Loading...
HomeMy WebLinkAboutsummary.pdfHydraulic Summary Report Description: Light HazardJob Number: 2 Node Flow(gpm) Total Hose Streams 100.00 Safety MarginRequiredAvailable Node Hose Flow Static Residual Flow Total Demand (gpm) (psi) (psi) (gpm) (psi) (gpm) (psi) (psi) @@Name 1 130.275 85.838 44.4371067.00100.00 126.000130.500 211.32Water Supply Design EngineerJob Number Total Water Required (Including Hose Allowance) 211.32 Maximum Pressure Unbalance In Loops 0.000 Additional Hose Supplies 100.00 Hose Allowance At Source Supplies 98.60gal Light Hazard 0.100gpm/ft² 256.00ft² 1500.00ft² (Actual 179.18ft²) 3 Occupancy Area of Application Coverage Per SprinklerNumber Of Sprinklers Calculated Density Job Suffix AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area Volume capacity of Dry PipesVolume capacity of Wet Pipes 2.55 between nodes 1 and 3Maximum Velocity Under Ground 27.28 between nodes 4 and 6Maximum Velocity Above Ground 5.8 K-Factor 25.60 at 19.482 Most Demanding Sprinkler Data System Job Site/Building AHJ PINOS DEL NORTE Job State Certification/License NumberJob Name: 2 Contractor Contractor Number Name of Contractor: Address 1 Address 2 Contact Name Contact Title ExtensionPhone FAX E-mail Web-SiteAddress 3 Address 1 Address 2 Drawing Name level 2 BH System Flow Demand 111.32 Remote Area(s) Address 3 8/21/2014© M.E.P.CAD, Inc.Page 2AutoSPRINK® VR10 v10.0.55.0 2:43:53PM