HomeMy WebLinkAboutFP-4.pdfThis system as shown on company print no dated
for at
contract no is designed to discharge at a rate of
a maximum area of when supplied with water at a rate of
Occupancy classification:
Commodity classification:
Maximum storage height:
Storage arrangement:
Number of heads flowing:
System Type:
Maximum velocity:
Flow from In-Rack sprinklers:
Flow from Overhead sprinklers:
Flow from Inside Hoses:
Flow from Outside Hoses:
Other fixed flows:
Total flow in system piping:
Additional flow at/beyond source:
Total of all flows:
Calculation results for Design Area
JSPIWðߛ/PLQPðߜRIIORRUDUHDRYHU
-
Surplus Pressure at Source:
Pressure Required at Source:
Pressure Available at Source:
at
at the base of the riser.
Hose stream allowance of is included in the above.
1
Main Floor
Meridian Fire Intermountain
6-27-14
Cummings Residence
4936 Juniper Lane
14-679
0.1
IWð
80.6 gpm 83.4 psi
R3
4
Wet
10.16 ft/s
0 gpm
80.6 gpm
0 gpm
0 gpm
0 gpm
80.6 gpm
100 gpm
180.6 gpm
83.4 psi
88.8 psi
5.4 psi
REVISIONS:
PROJECT NUMBER:
ISSUE:
PERMIT SET
OF
DRAWN BY: BAE
CHECKED BY: JLD/KLM
FIRE PROTECTION CONTRACTOR
12364 W. Alameda Pkwy Ste. 135
Lakewood, Colorado 80228
303-985-3300 Office
303-985-5594 Fax
www.veritasfire.com
4
DATE: 06-27-14
COPYRIGHT 2014
This document is an instrument of service, and
as such, remains the property of the Engineer.
Permission for use of this document is limited
and can be extended only by written agreement
with Veritas Fire Engineering, Inc.
4
07-02-14
PO BOX 3940
Avon, Colorado 80620
970 748 8888 Office
970 827 9126 Fax
MERIDIAN INTERMOUNTAIN
14-679
Vail Fire & Emergency Services
08/19/14