Loading...
HomeMy WebLinkAboutFP-4.pdfThis system as shown on company print no dated for at contract no is designed to discharge at a rate of a maximum area of when supplied with water at a rate of Occupancy classification: Commodity classification: Maximum storage height: Storage arrangement: Number of heads flowing: System Type: Maximum velocity: Flow from In-Rack sprinklers: Flow from Overhead sprinklers: Flow from Inside Hoses: Flow from Outside Hoses: Other fixed flows: Total flow in system piping: Additional flow at/beyond source: Total of all flows: Calculation results for Design Area JSPIWðߛ/PLQPðߜRIIORRUDUHDRYHU - Surplus Pressure at Source: Pressure Required at Source: Pressure Available at Source: at at the base of the riser. Hose stream allowance of is included in the above. 1 Main Floor Meridian Fire Intermountain 6-27-14 Cummings Residence 4936 Juniper Lane 14-679 0.1 IWð 80.6 gpm 83.4 psi R3 4 Wet 10.16 ft/s 0 gpm 80.6 gpm 0 gpm 0 gpm 0 gpm 80.6 gpm 100 gpm 180.6 gpm 83.4 psi 88.8 psi 5.4 psi REVISIONS: PROJECT NUMBER: ISSUE: PERMIT SET OF DRAWN BY: BAE CHECKED BY: JLD/KLM FIRE PROTECTION CONTRACTOR 12364 W. Alameda Pkwy Ste. 135 Lakewood, Colorado 80228 303-985-3300 Office 303-985-5594 Fax www.veritasfire.com 4 DATE: 06-27-14 COPYRIGHT 2014 This document is an instrument of service, and as such, remains the property of the Engineer. Permission for use of this document is limited and can be extended only by written agreement with Veritas Fire Engineering, Inc. 4 07-02-14 PO BOX 3940 Avon, Colorado 80620 970 748 8888 Office 970 827 9126 Fax MERIDIAN INTERMOUNTAIN 14-679 Vail Fire & Emergency Services 08/19/14