Loading...
HomeMy WebLinkAboutS300.pdf21 28 36 43 62 71 80 90 100 LAP SPLICE AND DEVELOPMENT LENGTH SCHEDULE (INCHES) #3 #4 #5 #6 #7 #8 #9 #10 #11 9 11 14 17 19 22 25 28 31 12 15 19 23 27 30 34 38 43 6 8 10 12 13 15 18 20 22 22 29 36 43 63 72 81 91 101 GENERAL NOTES: 1. 'LCE' = COMPRESSION EMBEDMENT LENGTH, 'LCS' = COMPRESSION LAP SPLICE LENGTH, 'LTE' = TENSION EMBEDMENT LENGTH, 'LTS' = TENSION LAP SPLICE LENGTH, 'LDH' = HOOK DEVELOPMENT LENGTH 2. 'TOP' BARS ARE HORIZONTAL BARS PLACED SUCH THAT MORE THAN 12 IN. OF FRESH CONCRETE IS CAST BELOW THE BAR 3. ALL BARS THAT ARE NOT 'TOP' BARS ARE 'OTHER' BARS 4. UNLESS NOTED OTHERWISE, ALL HOOK BARS SHALL EXTEND TO THE FAR FACE (LESS 2" COVER) LAP SPLICE NOTES: 1. ALL SPLICES SHALL BE WIRED IN CONTACT. TOP AND BOTTOM BEAM SPLICES SHALL BE STACKED VERTICALLY 2. ALL SPLICES ARE 'LTS' UNLESS NOTED OTHERWISE 3. SMALLER BAR LAP LENGTH SHALL BE USED WHEN SPLICING DIFFERENT SIZED BARS A. COMPRESSION LAP LENGTH SHALL NOT BE LESS THAN 'LCE' OF THE LARGER BAR B. TENSION LAP LENGTH SHALL NOT BE LESS THAN 'LTE' OF THE LARGER BAR 4. LAP LENGTHS SPECIFICALLY DETAILED ON DRAWINGS SHALL GOVERN IN LIEU OF LAP LENGTHS SCHEDULED 5. BUNDLED BAR SPLICES: A. INDIVIDUAL BAR SPLICES WITHIN THE BUNDLE SHALL BE STAGGERED B. INCREASE LAP LENGTH 20% FOR A 3 BAR BUNDLE C. INCREASE LAP LENGTH 33% FOR A 4 BAR BUNDLE 6. IF A NOTE OR DETAIL CALLS FOR A BAR TO BE EMBEDDED Ld (DEVELOPMENT LENGTH) INTO CONCRETE, THIS LENGTH SHALL CORRESPOND TO A 'LTE' LAP ADJUSTMENTS TO GIVEN LENGTHS: 1. IF REINFORCING IS SPECIFIED AS EPOXY COATED, INCREASE SCHEDULED LENGTHS BY 50% 2. IF LIGHTWEIGHT AGGREGATE IS SPECIFIED, INCREASE SCHEDULED LAP BY 30% 3. SCHEDULED LENGTHS ASSUME: A. CLEAR COVER IS GREATER THAN BAR DIAMETER, BUT NOT LESS THAN 3/4" B. CLEAR SPACING BETWEEN BARS IS GREATER THAN 2 BAR DIAMETERS C. IF EITHER CONDITION A OR B IS NOT MET FOR A GIVEN BAR, INCREASE LENGTHS BY 50% 4. LENGTHS NOTED BASED ON Fy = 60,000 PSI. FOR OTHER YIELD STRENGTHS, MULTIPLY LENGTHS NOTED BY Fy/60,000 HOOK EMBEDMENT NOTES: 1. SCHEDULED HOOK EMBEDMENT LENGTHS ASSUME: A. SIDE COVER IS 2 1/2 INCHES OR GREATER B. COVER BEYOND IS 2 INCHES OR GREATER 2. IF REINFORCING IS SPECIFIED AS EPOXY COATED, INCREASE SCHEDULED LENGTHS BY 20% 3. IF LIGHTWEIGHT AGGREGATE IS SPECIFIED, INCREASE SCHEDULED LENGTHS BY 30% 4. IF SIDE COVER IS LESS THAN 2 1/2 INCHES, INCREASE LENGTHS BY 40% 77 70 62 55 48 131 118 105 93 81 22 33 27 16 37 56 46 28 COMP TENSION 78 87 8 10 12 15 17 19 22 24 27 12 15 19 23 27 30 34 38 43 6 7 8 11 12 13 15 17 19 19 25 31 37 54 62 70 79 87 67 60 54 47 42 113 102 91 80 70 19 28 24 14 32 48 40 24 COMP 17 22 28 33 48 55 62 70 78 6 6 8 9 11 