Loading...
HomeMy WebLinkAboutM201.pdfUPUPEXHEXHEXHEF-2DB-1562734ABCGHKLMEDJFEF -2EF -2EF -1EF -1EF -1B -1aB -1bWH-1aWH-1b(2) 4"ø BOILEREXH UP.CH -1ST -1ET -1EF -3EF -38ø10"ø EXH UP.3'-0" MIN.EF -13'-0" MIN.3'-0" MIN.NOT FOR CONSTRUCTIONProject numberDateDrawn by7/5/2015 6:40:50 PMM201LEVEL 1 HVAC PLANHUGHES-1LOT 3 / 994 PTARMIGAN RDVAIL,COHughes Residence06.29.15DAL 1/4" = 1'-0"1LEVEL 1 HVAC PLANNo. Description DateRE: _/M_ FOR FIRE AND FIRE/SMOKEDAMPER ASSEMBLY.RE: _/M_ FOR TYPICAL DIFFUSERCONNECTION.RE: _M/_ FOR FAN COIL UNIT INSTALLATION.RE: _/M_ FOR VERTICAL FAN COIL UNITINSTALLATION.RE: _/M_ FOR ROUND DUCT TAKE-OFFDIAGRAM.RE: _/M_ FOR 45° DUCT TAKE-OFFDIAGRAM.COORDINATE ROUTING OF CONDENSATEDRAIN LINES WITH ARCHITECT PRIOR TOINSTALLATION.CEILING COORDINATION OF ALL MEPSYSTEMS (LIGHTING, DUCTWORK,DIFFUSERS, ELECTRICAL, FIREPROTECTION, ETC.) MUST BE COMPLETEDBY THE CONTRACTOR PRIOR TO THESTART OF ANY INSTALLATIONS.AVOID ROUTING DUCTWORK OVERELECTRICAL ROOMS OR ELECTRICALPANELS; MAINTAIN N.E.C. CLEARANCES.COORDINATE ROUTINGS WITHELECTRICAL CONTRACTOR.CONTRACTOR TO MAINTAIN 8'-6" CLEARHEAD HEIGHT IN GARAGE AND INFORM THEENGINEER AND ARCHITECT OF ANY AREASTHAT MAY NOT MEET 8'-6" PRIOR TOINSTALLATION, MINIMUM 8'-2" CLEAR HEADHEIGHT MUST BE MAINTAINED INACCESSIBLE VAN AREAS.PROVIDE FLEXIBLE DUCT AND PIPECONNECTIONS TO ALL MOTORIZEDEQUIPMENT.VERIFY ALL EQUIPMENT ACCESS PANELSWITH MANUFACTURER AND ARCHITECT.ALL SOURCES OF IGNITION ONMECHANICAL EQUIPMENT SHALL BEMOUNTED 18" AFF.PROTECT PIPING ROUTED ALONGCOLUMNS, WALLS, ETC. FROM DAMAGE ASNECESSARY WITH CAGES. COORDINATEWITH ARCHITECT.PEX PIPING SHALL NOT BE ALLOWED TOPENETRATE FIRE BARRIERS WHERE FIRECAULKING IS REQUIRED.ALL RETURN AIR GRILLES SHALL BEPROVIDED WITH SOUND BOOT. RE: _/M_FOR INSTALLATION.THE SPACE ABOVE CEILING IS BEINGUTILIZED AS A RETURN AIR PLENUM. ALLRETURN GRILLES SHALL BE PROVIDEDWITH SOUND BOOTS AND A DIRECT PATHTO THE AIR HANDLING SYSTEM RETURNDUCT, OPEN TO PLENUM. WHERE FULLHEIGHT WALLS ARE INSTALLED AND THERETURN AIR PATH IS COMPROMISED, THESOUND BOOT SHALL EXTEND THROUGHTHE WALL OR TRANSFER AIR DUCTSSHALL BE PROVIDED.T-STATS AND CO2 SENSORS SHALL BELOCATED NEAR THE LIGHT SWITCH WITHINTHE ROOM SHOWN. COORDINATE WITHARCHITECT & ELECTRICAL ENGINEER TOMATCH HEIGHT AND LOCATION.ALL DUCTWORK SHALL BE ROUTED ASHIGH AS POSSIBLE IN THE CEILING SPACE.UTILIZE JOIST SPACE WHEN POSSIBLE,ESPECIALLY WHERE CROSSING OTHERDUCTS, PIPES, AND ELECTRICAL.ACCESS PANELS SHALL BE 24x24, UNOPLOCATIONS SHOWN ARE APPROXIMATE,EXACT LOCATIONS SHALL BECOORDINATED WITH THE ARCHITECTSDRAWINGS AND WITH THE LOCATIONS OFTHE EQUIPMENT OR APPARATUS THATTHEY SERVE.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.NOTES: