Loading...
HomeMy WebLinkAboutBegin_Workflow-01-20-2015_10-37-24.pdfClick Here to Save Eform as PDF... Review Information Permit Information Contact Information Resources Checklist Report (0)Routing Slip Review Coordinator Carolyn Godfrey  ( cgodfrey@vailgov.com ) Review Cycle 1 Workflow/Activity Name Begin_Workflow / ApplicantResubmit  Activity InstructionsPlease review all sections of the eForm and drawing markups and resubmit the required  information prior to completion of task. Current User Logon Adam Gilmer ( adam@berglundarchitects.com)  CHANGEMARKS ­ Review Cycle:1 Filter Changemarks by Keyword:  SEARCH    SHOW ALL Click Here to Load Changemarks... Click Here to Publish Changemarks to PDF... Sorting: Resolved Status File Cycle Department File Markup Description Details Applicant Response Yes | No No 1 Planning A3.3.pdf jbatcheller P001 This area counts towards GRFA, per Section 12­15­ 3 http://sterlingcodifiers.com/codebook/index.php? book_id=560§ion_id=841013 Yes | No No 1 Planning A2.4.pdf jbatcheller P001 Revise GRFA calcs to include the auto court. Yes | No No 1 Public Works A3.3.pdf lsandoval PW001 Removal of, On street parking will be required. Show on site plan. Yes | No No 1 Public Works A3.3.pdf lsandoval PW002 The Public Works Department, Engineering will not support driveway to exceed 12% grade. As shown, currently at 16%. Revise Yes | No No 1 Public Works A3.3.pdf lsandoval PW003 No additional concrete pan will be required, if one currently exist. Concrete pan shall not be heated. Please note on plans, heated driveway within right of way shall me on a seperate zone marked at control box, TOV or ROW. Yes | No No 1 Public Works A3.3.pdf lsandoval PW004 Show a limits of disturabance fence and BMP ( Best Management Practices for Erosion Control on site plan. Yes | No No 1 Public Works A3.3.pdf lsandoval PW005 A Revocable Right of Way Permit will be required for all improvments within the Right of Way. To be submitted at building permit submittal. Yes | No No 1 Public Works A3.3.pdf lsandoval PW006 Provide, Stamped approved drawing for a license PE, for Retaining Wall, over 4 ft in height. All disturbed grading, must return to a 2:1 grade. Complete  Save And Close   Building Process V1 DEPARTMENT REVIEW ­ Review Cycle:1   CYCLE DEPARTMENT REVIEWED BY STATUS & NOTES 1 FIRE MIKE VAUGHAN  MVAUGHAN@VAILGOV.COM NO REVIEW REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PLANNING JOE BATCHELLER  JBATCHELLER@VAILGOV.COM CORRECTIONS REQUIRED PLAN REVIEW AND/OR ASSIGNMENT COMPLETE 1 PUBLIC WORKS LEONARD SANDOVAL  LSANDOVAL@VAILGOV.COM CORRECTIONS REQUIRED VIEW CHECKLIST PLAN REVIEW AND/OR ASSIGNMENT COMPLETE I have reviewed and addressed the Checklist Comments provided on the "Checklist" tab above. Please click on the tab and review each item. Each comment will be indicated as "Met" or "Not Met". If you would like to export a list of the comments to Excel, click on the "Export to Excel" link in the upper right hand corner of the popup window. I have addressed all of the items listed in the Changemarks section above that were identified during the Plan Review. I have uploaded the revised drawings into the "Drawings" folder and, if requested, uploaded any revised documents into the "Documents" folder using the SAME file name as the original files. I am ready to complete my assigned task. Task Instructions