND STORM PIPING AS REQUIRED BYCODE AND FOR REASONABLE MAINTENANCE BASEDON ACTUAL FIELD INSTALLATION. COORDINATELOCATIONS WITH ARCHITECT/ENGINEER.14. ST AND ST(OF) PIPING 3", U.N.O.15. ROOF OVERFLOW DRAINAGE STRATEGY TO BEDETERMINED OR VIA ARCHITECTURAL SCUPPERSU.N.O.16. TERMINATE PLUMBING VENTS NOT LESS THAN 12"ABOVE ROOF.17. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 10FEET OF ALL HOT WATER FIXTURES. CONNECT WITHIN5 FEET OF 0.5 GPM AND LOWER FAUCETS.G TO FIREPLACE.G TO FIREPLACE.4"ø RADON PIPE THRU ROOF.EXTEND I.A.W. 2012 IRC,APPENDIX F, SECTION AF102.6.4"ø RADON PIPE THRU ROOF.EXTEND I.A.W. 2012 IRC,APPENDIX F, AF102.6/4"ø RADON PIPE THRU ROOF.EXTEND I.A.W. 2012 IRC,APPENDIX F, SECTION AF102.6.182 WEST MEADOW DRIVEVAIL, CO 81657PIETRINI RESIDENCEProject Number - 142807/30/14DESIGN REVIEWCOPYRIGHT 2014BANZEGEAUDIN(970) 949-6108(303) 278-3820(970) 221-5691(505) 323-9070(307) 739-3944Vail:Denver:Fort Collins:Albuquerque:Jackson:www.bgce.com09/05/14PERMIT SETM2.20 2ND FLOORPIPING PLAN