12 13 15 17 17 22 28 33 49 55 63 70 78 60 54 48 42 37 101 91 81 72 63 17 25 21 13 29 43 36 2218 25 31 37 54 62 70 8 9 12 14 16 18 21 23 26 12 15 19 23 27 30 34 38 43 LCE LCS LDH LTE TOP LTE OTHER LTS TOP LTS OTHER LCE LCS F'c = 3,000 PSI THRU 3,500 PSI BAR SIZE (IN-LB) F'c = 4,000 PSI F'c = 5,000 PSI COMP TENSIONTENSION LCE LCS LDH LTE TOP LTE OTHER LTS TOP LTS OTHER LDH LTE TOP LTE OTHER LTS TOP LTS OTHER #10 #13 #16 #19 #22 #25 #29 #32 #36 BAR SIZE (METRIC) CONCRETE COVER CASE COVER (IN) CONCRETE PLACED AGAINST EARTH 3 CONCRETE PLACED IN FORMS, EXPOSED TO WEATHER OR EARTH 2 SLABS OR WALLS NOT EXPOSED TO EARTH OR WEATHER 1 NOTES: 1. ALL BENDS SHALL BE MADE COLD 2. #14 & #18 BARS SHALL BE BEND TESTED & LAB APPROVED PRIOR TO BENDING STANDARD BENDS 90° HOOK #3-#5 d 3" MIN 6d TYPICAL REINFORCING BENDS STIRRUP/TIE BENDS 180° HOOK D 21 6 MAX OFFSET BEND D1 #3 - #8 6d #9 - #11 8d 90° HOOK #6-#8 d 12d D 2135° HOOK d6d3" MIND290° HOOKd 12dD 1 180° HOOKd 4d 2 1/2" MIN D1 #3 - #5 4d #6 - #8 6d D2 d4d 2 1/2" MIN D2 ADD 1/2 NUMBER OF BARS INTERRUPTED BY OPNG PLUS 1, SPACE AT 3" OC DETAIL SIMILAR FOR CIRCULAR OPENINGS NOTES: 1. DETAIL APPLIES UNLESS REINF IS SPECIFICALLY DETAILED ON THE DRAWINGS 2. HOOK BARS WITH STANDARD HOOK WHERE LTS CANNOT BE ACHIEVED 3'-0" MAX W H, 3'-0" MAXTYPLTSTYPICAL OPENINGTMAX D=0.3T OR 2"WHICHEVER IS SMALLERD = OUTSIDE DIAMETER 3D (12" MIN) CLEAR NOTE: WHERE CLEAR DISTANCE BETWEEN SLEEVES CAN NOT BE ACHIEVED AS SHOWN, STRUCTURAL ENGINEER OF RECORD SHALL BE NOTIFIED. SCHEDULE 40 SLEEVES SHALL BE USED IN CRITICAL AREAS OF THE WALL AND SLABS AS DETERMINED BY STRUCTURAL ENGINEER OF RECORD. IN WALL OR SLAB CONDUITS GREATER THAN [0.2T] SHALL BE SUBMITTED FOR REVIEW AT PIPING OR CONDUIT NOTE 1 D 12" MAX NOTE 1ALIGN PEN'S VERTICALLY B/WALL NOTES: 1. GREATER OF 2xD AND 12", WHERE CLEAR DISTANCE IS NOT ACHIEVABLE, TREAT AREA AS SINGLE OPENING REINFORCED PER "TYPICAL OPENING" DETAIL 2. DO NOT CUT REBAR AT PENETRATIONS LOCS. REBAR MAY BE MOVED 8" MAX TO ACCOMMODATE PENETRATIONS EDGES, TYP12" FROM ALLTYP EW 2" CLR TO REINF, NOTE 2 AT OPENINGS 12" OR LESS 6'-6" MAX 1'-0" MIN (2) #4@3" OC ES OF OPENING. FULL HEIGHT (3) #4@3" OC T&B. CONTINUE FULL WIDTH OF WALL Project number Date Drawn by MM JOB #: 15.0197.S.01PRINCIPAL/EOR: PDPROJECT MANAGER: KHDESIGNERS: JW/KHDATE PRINTED:FILE PATH:07/02/2015 C:\Proj\15.0197-994Ptarmigan-RS15_kevinh.rvt7/2/2015 2:34:39 PMS300 TYP CONCRETE DETAILS M15.0197.S.01LOT 3 / 994 PTARMIGAN RDVAIL,COHughes Residence07.02.2015 KH NO SCALE8 REINFORCING DEVELOPMENT, PLACEMENT, AND BEND INFO NO SCALE9 TYP CONC WALL PENETRATIONS 3/4" = 1'-0"10 FIREPLACE OPENING No. Description Date PERMIT SET 07.02.2015